Tender For Construction Of Reinforced Cement Concrete Culvert At Different Spots At Tarzoo C Sopore Baramulla, Block Sopore, Under Pri, Fy 2026-27
Tender Value
4.89 Lakhs
Estimated cost
Bid Submission
01 Sep 2026
8 days left
EMD
9792
Bank guarantee accepted
Document Fee
200
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Baramulla → Jammu and Kashmir
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of Reinforced Cement Concrete Culvert At Different Spots At Tarzoo C Sopore Baramulla, Block Sopore, Under Pri, Fy 2026-27
BOQ
| Sl. No. | Item Description |
| 1 | Percentage BoQ BoQ_Ver4.0 Percentage Normal INR Only INR Select, At Par, Excess (+), Less (-) IOCL Select Excess (+) Less (-) Excess (+) Less (-) Tender Inviting Authority: EXECUTIVE ENGINEER REW Division BARAMULLA Name of Work:Construction of RCC Culvert at different spots at Tarzoo C Sopore Baramulla, Block Sopore, under PRI, FY 2026-27 Advertised Cost: 4.896 lacs Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # S. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes in Rs. P TOTAL AMOUNT With Taxes in Rs. P TOTAL AMOUNT In Words |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil |
| 3 | Providing /laying of stone soling handpacked under floors and foundation trenches including dressing, watering, compacting incl. plum and all carriage up to site of work complete job |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work up to plinth level: 1:2:4 (1 Cement : 2 coarse sand : 4 crushed graded stone aggregate 20 mm nominal size ) excld. carriage of all materials involved complete. |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for:columns pillars abutments etc |
| 6 | Providing and laying in position reinforced cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work up to plinth level: 1:1.5:3 (1 Cement : 1.5 coarse sand : 3 crushed graded stone aggregate 20 mm nominal size ) excld. carriage of all materials involved complete Raft |
| 7 | Steel reinforcement in RCC work including cutting fixing complete FE500 TMT Bars |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for-Slab, Suspended Floors etc |
| 9 | Carriage of Materials Sand/Aggregate for an avg lead of 25kms by MT |
| 10 | Providing /Fixing CIB including Photographs of work before, during & after execution of work complete job/railing/plaster and any unforseen item dewatering as per requirement Total in Figures 489574.14 489574.14 INR Four Lakh Eighty Nine Thousand Five Hundred Seventy Four & Paise Fourteen Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 INR Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Aug 12, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 01, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysSep 02, 2026
Bid Opening Date
Technical bids will be opened and evaluated.