Power Government Departments Closing in 3 days TDR #56984896

Tender For Under The Work Area Of Executive Engineer, Electricity Urban Distribution Division-Jansath, Muzaffarnagar Subordinate Subdivision Officer, Electricity Distribution Subdivision-Jansath, Meerapur & Purqazi-Muzaffarnagar, Under The Deposit Sc

Issued by Government Departments · Muzaffarnagar, Uttar Pradesh
Tender Value
21.18 Lakhs
Estimated cost
Bid Submission
25 Aug 2026
3 days left
EMD
21200
Bank guarantee accepted
Document Fee
3540
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Muzaffarnagar → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Under The Work Area Of Executive Engineer, Electricity Urban Distribution Division-Jansath, Muzaffarnagar Subordinate Subdivision Officer, Electricity Distribution Subdivision-Jansath, Meerapur & Purqazi-Muzaffarnagar, Under The Deposit Scheme, As Per The Application Made By The Applicants Through Jhatpat/Nivesh Mitra Portal, Domestic Light Fan/Commercial/Industrial And Other Category Electricity Connections, The Works Like Construction Of Ht/Lt Line With Double Pole And Shifting Of Installed Line/Electric Pole And Other Electrical Material To Other Place Etc. Should Be Done Through Running Contract Through An External Agency.

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 18-Aug-2026 DATE EXTENSION Date 21-Aug-2026
2 21-Aug-2026 DATE EXTENSION 1 Date 25-Aug-2026

BOQ

Name of Work:- Under the work area of Executive Engineer, Electricity Urban Distribution Division-Jansath, Muzaffarnagar Subordinate Subdivision Officer, Electricity Distribution Subdivision-Jansath, Meerapur & Purqazi-Muzaffarnagar, under the Deposit Scheme, as per the application made by the applicants through Jhatpat/Nivesh Mitra portal, domestic light fan/commercial/industrial and other category electricity connections, the works like construction of HT/LT line with double pole and shifting of installed line/electric pole and other electrical material to other place etc. should be done through running contract through an external agency.
Sl. No. Item Description
1The work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km)
233 KV VCB with Steel Structure as per Required Size
333 KV Control Pannel for Double Power Transformer
433 KV Control Pannel for Single Power Transformer
533 KV CT as per Required Size
633 KV Metering Cubical Unit Required as per Size
733 KV CT/PT Metering Pole Mounted Unit Required as per Size
833 KV Outdoor Jointing Kit Required as per Size
933 KV Indoor Jointing Kit Required as per Size
1033 KV XLPE Cable 3x120 Sqmm
1133 KV XLPE Cable 3x185 Sqmm
1233 KV XLPE Cable 3x300 Sqmm
13250 KVA Distribution Transformer
14100 KVA Distribution Transformer
1563 KVA Distribution Transformer
1625 KVA Distribution Transformer
1710 KVA Distribution Transformer
18PCC Pole 8.5/9.0 Meter
19STP Pole 11 Meter
20STP Pole 13 Meter
21ACSR Weasel Conductor
22ACSR Dog Conductor
23ACSR Rabbit Conductor
24LT XLPE Cable AL. 3.5x50 Sqmm
25LT XLPE Cable AL. 3.5x70 Sqmm
26LT XLPE Cable AL. 3.5x150 Sqmm
27LT XLPE Cable AL. 3.5x240 Sqmm
28LT XLPE Cable AL. 3.5x400 Sqmm
29LT XLPE Cable AL. 1x70 Sqmm
30LT XLPE Cable AL. 1x120 Sqmm
31LT XLPE Cable AL. 1x240 Sqmm
32LT XLPE Cable AL. 1x400 Sqmm
3311 KV XLPE Cable 3x70 Sqmm
3411 KV XLPE Cable 3x120 Sqmm
3511 KV XLPE Cable 3x185 Sqmm
3611 KV XLPE Cable 3x300 Sqmm
37LT ABC 1x16+1x25 Sqmm
38LT ABC 3x50+1x35+1x16 Sqmm
39LT ABC 3x95+1x70+1x16 Sqmm
40LT ABC 3x120+1x95+1x16 Sqmm
4111 KV FUSE SET
4211 KV TPMO
4311 KV CT/PT Combiend Unit Required as per Size
4411 KV PILFER RESISTANT Meter Cubical Required as per Size
4511 KV Outdoor Jointing Kit Required as per Size
4611 KV Indoor Jointing Kit Required as per Size
4711 KV VCB I/C & O/G as per Required Size
481Ph Distribution Box
493Ph Distribution Box
50LINE MATERIAL (Pin/Disc Insulator, X-Arm, ANGLE, CHANNEL ETC.)
51Complete work of installing the electrical material received from the store center at the site.
52Complete work of Laying/Installing ACSR WEASEL CONDUCTOR on the established electric poles installed as per RESPO norms.
53Complete work of Laying/Installing ACSR DOG CONDUCTOR on the established electric poles installed as per RESPO norms.
54Complete work of Laying/Installing ACSR RABBIT CONDUCTOR on the established electric poles installed as per RESPO norms.
55Complete work of 33 KV XLPE CABLE 3x120 Sqmm on the established electric poles installed as per RESPO norms.
56Complete work of 33 KV XLPE CABLE 3x185 Sqmm on the established electric poles installed as per RESPO norms.
57Complete work of 33 KV XLPE CABLE 3x300 Sqmm on the established electric poles installed as per RESPO norms.
58Complete work of 11 KV XLPE CABLE 3x70 Sqmm on the established electric poles installed as per RESPO norms.
59Complete work of 11 KV XLPE CABLE 3x120 Sqmm on the established electric poles installed as per RESPO norms.
60Complete work of 11 KV XLPE CABLE 3x185 Sqmm on the established electric poles installed as per RESPO norms.
61Complete work of 11 KV XLPE CABLE 3x300 Sqmm on the established electric poles installed as per RESPO norms.
62Complete work of LT ABC 1x16+1x25 Sqmm on the established electric poles installed as per RESPO norms.
63Complete work of LT ABC 3x50+1x35+1x16 Sqmm on the established electric poles installed as per RESPO norms.
64Complete work of LT ABC 3x95+1x70+1x16 Sqmm on the established electric poles installed as per RESPO norms.
65Complete work of LT ABC 3x120+1x95+1x16 Sqmm on the established electric poles installed as per RESPO norms.
66Digging & laying of 11 KV Cable (Single ckt) in trench with sand & brick and back filling as per RESPO norms. Sand & Brick other necessary Decentralized material will be provide by the Contractor/Firm.
67Digging & laying of 11 KV Cable (Double ckt) in trench with sand & brick and back filling as per RESPO norms. Sand & Brick other necessary Decentralized material will be provide by the Contractor/Firm.
68Laying of HDPE Pipe for laying of XLPE Cable( as per Required size) with HDD (trenchless) method including cable laying for Road crossing. Necessary Decentralized material will be provide by the Contractor/Firm.
69Work of Fixing/Installing Single Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm.
70Work of Fixing/Installing Double Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm.
71Work of Fixing/Installing Try Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel, Stone pad etc. and decentralized material will be provide by the Contractor/Firm.
72Work of Fixing/Installing Four Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel, Stone pad etc. and decentralized material will be provide by the Contractor/Firm.
73Work of Fixing/Installing Single Pole of the STP Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm.
74Work of Fixing/Installing Double Pole of the STP Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm.
75Work of Fixing/Installing Try Pole of the STP Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel, Stone pad etc. and decentralized material will be provide by the Contractor/Firm.
76Work of Fixing/Installing Four Pole of the STP Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel, Stone pad etc. and decentralized material will be provide by the Contractor/Firm.
77Complete construction work of Plinth and Foundation / Structure for installing 33 KV VCB as per RESPO standards. In which bricks, sand, cement and other decentralized materials will be provide by the contractor / Firm.
78Complete work of installation and commissioning of 33 KV VCB as per RESPO standards.
79Complete work of installation and commissioning of 33 KV Control Pannel for Double TF as per RESPO standards.
80Complete work of installation and commissioning of 33 KV Control Paneel for Single TF as per RESPO standards.
81Complete work of installation and commissioning of New 33 KV CT. as per RESPO standards.
82Complete work of installation and commissioning of 11 KV VCB. as per RESPO standards.
83Complete work of Installing and Commissioning 10 KVA Distribution Transformer on established Single pole as per RESPO standards.
84Complete work of Installing and Commissioning 25 KVA Distribution Transformer on established Double pole as per RESPO standards.
85Complete work of Installing and Commissioning 63 KVA Distribution Transformer on established Double pole as per RESPO standards.
86Complete work of Installing and Commissioning 100 KVA Distribution Transformer on established Double pole as per RESPO standards.
87Complete work of Installing and Commissioning 250 KVA Distribution Transformer on established Plinth as per RESPO standards.
8825 KVA distribution transformer installed at the site was safely unloaded and the complete work of commissioning the transformer was installed on the established Double Pole prepared at the shifting place as per RESPO standards.
8963 KVA distribution transformer installed at the site was safely unloaded and the complete work of commissioning the transformer was installed on the established Double Pole prepared at the shifting place as per RESPO standards.
90100 KVA distribution transformer installed at the site was safely unloaded and the complete work of commissioning the transformer was installed on the established Double Pole prepared at the shifting place as per RESPO standards.
91Complete work of Making New plinth (Size 2x2x1.5 Meter) for 250 KVA Distribution Transformer as per RESPO standards. In which cement, sand and other necessary Decentralized material will be provide by the Contractor/Firm.
92Complete work of Making New Fencing for 250 KVA Distribution Transformer as per RESPO standards. In which cement, sand and other necessary Decentralized material will be provide by the Contractor/Firm.
93Complete work of Installing and Commissioning LT FUSE SET with SMC BOX on established 25 KVA, 63 KVA & 100 KVA Distribution Transformer. as per RESPO standards. necessary Decentralized material will be provide by the Contractor/Firm.
94Complete work of Installing and Commissioning LT incoming panel with metering equipment, Fuse & fixing arrangement (LS) on established 160 KVA, 250 KVA, 400 KVA & Above Distribution Transformer as per RESPO standards.
95Complete work of Installing and Commissioning Tailless Fuse Unit Installation (Marble Stone Distribution Board Double Ckt with M S Angle Frame Complete in all Respect and all necessary decentralized material will be provide by the Contractor/Firm.) on established 11/0.4 KV 160 KVA & 250 KVA Distribution Transformer as per RESPO standards.
96Complete work of Installing and Commissioning 33 KV CT/PT Pole Mounted Unit on established Double pole as per RESPO standards.
97Complete work of Installing and Commissioning 33 KV METERING CUBICAL UNIT as per RESPO standards.
98Complete work of Installing and Commissioning 33 KV Outdoor Jointing Kit as per RESPO standards.
99Complete work of Installing and Commissioning 33 KV Indoor Jointing Kit as per RESPO standards.
100Complete work of Installing and Commissioning 11 KV CT/PT Pole Mounted Unit on established Double pole as per RESPO standards.
101Complete work of Installing and Commissioning 11 KV PILFER RESISTANT Meter Cubical as per RESPO standards.
102Complete work of Installing and Commissioning LT 1P Distribution Box as per RESPO standards.
103Complete work of Installing and Commissioning LT 3P Distribution Box as per RESPO standards.
104Complete work of Installing and Commissioning 11 KV Outdoor Jointing Kit as per RESPO standards.
105Complete work of Installing and Commissioning 11 KV Indoor Jointing Kit as per RESPO standards.
106Complete work of Installing and Commissioning 11 KV Fuse Set as per RESPO standards.
107Complete work of Installing and Commissioning 11 KV TPMO as per RESPO standards.
108Complete work of installation of Stay Set Complete with Concreting on established Double pole & Single Pole of Line As per the RESPO standards.
109Complete work of Pipe Earthing (upto Water Level) of established Distribution Transformer / CT/PT UNIT & Meter Cubicle as per RESPO standards.
110Complete work of Chemical Earthing of established Distribution Transformer / CT/PT UNIT & Meter Cubicle as per RESPO standards.
111Complete work of straightening slanted electric pole as per RESPO standards.
112Complete work of Pole concreting on established Pole as per RESPO standards. In which cement, sand and other necessary decentralized material will be provide by the Contractor/Firm.
113Complete work of Earthing completing by establishing earthing road of Stablished Pole as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.
114Complete work of guarding on the established Pole of the Line as per RESPO standards. by GI wire and MS angle as per size. In which decentralized material will be provide by the Contractor/Firm.
115Complete work of dismantling L.T. Line to be shifted as per RESPO standards from safety point of view. Electric poles/conductors etc. installed in the said line and necessary materials will be dismantled. There should be no damage to departmental material while doing the above work.
116Complete work of dismantling 11 KV Line to be shifted as per RESPO standards from safety point of view. Electric poles/conductors etc. installed in the said line and necessary materials will be dismantled. There should be no damage to departmental material while doing the above work.
117Complete work of dismantling 33 KV Line to be shifted as per RESPO standards from safety point of view. Electric poles/conductors etc. installed in the said line and necessary materials will be dismantled. There should be no damage to departmental material while doing the above work.
118Complete work of Pulling / Resaging the Span wires by shifting the Line / Electric pole as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.
119Complete work of Road Restoration Charges for Footpath Side as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.
120Complete work of Tying/Binding Number Plate on establishing Four Pole/ Double Pole/ Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.
121Complete work of Tying/Binding Danger Board on establishing Four Pole /Double Pole/ Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.
122Complete work of Tying Barbed Wire on establishing Four Pole/ Double Pole/ Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.
123Complete work of Pole Painting (Aluminium Paint) on establishing Four Pole/ Double Pole/ Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.
124Complete work of Pole Painting (Red Oxide Paint) on establishing Four Pole/ Double Pole/ Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.
125Complete work of cutting and pruning the branches of trees standing between the Line installed and shifting place/route.
126Supply of Nut & Bolts as per RESPO standards
127Supply of Dead & Clamp as per RESPO standards
128Supply of LT Clamp as per RESPO standards
129Supply of Suspension Clamp as per RESPO standards
130Supply of Piercing Clamp as per RESPO standards
131Supply of Top Clamp as per RESPO standards
132Supply of DP Clamp as per RESPO standards
133Supply of LT Shakle Insulator as per RESPO standards
134Supply of X-Arm Holding Clamp with nut & bolts as per RESPO standards
135Supply of Crimping Lugs as per RESPO standards
136Supply of F-Clamp / F-Bracket as per RESPO standards
137Supply of Stone Pad as per RESPO standards
138Supply of P.G. Clamp as per RESPO standards
139Supply of J-Hook as per RESPO standards
140Supply of Packing piece and clamp for above with Nut & Bolts as per RESPO standards
141Supply of Earth wire Clamp with Nut & Bolts as per RESPO standards
142Supply of Amour rod with ferules for DOG as per RESPO standards
143Supply of Bolt Nut & Washer as per RESPO standards
144Supply of Clamp for Ms Angle as per RESPO standards
145Supply of Clamp for Top Channel as per RESPO standards
146Supply of Aluminium Tape as per RESPO standards
147Supply of Number Plate with clamp as per RESPO standards
148Supply of Danger Board with Clamp as per RESPO standards
149Supply of Barbed wire as per RESPO standards
150Supply of Aluminium Paint as per RESPO standards
151Supply of Red Oxide Paint as per RESPO standards
152Supply of Control Cable 2x2.5 Sqmm as per RESPO standards
153Supply of Control Cable 4x2.5 Sqmm as per RESPO standards
154Supply of HDPE PIPE 120 mm as per RESPO standards
155Supply of HDPE PIPE 140 mm as per RESPO standards
156Supply of GI PIPE 6\\"DIA as per RESPO standards
157Supply of Incoming Stud for 400 Amp for Tailless Unit. as per RESPO standards
158Supply of Outgoing Stud for 400 Amp for Tailless Unit. as per RESPO standards
159Supply of Copper Bus Bar for Dist. Board Double Circuit for Tailless Unit. as per RESPO standards
160Supply of Copper Fuse Strip 240x10x3 mm for Tailless Unit. as per RESPO standards
161Supply of Crimping Lugs for Tailless Unit. as per RESPO standards
162Supply of Nut & Bolts for Tailless Unit. as per RESPO standards
163LT Fuse Set with SMC Box inculde Clamp with Nut & Bolts as per RESPO standards
164LT incoming panel with metering equipment, Fuse & fixing arrangement (LS)
165Sundry Items for Line Shifting Work
166Sundry Items for New Connection on LT Voltage
167Sundry Items for New Connection on 11 KV Voltage
168Sundry Items for New Connection on 33 KV Voltage
169As per rules, the work of delivering the old material includes loading and unloading on both sides from the site to Store Center Muzaffarnagar.
17025 KVA Distribution Transformer Old & Used / Damage
17163 KVA Distribution Transformer Old & Used / Damage
172100 KVA Distribution Transformer Old & Used / Damage
173250 KVA Distribution Transformer Old & Used / Damage
174ST Pole Old & Used / Damage
175PCC Pole Old & Used / Damage
176Weasel Conductor Old & Used / Damage
177Dog Conductor Old & Used / Damage
178Rabbit Conductor Old & Used / Damage
179XLPE Cable Old & Used / Damage
180LT Cable Old & Used / Damage
181Line Material (Insulator, Disc, X-Arm, Angle, Channel ETC.) Old & Used / Damage Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56984896
AUTHORITY Government Departments
TENDER VALUE 21.18 Lakhs
LAST DATE 25-08-2026
Authority
Authority Name Paschimanchal Vidyut Vitran Nigam Limited
Work Description Tender for Under The Work Area Of Executive Engineer, Electricity Urban Distribution Division-Jansath, Muzaffarnagar Subordinate Subdivision Officer, Electricity Distribution Subdivision-Jansath, Meerapur & Purqazi-Muzaffarnagar, Under The Deposit Scheme, As Per The Application Made By The Applicants Through Jhatpat/Nivesh Mitra Portal, Domestic Light Fan/Commercial/Industrial And Other Category Electricity Connections, The Works Like Construction Of Ht/Lt Line With Double Pole And Shifting Of Installed Line/Electric Pole And Other Electrical Material To Other Place Etc. Should Be Done Through Running Contract Through An External Agency.
Basic Detail
Tender No 21/2026-27/EDC-I MZN
Bidding Type Tender
Location
City Muzaffarnagar
State Uttar Pradesh
Key Dates
Publish Date 21 Aug 2026
Submission Date 25 Aug 2026
Open Date 25 Aug 2026
Finance
Tender Value 21.18 Lakhs
Tender Fee 3540
EMD 21200
Exemption Not Available
Document List
88ae65c3-1764-4a2e-a0ea-69edf4b43c71.html
BOQ_2211144.xls
Tenderform.pdf
Tendernotice_1 (36).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 21, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 21, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 25, 2026
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 3 days
Aug 25, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 3 days
Aug 25, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 3 days

Tender Documents

Download All (ZIP) ↓
html

88ae65c3-1764-4a2e-a0ea-69edf4b43c71.html

xls

BOQ_2211144.xls

pdf

Tenderform.pdf

pdf

Tendernotice_1 (36).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders