Tender For For The Work Of Giving Various Types Of New Connections (Ev Charging, Jaljeevan Mission Etc.) To Consumers And 33/11 Kv Lt/Ht Line Shifting Related And Other Work Through Running Contract In Electricity Distribution Division, Pilibhit In F
Tender Overview
Project Description
Tender for For The Work Of Giving Various Types Of New Connections (Ev Charging, Jaljeevan Mission Etc.) To Consumers And 33/11 Kv Lt/Ht Line Shifting Related And Other Work Through Running Contract In Electricity Distribution Division, Pilibhit In Fully Deposit Scheme.
BOQ
| Sl. No. | Item Description |
| 1 | Carriage of following material from store center Pilibhit to site including loading, unloading under EDD Pilibhit. |
| 2 | PCC 8.5/9 mtr.Pole |
| 3 | PCC 11 mtr.Pole |
| 4 | ST Pole 11 mtr. |
| 5 | 25 KVA T/F |
| 6 | 63 KVA T/F |
| 7 | 100 KVA T/F |
| 8 | 250 KVA T/F |
| 9 | 400 KVA T/F |
| 10 | ACSR weasel/Raccon/Dog |
| 11 | AB Cable 3x120/3x95 |
| 12 | AB Cable 3x50 |
| 13 | AB Cable 1x16 |
| 14 | 11 KV XLPE Cable |
| 15 | 33 KV XLPE Cable |
| 16 | Other line material (as AB Cable, cross arm, T-off, Top Channel, GI, Stay wire earthing rod, LT Distribution box, 11 KV Pin, Disc. Insulator etc. |
| 17 | Erection of single pole HT/LT PCC 8.5 mtr./STP 11 Mtr. Including fitting of all accessories. (All type of clamps required and T&P nut bolt of various size provided by contractor. Complete in all respect. As per RESSPO schedule. |
| 18 | Erection of single pole HT/LT PCC 11 Mtr. Including fitting of all accessories. (All type of clamps required and T&P nut bolt of various size provided by contractor. Complete in all respect. As per RESSPO schedule. |
| 19 | Erection of D/P structure of 8.5 Mtr. PCC/STP 11 Mtr. fitting of all accessories,(All type of clamps required and T&P nut bolt of various size provided by contractor. Complete in all respect. Complete in all respect. As per RESSPO schedule. |
| 20 | Erection of D/P structure of PCC 11 Mtr. fitting of all accessories,(All type of clamps required and T&P nut bolt of various size provided by contractor. Complete in all respect. Complete in all respect. As per RESSPO schedule. |
| 21 | Grouting of PCC / STP pole with ration 1:4:8 CC ratio cement sand and stone grid as per RESSPO drawing all required material will be provided by contractor. |
| 22 | Grouting of PCC 11 Mtr. with ration 1:4:8 CC ratio cement sand and stone grid as per RESSPO drawing all required material will be provided by contractor. |
| 23 | Digging of pit and fixing of stay (all type clamps, T&P and nut bols of various size etc. provided by firm |
| 24 | Earthing of HT/L/T pole in the ground and properly connected to each support. As per RESSPO schedule (earthing rod provided by department and other required nut and bolts etc. provided by firm by at his on cost) |
| 25 | Laying and sagging of 3 Phase ACSR weasel/raccon/dog conductors for 11 & 33 KV line including jumpering, hosting, fixing of all type of insulator, binding, jointing and its clamping etc. in all respect. (conductor provided by department) |
| 26 | Laying of AB cable 3x95/3x120 |
| 27 | Laying of AB cable 3x50 |
| 28 | Laying of AB cable 1x16 |
| 29 | Mounting of following T/F on D/P and making all LT/HT connection. |
| 30 | 25 KVA T/F |
| 31 | 63 KVA T/F |
| 32 | 100 KVA T/F |
| 33 | 250 KVA T/F |
| 34 | 400 KVA T/F |
| 35 | Laying of 11 KV XLPE cable on STP/PCC pole complete in all respect (all required clamps with MS-angle of size 50*50*6 mm 14 inches long and required size nut, bolt and washer provided by firm on his cost etc.) |
| 36 | Laying of 11 KV XLPE Cable by drill method with GI pipe of size 4\\" dia. As per norms (Pipe will be provided by contractor) complete work in all respect. |
| 37 | Laying of 11 KV XLPE Cable by drill method with HDPE pipe of size 4\\" dia. As per norms (Pipe will be provided by contractor) complete work in all respect. |
| 38 | Laying of 11 KV single circuit XLPE cable by digging of trench including supply of required material as fine sand, first class bricks, stone slab. Including refilling of trench. (All the matrial required for laying will be supplied by the contractor as per departmental norms except 11 KV XLPE cable) |
| 39 | Laying of 11 KV double circuit XLPE cable by digging of trench including supply of required material as fine sand, first class bricks, stone slab. Including refilling of trench. The two cables should be seprated by a partition of single bricks. (All the matrial required for laying will be supplied by the contractor as per departmental norms except 11 KV XLPE cable) |
| 40 | Laying of 33 KV single circuit XLPE cable by digging of trench including supply of required material as fine sand, first class bricks, stone slab. Including refilling of trench. (All the matrial required for laying will be supplied by the contractor as per departmental norms except 33 KV XLPE cable) |
| 41 | Laying of 33 KV double circuit XLPE cable by digging of trench including supply of required material as fine sand, first class bricks, stone slab. Including refilling of trench. The two cables should be seprated by a partition of single bricks. (All the matrial required for laying will be supplied by the contractor as per departmental norms except 33 KV XLPE cable) |
| 42 | Carriage of new CT/PT from store center Pilibhit to site and mounting/installation on double pole, making all connections . (All T & P and required size Nut Bolt and washer etc. provided by firm) Complete work in all respect. |
| 43 | Carriage of new 11/33 KV Cubical metering from store center Pilibhit to site with installation and making all connections (All T & P and required size Nut Bolt and washer etc. provided by firm) Complete work in all respect. |
| 44 | Termination of Jointing kits (11/33 kv) jointing kit provided by department (All T & P and Nutt Bolt of various size etc. provided by firm) |
| 45 | Carriage from store center pilibhit to site and Hoisting of 33 & 11 KV XLPE cable on pole by providing GI Pipe including cost of GI Pipe and required clamps. (Only 33 & 11 KV XLPE cable provided by department) complete work in all respect. |
| 46 | Construction of T/Fs plinth of size 5 fit x5 fit x5 fit with the help of first class bricks, cement & coarse sand as per norms. Filling the structure completely by brick blast & plastering work of walls Including CC work on top in ratio 1:2:4 by cement, stone grit & sand and grouting of 2 nos. M.S. channel of size 50x50x5 mm on the top of T/Fs plinth whole work should be done as per RESSPO norms complete in all respect. (All Material will be provided by Contractor own his cost) For 250 KVA T/F & 400 KVA T/F. |
| 47 | Earthing of 250/400 KVA T/F (Body and neutral) by boaring type upto 40 feet depth water level by providing GI Pipe and making connection from boaring site to T/F. |
| 48 | Fixing of LT distribution box single Phase with providing IP connector and required nut, bolt and washer. |
| 49 | Fixing of LT distribution box three Phase with providing four nos.IP connector and required nut, bolt and washer. |
| 50 | Providing and fixing allumunium lug 400 sq. mm |
| 51 | Providing and fixing danger board with nut & bolt |
| 52 | Providing and fixing PG clmap |
| 53 | Receive back material from site to store centre- Pilibhit Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender