Power Boards / Undertakings / PSU Closing in 6 days TDR #56963257

Tender For Standardization Of Transformer Station At Womens College Under Electrical Section, Puthenchantha [Cw-4504-202526-13] Of Electrical Division Thiruvananthapuram Under Electrical Circle, Thiruvananthapuram.

Issued by Boards / Undertakings / PSU · Thiruvananthapuram, Kerala
Tender Value
6.22 Lakhs
Estimated cost
Bid Submission
24 Aug 2026
6 days left
EMD
15600
Bank guarantee accepted
Document Fee
1534
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Thiruvananthapuram → Kerala
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Standardization Of Transformer Station At Womens College Under Electrical Section, Puthenchantha [Cw-4504-202526-13] Of Electrical Division Thiruvananthapuram Under Electrical Circle, Thiruvananthapuram.

BOQ

Name of Work:- Standardization of Transformer station at Womens college under Electrical Section, Puthenchantha [CW-4504-202526-13] of Electrical Division Thiruvananthapuram Under Electrical Circle, Thiruvananthapuram.
Sl. No. Item Description
1Cleaning and levelling of transformer yard/RMU, spreading 40 mm broken stone in yard for a thickness of 10 cm above bed of 10 cm thick 6 mm broken stone, after constructing a curb wall of height 20cm above ground and 10cm below level including cost of all materials and charges for conveying, spreading, consolidating etc.
2Painting with synthetic enamel paint of approved brand and manufacturer of required color to give an even shade of as per direction of KSEBL officers at site- fencing
3Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade One or more coats on old work ( DSR 2018 rate )
4Plastering with cement mortar 1:4, 12 mm thick one coat, floated hard and trowelled smooth for outside walls up to 10m height including cost of all materials and labour etc. Complete as per the standard specification and direction of Board staff.
5RR with departmental stone - random rubble masonry using departmental rubble in foundation and plinth including through and bond stone and leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate with cement concrete 1: 6: 12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) up to plinth level with cement mortar 1:6 (1 cement : 6 coarse sand)
6Reinforced cement concrete 1:2:4 (1 cement : 2 coarse sand :4 graded stone aggregate 20mm nominal size), having (M20) GRADE, in column base, columns etc upto plinth level excluding cost of centering, shuttering , finishing and reinforcement including cost of all materials watering, curing etc. as per the standard specifications and direction of Board staff. ( DSR 2018 rate )
716.20 : Welded steel wire fabric fencing with posts of specified material and of standard design placed and embedded in cement concrete block 45x45x60 cm of mix1:5:10(1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size), every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and struts embedded in cement concrete blocks 70x45x50 cm of the same mix, provided with welded steel wire fabric fixed between the posts fitted and fixed with G.I stapes on wooden plugs or tied to 6 mm barnibs with G.I binding wire (cost of posts, welded steel wire fabric, painting, earth work in excavation and concrete to be paid for separately):(cost index(c) : 1 included in Rate)
8Steel reinforcement for RCC work using TMT bars including straightening, cutting, bending, placing in position and binding all complete including conveyance charges, cost of materials, labour and sundry expenses etc complete as directed by the Engineer in charge ( DSR 2018 rate )
9Dismantling one Transformer (above 160kVA) from existing plinth to ground, including disconnecting HT/LT/Earth connections.
10Erecting one 250kVA Transformer to existing Plinth/Platform and giving connections, including loading from TMR/SRS/other stacking place & unloading at site but excluding cost for transporting transformer.
11Scrapping and cleaning of old paint,rust,oil etc. over the old 250 kVA transformer installed at site (plinth) and applying one or more coat of synthetic enamel paint (over a coat of iron primer, wherever required) of approved quality and colour as per standard specification including cost of materials, conveyance etc, complete.
12Doing one cable end termination on HT XLPE UG cables of sizes beyond 3x185 sqmm and upto and including 3x300 sq mm using the cable jointing kit supplied departmentally after making fencing,caution board and all other safety measures including charges for cable jointer etc. complete as per the direction of the departmental officers.
13Doing straight joint on HT XLPE UG cables of sizes beyond 3x185 sqmm and upto and including 3x300 sq mm using the cable jointing kit supplied departmentally as per specification after providing proper traffic signalling and caution board fencing etc. wherever necessary, including charges for cable jointer and other sundries etc. as per the direction of departmental officers at site.
14Mounting and connecting HT XLPE UG cable ends of all sizes upto and including 3x300 sq mm with special type cable clamps, bolts, nuts, terminal protectors etc.including cost of extra materials if needed and giving necessary jumper connections.
15Excavation of cable trench of appropriate size ( normally 1.2m deep and 0.35m /0.5m wide for single/double run) in all classes of soil including breaking clods, watering, ramming and sectioning of soil bank etc. and back filling the soil after cable laying and consolidating the soil in layers of 75cm (excluding laying of cable).
16Laying HT XLPE UG cable of sizes beyond 3x185 sq mm and upto and including 3x300 sqmm including conveying cable from Sub Regional Store/stacking place to work site and laying it carefully using cable rollers, taking through stone ware/G.I.pipes at road crossing/culverts/bridges etc. whereever necessary, providing identification tags at 5m intervals, filling the space around the cable with riddled soil and covering the top with bricks, providing cable route markers at 100m intervals, inclusive of cost of all materials (other than cost of GI/HDPE pipe & UG Cable), labour and transport including crane charges excluding excavation and backfilling.
17Dismantling HT XLPE UG cable including excavation & back filling pit and transporting UG cable work site to Section store. ( of sizes beyond 3x185 sqmm and up to and incl. 3x300 sqmm ) 481.95/2
18Supplying and laying of 160 mm size ( Outer dia 160 mm& Inner dia 135 mm) DWC HDPE pipe ISI marked along with all accessories like socket, bend, couplers etc. conforming to IS 14930, Part II complete with fitting and cutting,jointing etc. in the existing trench, complete as required.
19Dismantling the cable ends of all sizes upto and incl. 3x300 sq mm from RMU / Structure with special type cable clamps, bolts,nuts, terminal protectors etc (half the rate of mounting -item No.934/2)
20Additional rate for excavating trench on tarred/concrete surface of specified size.
21Excavation of cable trench for maintenance of cable in all classes of soil including breaking clods, watering, ramming and sectioning of soil bank etc. and back filling the soil after cable laying and consolidating the soil in layers of 75cm (excluding laying of cable).
22Pillar foundation for Transformers of and above 250 kVA (Double pillar)
23Erection of LT 4 way distribution box (normal size 190x40x90cm) on existing cross arm, giving connection including cable and earth connection (excluding earthing).
24Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at standard distance (1.5m) away from the pole/structure in ordinary soil & backfilling the pit with 15cm alternate layer of charcoal, salt and sand up to 90cm from the bottom. including the cost of 20kg salt, 25kg charcoal, excluding supply of earth pipe. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56963257
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 6.22 Lakhs
LAST DATE 24-08-2026
Authority
Authority Name Kerala State Electricity Board
Work Description Tender for Standardization Of Transformer Station At Womens College Under Electrical Section, Puthenchantha [Cw-4504-202526-13] Of Electrical Division Thiruvananthapuram Under Electrical Circle, Thiruvananthapuram.
Basic Detail
Tender No KSEBL/PMU-TVM/07/2026-27/dt 11.08.2026
Bidding Type Tender
Location
City Thiruvananthapuram
State Kerala
Key Dates
Publish Date 11 Aug 2026
Submission Date 24 Aug 2026
Open Date 29 Aug 2026
Finance
Tender Value 6.22 Lakhs
Tender Fee 1534
EMD 15600
Exemption Not Available
Document List
BIDFORMANDBIDAGREEMENT.pdf
BOQ_1464130.xls
e453d8b0-760b-423c-afe8-ca489aa0f6b2.html
PART1.pdf
PARTII.pdf
schematicdiagram.pdf
Tendernotice_1 (11).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 11, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 24, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 6 days
Aug 29, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 11 days

Tender Documents

Download All (ZIP) ↓
pdf

BIDFORMANDBIDAGREEMENT.pdf

xls

BOQ_1464130.xls

html

e453d8b0-760b-423c-afe8-ca489aa0f6b2.html

pdf

PART1.pdf

pdf

PARTII.pdf

pdf

schematicdiagram.pdf

pdf

Tendernotice_1 (11).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders