Power Government Departments Closing in 0 days TDR #56979386

Bids Are invited for Custom Bid For Services - ---- - Erection,Installation, Commissioning Of Single Pole/Double Pole Of 11 Kv And Lt Kv Overhead/Underground Lines And Transformers By Completeing Following Works/Jobs As Per Respo Drawings/Estimate Wi

Issued by Government Departments · Mathura, Uttar Pradesh
Tender Value
3.21 Lakhs
Estimated cost
Bid Submission
24 Aug 2026
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Mathura → Uttar Pradesh
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Custom Bid For Services - ---- - Erection,Installation, Commissioning Of Single Pole/Double Pole Of 11 Kv And Lt Kv Overhead/Underground Lines And Transformers By Completeing Following Works/Jobs As Per Respo Drawings/Estimate With All Required Materials.Work Includes All Cartage, Carriage, Of Including Received Back Material. T&P, Raw Materials And Any Other Material/Work Which Is Required For Completion Of Said Work But Not Mentioned In This Boq/Estimate. , Carriage Of 8.5 Mtr Long Pcc Pole From 132 Kv Store Center Mathura To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. (Distance 00-70 Kms.) , Carriage Of Line Material I.E. Conductor, G.I. Wire Tpmo Stay Rod, Disc Insulator, Cross Arm, Angle Channel And Other Required Material From Store Center At 132 Kv Substation Mathura To The Site Of Work Including Loading And Unloading Of Material At Both Ends. , Erection Of Single Pole Structure 8.5 Mtrs Long Pcc Pole By Digging Of Pits Fitting Of All Relevant Accessories With Grouting In Ratio 1:4:8 Cement, Sand And Brick Ballast As Per Standard Norms. (Grouting Material Will Be Provided By Contractor) As Per Respo Norms. , Erection Of Double Pole Structure 8.5 Mtrs Long Pcc Pole By Digging Of Pits Fitting Of All Relevant Accessories With Grouting In Ratio 1:4:8 Cement, Sand And Brick Ballast As Per Standard Norms. (Grouting Material Will Be Provided By Contractor) As Per Respo Norms. , Mounting Of 250 Kva Transformer On The Double Pole Structures And Connections Thereof (Including Carriage Of Transformer From Store Centre, Mathura To Site Of Work With Loading & Unloading At Both Ends) , Construction Of Section Pole/T Pole For L.T./H.T. Line On The Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Including The Cost Of All Labour, T&P, Etc. Required For Proper Completion Of Work. , Installation Of Stay Set With Grouting And Nuzzling Etc. As Per Respo Drawing Along With All Routine Material To Be Used For Such Works. , Earthing Of Poles By Fixing Earthing Rods And Binding With Earth Wire As Per Standard Norms Including Cost Of Labour T&P And Required Material For Such Work. , Laying, Sagging Stringing And Binding Of Acsr Weasel Conductor On The Erected Pcc Pole/Stp Including Jumpering As Per Respo Manual. , Laying, Sagging Stringing And Binding Of Arial Bunch Conductor Size 3X120 Sqmm On The Erected Pcc Pole/Stp Including Jumpering As Per Respo Manual. , Installation Of Lt Incomming Pannel With Metering Equipment & Fixing Arrengment Including The Cost Of Accessories (Nut & Bolt, Pvc Tape Etc.) Required For Proper Completion Of Work Also Provided By The Contractor. (Including Carriage From Store Center Mathura To Site Of Work.) , Installation Of Henley Type Tailless Unit Protection Cubicle Pannel 500A, 650V For 250 Kva Dt Including The Cost Of Accessories (Nut & Bolt, Pvc Tape Etc.) Required For Proper Completion Of Work Also Provided By The Contractor. (Including Carriage From Store Center Mathura To Site Of Work.) , Installation Of With 4 Core Lt Mccb With Box Including The Cost Of Accessories (Nut & Bolt, Pvc Tape Etc.) Required For Proper Completion Of Work Also Provided By The Contractor. (Including Carriage From Store Center Mathura To Site Of Work.) , Installation Of 11 Kv Fuse Set As Per Respo Norms , Providing & Fixing Of Lt Cl With Nut & Bolt As Per Direction Of Supervising Engineer. , Providing & Fixing Of Suspention Cl With Nut & Bolt As Per Direction Of Supervising Engineer. , Providing & Fixing Of I Hook With I Bolt As Per Direction Of Supervising Engineer. , Providing & Fixing Of Dead End Cl As Per Direction Of Supervising Engineer. , Providing & Fixing Of Distribution Box With Cl As Per Direction Of Supervising Engineer. , Providing & Fixing Of Piercing Connector As Per Direction Of Supervising Engineer. , Providing & Fixing Of Piercing Connector As Per Direction Of Supervising Engineer. , Construction Of Plinth Of 250 Kva T/F Size 5X5x4 Above Ground Level And One. Ft. Below The Ground Level Of 9 After Excavation Of 4 Earth Brick Ballast Shall Be Provided And Hammering Will Be Done Properly. After That A Retaining Wall Of 9 Width By First Class Brick In Ratio 1:4 Of Cement And Sand Shall Be Made. The Earth Shall Be Filled Up To One Ft. Below The Top Of The Plinth. After This Brick Ballast Shall Be Provided Upto 6 From The Earth Level And Proper Hammering Shall Be Done. One No. Jall Of 12 Mm. Ms Tore Shall Be Fixed In The Hollow Of Plinth And One. Ft. Thick Rcc In Ration Of Cement, Sand And Stone Ballast Shall Be Laid On The Top Of The Plinth. The 12 Mm. Thick Plastering Shall Be Done All Around The Plinth In 1:4 Ratio Of Cement And Sand. The Contractor Shall Be Responsible To Complete The Work As Per Direction Of Supervision Engineer. It Includes The Cost Of All Material, Labour, T & P, Carrier Etc. Required For Proper Completion Of Work. , Body And Nutral Earthing Of 250 Kva Tranformers By Digging Of Pit Up To Water Level Depth And Then Inserting 1-1/6 Dia Gi Pipe Of B Grade, Conforming To The Requirement Of Is Specification And Then Connecting The Top Of The Inserted Pipe And Transformer Body Through Gi Strip Of Size 50 X 6 Mm With The Help Of Nut And Bolt Or Through Gas Welding, As Per Direction Of Supervising Engineer. It Includes The Cost Of All Material, Laborer, T&P, Carrier Etc. Required For Proper Completion Of Work. , Wire Mesh Fencing With Foldable Gate Hight Minimum 06 Feet (Rate Shold Be Running Per Meter) Including Painting Of Fencing With Red Oxide And Yellow Enamel Paint And With Proper Grouting Erection And Construction Of Toe-Wall Around The Transformer Plinth Including Making Wall 9 Inch Wide & 30 Cm. Under The Ground Level And 30 Cm. Up To The Ground Level And Making Pocket Filling The Concreting For Grouting As Per Direction By Supervising Engineer And Plastering Around The Wall In Ratio 1:4 Cement And Sand (As Per Approved Gtp). All Material/Labour Will Be Arranged By The Contractor.

BOQ

Sl. No. Item TitleItem Description
1Erection,Installation, Commissioning of Single Pole/Double Pole of 11 KV and LT KV Overhead/Underground Lines and Transformers By Completeing Following Works/Jobs As Per Respo Drawings/Estimate With all required Materials.Work Includes All Cartage, Carriage, of including Received Back Material. T&P, Raw Materials And Any Other Material/Work Which Is Required For Completion of Said Work But Not Mentioned In This Boq/Estimate.Erection,Installation, Commissioning of Single Pole/Double Pole of 11 KV and LT KV Overhead/Underground Lines and Transformers By Completeing Following Works/Jobs As Per Respo Drawings/Estimate With all required Materials.Work Includes All Cartage, Carriage, of including Received Back Material. T&P, Raw Materials And Any Other Material/Work Which Is Required For Completion of Said Work But Not Mentioned In This Boq/Estimate.
2Carriage of 8.5 Mtr Long PCC Pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. (Distance 00-70 Kms.)Carriage of 8.5 Mtr Long PCC Pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. (Distance 00-70 Kms.)
3Carriage of Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at 132 KV substation Mathura to the site of work including loading and unloading of material at both ends.Carriage of Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at 132 KV substation Mathura to the site of work including loading and unloading of material at both ends.
4Erection of Single pole structure 8.5 Mtrs Long PCC Pole by digging of pits fitting of all relevant accessories with grouting in ratio 1:4:8 cement, sand and brick ballast as per standard norms. (Grouting material will be provided by contractor) as per RESPO norms.Erection of Single pole structure 8.5 Mtrs Long PCC Pole by digging of pits fitting of all relevant accessories with grouting in ratio 1:4:8 cement, sand and brick ballast as per standard norms. (Grouting material will be provided by contractor) as per RESPO norms.
5Erection of Double pole structure 8.5 Mtrs Long PCC Pole by digging of pits fitting of all relevant accessories with grouting in ratio 1:4:8 cement, sand and brick ballast as per standard norms. (Grouting material will be provided by contractor) as per RESPO norms.Erection of Double pole structure 8.5 Mtrs Long PCC Pole by digging of pits fitting of all relevant accessories with grouting in ratio 1:4:8 cement, sand and brick ballast as per standard norms. (Grouting material will be provided by contractor) as per RESPO norms.
6Mounting of 250 KVA Transformer on the Double pole Structures and connections thereof (including Carriage of Transformer from Store Centre, Mathura to site of work with loading & unloading at both ends)Mounting of 250 KVA Transformer on the Double pole Structures and connections thereof (including Carriage of Transformer from Store Centre, Mathura to site of work with loading & unloading at both ends)
7Construction of Section pole/“T” pole for L.T./H.T. line on the erected pole as per RESPO manual and as per direction of supervising engineer. It including the cost of all labour, T&P, etc. required for proper completion of work.Construction of Section pole/“T” pole for L.T./H.T. line on the erected pole as per RESPO manual and as per direction of supervising engineer. It including the cost of all labour, T&P, etc. required for proper completion of work.
8Installation of stay set with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works.Installation of stay set with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works.
9Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.
10Laying, sagging stringing and binding of ACSR Weasel Conductor on the erected PCC pole/STP including jumpering as per RESPO manual.Laying, sagging stringing and binding of ACSR Weasel Conductor on the erected PCC pole/STP including jumpering as per RESPO manual.
11Laying, sagging stringing and binding of Arial Bunch Conductor size 3x120 sqmm on the erected PCC pole/STP including jumpering as per RESPO manual.Laying, sagging stringing and binding of Arial Bunch Conductor size 3x120 sqmm on the erected PCC pole/STP including jumpering as per RESPO manual.
12Installation of LT Incomming Pannel with metering equipment & fixing arrengment including the cost of accessories (Nut & Bolt, PVC Tape etc.) required for proper completion of work also provided by the contractor. (including carriage from Store Center Mathura to Site of work.)Installation of LT Incomming Pannel with metering equipment & fixing arrengment including the cost of accessories (Nut & Bolt, PVC Tape etc.) required for proper completion of work also provided by the contractor. (including carriage from Store Center Mathura to Site of work.)
13Installation of Henley Type Tailless unit protection Cubicle Pannel 500A, 650V for 250 KVA DT including the cost of accessories (Nut & Bolt, PVC Tape etc.) required for proper completion of work also provided by the contractor. (including carriage from Store Center Mathura to Site of work.)Installation of Henley Type Tailless unit protection Cubicle Pannel 500A, 650V for 250 KVA DT including the cost of accessories (Nut & Bolt, PVC Tape etc.) required for proper completion of work also provided by the contractor. (including carriage from Store Center Mathura to Site of work.)
14Installation of with 4 Core LT MCCB with Box including the cost of accessories (Nut & Bolt, PVC Tape etc.) required for proper completion of work also provided by the contractor. (including carriage from Store Center Mathura to Site of work.)Installation of with 4 Core LT MCCB with Box including the cost of accessories (Nut & Bolt, PVC Tape etc.) required for proper completion of work also provided by the contractor. (including carriage from Store Center Mathura to Site of work.)
15Installation of 11 KV Fuse Set as per RESPO NormsInstallation of 11 KV Fuse Set as per RESPO Norms
16Providing & Fixing of LT Clamp with Nut & Bolt as per direction of supervising engineer.Providing & Fixing of LT Clamp with Nut & Bolt as per direction of supervising engineer.
17Providing & Fixing of Suspention Clamp with Nut & Bolt as per direction of supervising engineer.Providing & Fixing of Suspention Clamp with Nut & Bolt as per direction of supervising engineer.
18Providing & Fixing of I Hook with I Bolt as per direction of supervising engineer.Providing & Fixing of I Hook with I Bolt as per direction of supervising engineer.
19Providing & Fixing of Dead end Clamp as per direction of supervising engineer.Providing & Fixing of Dead end Clamp as per direction of supervising engineer.
20Providing & Fixing of Distribution Box with Clamp as per direction of supervising engineer.Providing & Fixing of Distribution Box with Clamp as per direction of supervising engineer.
21Providing & Fixing of Piercing Connector as per direction of supervising engineer.Providing & Fixing of Piercing Connector as per direction of supervising engineer.
22Providing & Fixing of Piercing Connector as per direction of supervising engineer.Providing & Fixing of Piercing Connector as per direction of supervising engineer.
23Construction of plinth of 250 KVA T/f size 5’x5’x4’ above ground level and one. Ft. below the ground level of 9’’ after excavation of 4 earth brick ballast shall be provided and hammering will be done properly. After that a retaining wall of 9 width by first class brick in ratio 1:4 of cement and sand shall be made. The earth shall be filled up to one ft. below the top of the plinth. after this brick ballast shall be provided upto 6 from the earth level and proper hammering shall be done. One No. Jall of 12 mm. MS tore shall be fixed in the hollow of plinth and one. Ft. thick RCC in ration of cement, sand and stone ballast shall be laid on the top of the plinth. The 12 mm. thick plastering shall be done all around the plinth in 1:4 ratio of cement and sand. The contractor shall be responsible to complete the work as per direction of Supervision Engineer. It includes the cost of all material, labour, T & P, carrier etc. required for proper completion of work.Construction of plinth of 250 KVA T/f size 5’x5’x4’ above ground level and one. Ft. below the ground level of 9’’ after excavation of 4 earth brick ballast shall be provided and hammering will be done properly. After that a retaining wall of 9 width by first class brick in ratio 1:4 of cement and sand shall be made. The earth shall be filled up to one ft. below the top of the plinth. after this brick ballast shall be provided upto 6 from the earth level and proper hammering shall be done. One No. Jall of 12 mm. MS tore shall be fixed in the hollow of plinth and one. Ft. thick RCC in ration of cement, sand and stone ballast shall be laid on the top of the plinth. The 12 mm. thick plastering shall be done all around the plinth in 1:4 ratio of cement and sand. The contractor shall be responsible to complete the work as per direction of Supervision Engineer. It includes the cost of all material, labour, T & P, carrier etc. required for proper completion of work.
24Body and Nutral Earthing of 250 KVA Tranformers by digging of pit up to water level depth and then inserting 1-1/6” dia GI pipe of “B” grade, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 50 x 6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. It includes the cost of all material, laborer, T&P, carrier etc. required for proper completion of work.Body and Nutral Earthing of 250 KVA Tranformers by digging of pit up to water level depth and then inserting 1-1/6” dia GI pipe of “B” grade, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 50 x 6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. It includes the cost of all material, laborer, T&P, carrier etc. required for proper completion of work.
25Wire Mesh Fencing with foldable Gate hight minimum 06 feet (Rate shold be running per meter) including painting of Fencing with Red Oxide and Yellow enamel paint and with proper grouting Erection and construction of Toe-wall around the transformer plinth including making wall 9 inch wide & 30 cm. under the ground level and 30 cm. up to the ground level and making pocket Filling the concreting for grouting as per direction by supervising engineer and plastering around the wall in ratio 1:4 cement and sand (as per approved GTP). All material/labour will be arranged by the contractor.Wire Mesh Fencing with foldable Gate hight minimum 06 feet (Rate shold be running per meter) including painting of Fencing with Red Oxide and Yellow enamel paint and with proper grouting Erection and construction of Toe-wall around the transformer plinth including making wall 9 inch wide & 30 cm. under the ground level and 30 cm. up to the ground level and making pocket Filling the concreting for grouting as per direction by supervising engineer and plastering around the wall in ratio 1:4 cement and sand (as per approved GTP). All material/labour will be arranged by the contractor.

AI Tender Summary

OUR REF NO 56979386
AUTHORITY Government Departments
TENDER VALUE 3.21 Lakhs
LAST DATE 24-08-2026
Authority
Authority Name Uttar Pradesh Power Corporation Limited
Work Description Bids Are invited for Custom Bid For Services - ---- - Erection,Installation, Commissioning Of Single Pole/Double Pole Of 11 Kv And Lt Kv Overhead/Underground Lines And Transformers By Completeing Following Works/Jobs As Per Respo Drawings/Estimate With All Required Materials.Work Includes All Cartage, Carriage, Of Including Received Back Material. T&P, Raw Materials And Any Other Material/Work Which Is Required For Completion Of Said Work But Not Mentioned In This Boq/Estimate. , Carriage Of 8.5 Mtr Long Pcc Pole From 132 Kv Store Center Mathura To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. (Distance 00-70 Kms.) , Carriage Of Line Material I.E. Conductor, G.I. Wire Tpmo Stay Rod, Disc Insulator, Cross Arm, Angle Channel And Other Required Material From Store Center At 132 Kv Substation Mathura To The Site Of Work Including Loading And Unloading Of Material At Both Ends. , Erection Of Single Pole Structure 8.5 Mtrs Long Pcc Pole By Digging Of Pits Fitting Of All Relevant Accessories With Grouting In Ratio 1:4:8 Cement, Sand And Brick Ballast As Per Standard Norms. (Grouting Material Will Be Provided By Contractor) As Per Respo Norms. , Erection Of Double Pole Structure 8.5 Mtrs Long Pcc Pole By Digging Of Pits Fitting Of All Relevant Accessories With Grouting In Ratio 1:4:8 Cement, Sand And Brick Ballast As Per Standard Norms. (Grouting Material Will Be Provided By Contractor) As Per Respo Norms. , Mounting Of 250 Kva Transformer On The Double Pole Structures And Connections Thereof (Including Carriage Of Transformer From Store Centre, Mathura To Site Of Work With Loading & Unloading At Both Ends) , Construction Of Section Pole/T Pole For L.T./H.T. Line On The Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Including The Cost Of All Labour, T&P, Etc. Required For Proper Completion Of Work. , Installation Of Stay Set With Grouting And Nuzzling Etc. As Per Respo Drawing Along With All Routine Material To Be Used For Such Works. , Earthing Of Poles By Fixing Earthing Rods And Binding With Earth Wire As Per Standard Norms Including Cost Of Labour T&P And Required Material For Such Work. , Laying, Sagging Stringing And Binding Of Acsr Weasel Conductor On The Erected Pcc Pole/Stp Including Jumpering As Per Respo Manual. , Laying, Sagging Stringing And Binding Of Arial Bunch Conductor Size 3X120 Sqmm On The Erected Pcc Pole/Stp Including Jumpering As Per Respo Manual. , Installation Of Lt Incomming Pannel With Metering Equipment & Fixing Arrengment Including The Cost Of Accessories (Nut & Bolt, Pvc Tape Etc.) Required For Proper Completion Of Work Also Provided By The Contractor. (Including Carriage From Store Center Mathura To Site Of Work.) , Installation Of Henley Type Tailless Unit Protection Cubicle Pannel 500A, 650V For 250 Kva Dt Including The Cost Of Accessories (Nut & Bolt, Pvc Tape Etc.) Required For Proper Completion Of Work Also Provided By The Contractor. (Including Carriage From Store Center Mathura To Site Of Work.) , Installation Of With 4 Core Lt Mccb With Box Including The Cost Of Accessories (Nut & Bolt, Pvc Tape Etc.) Required For Proper Completion Of Work Also Provided By The Contractor. (Including Carriage From Store Center Mathura To Site Of Work.) , Installation Of 11 Kv Fuse Set As Per Respo Norms , Providing & Fixing Of Lt Cl With Nut & Bolt As Per Direction Of Supervising Engineer. , Providing & Fixing Of Suspention Cl With Nut & Bolt As Per Direction Of Supervising Engineer. , Providing & Fixing Of I Hook With I Bolt As Per Direction Of Supervising Engineer. , Providing & Fixing Of Dead End Cl As Per Direction Of Supervising Engineer. , Providing & Fixing Of Distribution Box With Cl As Per Direction Of Supervising Engineer. , Providing & Fixing Of Piercing Connector As Per Direction Of Supervising Engineer. , Providing & Fixing Of Piercing Connector As Per Direction Of Supervising Engineer. , Construction Of Plinth Of 250 Kva T/F Size 5X5x4 Above Ground Level And One. Ft. Below The Ground Level Of 9 After Excavation Of 4 Earth Brick Ballast Shall Be Provided And Hammering Will Be Done Properly. After That A Retaining Wall Of 9 Width By First Class Brick In Ratio 1:4 Of Cement And Sand Shall Be Made. The Earth Shall Be Filled Up To One Ft. Below The Top Of The Plinth. After This Brick Ballast Shall Be Provided Upto 6 From The Earth Level And Proper Hammering Shall Be Done. One No. Jall Of 12 Mm. Ms Tore Shall Be Fixed In The Hollow Of Plinth And One. Ft. Thick Rcc In Ration Of Cement, Sand And Stone Ballast Shall Be Laid On The Top Of The Plinth. The 12 Mm. Thick Plastering Shall Be Done All Around The Plinth In 1:4 Ratio Of Cement And Sand. The Contractor Shall Be Responsible To Complete The Work As Per Direction Of Supervision Engineer. It Includes The Cost Of All Material, Labour, T & P, Carrier Etc. Required For Proper Completion Of Work. , Body And Nutral Earthing Of 250 Kva Tranformers By Digging Of Pit Up To Water Level Depth And Then Inserting 1-1/6 Dia Gi Pipe Of B Grade, Conforming To The Requirement Of Is Specification And Then Connecting The Top Of The Inserted Pipe And Transformer Body Through Gi Strip Of Size 50 X 6 Mm With The Help Of Nut And Bolt Or Through Gas Welding, As Per Direction Of Supervising Engineer. It Includes The Cost Of All Material, Laborer, T&P, Carrier Etc. Required For Proper Completion Of Work. , Wire Mesh Fencing With Foldable Gate Hight Minimum 06 Feet (Rate Shold Be Running Per Meter) Including Painting Of Fencing With Red Oxide And Yellow Enamel Paint And With Proper Grouting Erection And Construction Of Toe-Wall Around The Transformer Plinth Including Making Wall 9 Inch Wide & 30 Cm. Under The Ground Level And 30 Cm. Up To The Ground Level And Making Pocket Filling The Concreting For Grouting As Per Direction By Supervising Engineer And Plastering Around The Wall In Ratio 1:4 Cement And Sand (As Per Approved Gtp). All Material/Labour Will Be Arranged By The Contractor.
Basic Detail
Tender No GEM/2026/B/7910128
Bidding Type Tender
Location
City Mathura
State Uttar Pradesh
Key Dates
Publish Date 12 Aug 2026
Submission Date 24 Aug 2026
Open Date 24 Aug 2026
Finance
Tender Value 3.21 Lakhs
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
3a4eb14a-3081-4b25-996b-b4a780533db4.pdf
1786533585.pdf
1786533594.pdf
1786533599.pdf
1786533600.pdf
1786533696.pdf
1786533757.pdf
1786534398.xlsx
ATC17_2471efd2-7594-4536-9f941786534202593_EDC1MATHURABUYER.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 12, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 24, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Today
Aug 24, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Today

Tender Documents

Download All (ZIP) ↓
pdf

3a4eb14a-3081-4b25-996b-b4a780533db4.pdf

pdf

1786533585.pdf

pdf

1786533594.pdf

pdf

1786533599.pdf

pdf

1786533600.pdf

pdf

1786533696.pdf

pdf

1786533757.pdf

xlsx

1786534398.xlsx

pdf

ATC17_2471efd2-7594-4536-9f941786534202593_EDC1MATHURABUYER.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders