Bids Are invited for Two Ton Split Air Conditioner - Mk1a-30261 - Supply, Installation & Commissioning Of Two Ton Split Air Conditioner Along With 1 Year For Machine & 5 Years For Compressor Warranty As Per Technical Specification , Bee Star Rating ,
Tender Overview
Project Description
Bids Are invited for Two Ton Split Air Conditioner - Mk1a-30261 - Supply, Installation & Commissioning Of Two Ton Split Air Conditioner Along With 1 Year For Machine & 5 Years For Compressor Warranty As Per Technical Specification , Bee Star Rating , Type Of Air Conditioner , Technology Of Ac , Nominal Cooling Capacity In Ton / (Kcal/Hr) , Coil Material , Refrigerant , Installation & Commissioning Shall Be Done By The Supplier On Turnkey Basis , Packing List , Any Other Features , Warranty On Machine , Warranty On Compressor , Following Documents In Triplicate Are To Be Provided Along With The Ac Units.A) Operation And Setting (Electrical And Mechanical) Manual.B) Maintenance Manual Along With Applicable Drawings.C) Electrical Layout Diagrams Of The Ac Units Shall Be Provided By The Supplier For Maintenance Of The Ac Units , Training To Be Provided On Operation & Maintenance Of The Air Conditioner To The Lca Plant Maintenance Team.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Supply, Installation & Commissioning of Two Ton Split Air Conditioner along with 1 year for machine & 5 years for compressor warranty as per Technical Specification | Supply, Installation & Commissioning of Two Ton Split Air Conditioner along with 1 year for machine & 5 years for compressor warranty as per Technical Specification |
| 2 | BEE Star Rating | BEE Star Rating |
| 3 | Type of Air conditioner | Type of Air conditioner |
| 4 | Technology of AC | Technology of AC |
| 5 | Nominal cooling capacity in Ton / (kcal/hr) | Nominal cooling capacity in Ton / (kcal/hr) |
| 6 | Coil Material | Coil Material |
| 7 | Refrigerant | Refrigerant |
| 8 | Installation & Commissioning shall be done by the supplier on Turnkey basis | Installation & Commissioning shall be done by the supplier on Turnkey basis |
| 9 | Packing List | Packing List |
| 10 | Any other Features | Any other Features |
| 11 | Warranty on Machine | Warranty on Machine |
| 12 | Warranty on Compressor | Warranty on Compressor |
| 13 | Following Documents in Triplicate are to be provided along with the AC units.a) Operation and Setting (Electrical and Mechanical) Manual.b) Maintenance manual along with applicable drawings.c) Electrical Layout Diagrams of the AC units shall be provided by the supplier for maintenance of the AC units | Following Documents in Triplicate are to be provided along with the AC units.a) Operation and Setting (Electrical and Mechanical) Manual.b) Maintenance manual along with applicable drawings.c) Electrical Layout Diagrams of the AC units shall be provided by the supplier for maintenance of the AC units |
| 14 | Training to be provided on Operation & Maintenance of the Air Conditioner to the LCA Plant Maintenance team. | Training to be provided on Operation & Maintenance of the Air Conditioner to the LCA Plant Maintenance team. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender