Tender For Comprehensive Consultancy Services For Soil Investigation, Prepration Of Architectural,Structural Drgs, Mep Services, Estimate And Rate Analysis Etc Including Obtaining Approval Of Drawings From Griha Agency And Registering The Project Wit
Tender Overview
Project Description
Tender for Comprehensive Consultancy Services For Soil Investigation, Prepration Of Architectural,Structural Drgs, Mep Services, Estimate And Rate Analysis Etc Including Obtaining Approval Of Drawings From Griha Agency And Registering The Project With Griha Agency 3 Star Rating Green Bldg Norms For Provn Of Otm Accn For Cesr At Oaf Under Age(I) (P) Srinagar (Reload)
BOQ
| Sl. No. | Item Description |
| 1 | Provision of complete consultancy services ( as listed below in Item No 1.00 to 1.90) as per relevent IS code practice and standard Engineering Norms and practices complete all as specified and as directed.A- Soil Investigation- Soil Investigation by doing bore holes having dia 100 to 150 mm upto 10 mtr below MGL for 34 Nos bore.(aa) Preparation/Drilling of bore holes having dia 100 to 150 mm upto 10 mtr below MGL upto the hard strata. Rock or refusal whichever occurs earlier for building including boring, sampling, Para (a) to (e). Each bore hole depth should be minimum 10 mtr. Sampling shall be done as per relevant latest IS Codes (1982-2021) complete and as directed by Engr-in-Charge.(a) Above test shall include carrying out of SPT and collecting disturbed & undisturbed saniples as per IS code and up to 1 mtr interval or at every change of strata.(b) Carrying out laboratory tests with the disturbed / undisturbed sampling and find out grain size analysis, classification, consistency, density, Atterberg limits, FMC/OMC, analysis conducted as per relevant IS code. (c) Evaluate allowable bearing capacity / SBC of soil by analytical methods.(d) Submission of 3 copies report of soil investigation report and other details including making of bore hole logs. (e) In soil test report recommendation of SBC should give for all bore holes for minimum three depths for each bore hole.(f) Recommendation of footing type minimum foundation size as under: 1.5x 1.5m, 1.5 x 2.5m, 2.0 x 2.5m, 2.0 x 3.0 m(g) All testing shall be carried out as per relevant and latest IS code provision. (h) Photographic record of geo-exploration and testing shall also be a part of report.(i) Location plan of bore holes and section showing stratification in summary form (highest & lowest) and seasonal variation of water table should be mentioned in the report.(j) Recommendation with respect to liquefaction potential of soil in case of saturated or partially saturated soil.(k) Recommendation with respect to swelling potential of soil (i.e. Liquid limit, Plastic limit, Plasticity index & swelling pressure in respect of BC soil & its depth/layers). (l) Calculation ofSBC value at proposed depth need to be part of soil investigation.(m) Estimation of pile capacity for one open capacity of different size of pile with calculations need to be part of soil investigation report.(n) Transport charges for equipment and machinery at site. (o) The location of bore holes shall be as directed by Engg-in-carge.B. All as per item No A above but depth upto 15 mtr and 18 Nos bores.C. All as per item No A above but depth upto 20 mtr and 19 Nos bores.D. Plate Load Test for 14 Nos bores and also determine the 'K 'value on all those locations. |
| 2 | (a) Preparation, submission and finalization of Complete conceptual plans, Architectural Drawings (Site plans, Plans of all Buildings, all side elevations, Cut Sections, Various sections through Stairs, Critical sections, detailings showing internal fixtures, cupboards, kitchen details, toilet details, elevation feature details, Schedule of Finishes, Arch TD Drawings (in appropriate scales) in REVIT/AutoCad for Following Buildings, While preparing drawings the consultant shall adhere to scales of Accomodation , Scales of Furniture for built in furniture, Zonal specifications, IS Codes, NBC Codes, GRIHA rating system (for 3 Star rating) , Local Bye laws, BPs and AE-II of the subject work. All these documents can be obtained from the office of HQ CE 31 Zone on any working Day. In case of any discrepancy beteween these documents the decision of accepting officer will be obtained before finalizing the drawings. The above mentioned drawing shall be prepared in consultation/supervision of Architects of HQ CE 31 Zone (E-6 Section ) ,( E-2(Plg) Officers for Sch of Finishes ) and will have to approved by Accepting Officer before Finalization.Special works: (i) Single living accn for 19 Havs and 65 OR's (S+4) Total plinth Area -2276.04 Sqm and open stilt parking area 569.00 Sqm. (ii) Single living accn for 15 JCO's (G+2) including Stair case and baggage room Total plinth Area -644.16 Sqm (iii) Single living accn for 09 Major and for 02 Capt (G+2) including servant qtrs, box room, attached toilet area and goods lift size etc Total plinth Area -860.14+148.64+51.56 = 1060.34 Sqm Auth works:(i) Single living accn for 23 Havs and 189 OR's (S+4) including store room, beggage room, sanitary block Total plinth Area -5468.00 Sqm and open stilt parking area 1530.00 Sqm(ii) Cook house and Dinning hall (S+4) for 42 Havs and 290 OR's (Total 332 Ors) Kitchen, meat room, dry store, fresh store etc Total plinth Area -728.08+324.18=1052.26 Sqm (iii) Single living accn for 06 JCO's (G+2) including baggage room Total plinth Area -278.10 Sqm(iv) JCO's Mess for 25 JCO's including mess room, club room, toilet etc Total plinth Area -359.8 Sqm(v) Single living accn for 01 Capt (S/S) including servant qtrs, baggage room etc Total plinth Area - 65.91+18.58= 84.49 Sqm (vi) Officer's Mess for 23 str of Officers including mess room, bar room, libarary, kitchen, mess office, silver room, guest room, wine store, plate room etc Total plinth Area - 881.90 Sqm (vii) Office and Administration Accn (S+2) including Offrr's Mess for 23 str of Officers including , libarary, guest room, Driver room, Sanitary annex Total plinth Area - 1916.00 Sqm (vii) MT Office and LRW office including sanitary annex Total plinth Area - 80.67+38.50= 119.17 Sqm (ix) Guard house and ancillaries, URC (G+1), OR's institute, and Educational building (G+2) Total plinth Area - 162.00+267.46+158.03+690.40=1277.89sqm (x) Religious Institute,Gd rest room for 02 NCOs and 06 ORs and lift (08 x passengers) Total plinth Area - 75.00+493.00+144.19= 712.19 Sqm Please Enable Macros to View BoQ information |
| 3 | (a) Preparation, submission and finalization of Complete conceptual plans, Architectural Drawings (Site plans, Plans of all Buildings, all side elevations, Cut Sections, Various sections through Stairs, Critical sections, detailings showing internal fixtures, cupboards, kitchen details, toilet details, elevation feature details, Schedule of Finishes, Arch TD Drawings (in appropriate scales) in REVIT/AutoCad for Following Buildings, While preparing drawings the consultant shall adhere to scales of Accomodation , Scales of Furniture for built in furniture, Zonal specifications, IS Codes, NBC Codes, GRIHA rating system (for 3 Star rating) , Local Bye laws, BPs and AE-II of the subject work. All these documents can be obtained from the office of HQ CE 31 Zone on any working Day. In case of any discrepancy beteween these documents the decision of accepting officer will be obtained before finalizing the drawings. The above mentioned drawing shall be prepared in consultation/supervision of Architects of HQ CE 31 Zone (E-6 Section ) ,( E-2(Plg) Officers for Sch of Finishes ) and will have to approved by Accepting Officer before Finalization.Special works: (i) Single living accn for 19 Havs and 65 OR's (S+4) Total plinth Area -2276.04 Sqm and open stilt parking area 569.00 Sqm. (ii) Single living accn for 15 JCO's (G+2) including Stair case and baggage room Total plinth Area -644.16 Sqm (iii) Single living accn for 09 Major and for 02 Capt (G+2) including servant qtrs, box room, attached toilet area and goods lift size etc Total plinth Area -860.14+148.64+51.56 = 1060.34 Sqm Auth works:(i) Single living accn for 23 Havs and 189 OR's (S+4) including store room, beggage room, sanitary block Total plinth Area -5468.00 Sqm and open stilt parking area 1530.00 Sqm(ii) Cook house and Dinning hall (S+4) for 42 Havs and 290 OR's (Total 332 Ors) Kitchen, meat room, dry store, fresh store etc Total plinth Area -728.08+324.18=1052.26 Sqm (iii) Single living accn for 06 JCO's (G+2) including baggage room Total plinth Area -278.10 Sqm(iv) JCO's Mess for 25 JCO's including mess room, club room, toilet etc Total plinth Area -359.8 Sqm(v) Single living accn for 01 Capt (S/S) including servant qtrs, baggage room etc Total plinth Area - 65.91+18.58= 84.49 Sqm (vi) Officer's Mess for 23 str of Officers including mess room, bar room, libarary, kitchen, mess office, silver room, guest room, wine store, plate room etc Total plinth Area - 881.90 Sqm (vii) Office and Administration Accn (S+2) including Offrr's Mess for 23 str of Officers including , libarary, guest room, Driver room, Sanitary annex Total plinth Area - 1916.00 Sqm (vii) MT Office and LRW office including sanitary annex Total plinth Area - 80.67+38.50= 119.17 Sqm (ix) Guard house and ancillaries, URC (G+1), OR's institute, and Educational building (G+2) Total plinth Area - 162.00+267.46+158.03+690.40=1277.89sqm (x) Religious Institute,Gd rest room for 02 NCOs and 06 ORs and lift (08 x passengers) Total plinth Area - 75.00+493.00+144.19= 712.19 Sqm Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 19 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 21 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender