Power Government Departments Closing in 9 days TDR #56959027

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Transmission Substation; Substation, Switchyard, Power House Equipment, Electrical System Or Installation; Service Provider - Work Of Stringing And

Issued by Government Departments · Sultanpur, Uttar Pradesh
Tender Value
54.68 Lakhs
Estimated cost
Bid Submission
22 Aug 2026
9 days left
EMD
55000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Sultanpur → Uttar Pradesh
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Transmission Substation; Substation, Switchyard, Power House Equipment, Electrical System Or Installation; Service Provider - Work Of Stringing And Erection Of 132Kv Main Bus Bar And Transfer Bus At 132Kv S/S Mankapur , Stringing Of 132Kv Main Bus Bar 3 Phase With Moose Conductor Includingfitting Of Tension Clam, Hoisting Of Disc Insulator, Cutting Of Conductor And Also Shifting Of All Materials From Store Site.( 36 Mtr Approx) , Stringing Of 132Kv Transfer Bus Bar 3 Phase With Moose Conductor Including Fitting Of Tension Clam, Hoisting Of Disc Insulator, Cutting Of Conductor And Also Shifting Of All Materials From Store Site.( 36 Mtr Approx) , Stringing Of 132Kv Jack Bus 3 Phase With Panther Conductor Including Fitting Of Tension Clam, Hoisting Of Disc Insulator, Cutting Of Conductor Andalso Shifting Of All Materials From Store Site. , Stringing Of 132Kv Maskanwa Tss Bay From Dead End Tower To Main Bus Of Acsr Panther Conductor Including Fitting Of Tension Clam, Hoisting Of Disc Insulator, Cutting Of Conductor And Also Shifting Of All Materials From Storesite. , Carriage Of Structure & Other Materials , Carriage Of Sub-Station Structure Through Private Truck From Efu Naini (Allahabad) To Above Sub-Stations Alongwith Sorting. Sluftung And Loading At Naini And Unloading And Stacking At 132Kv Kv S/S Mankapur , Forconstruction 02 Nos 132Kv Maskanwa Tss Bay , Sorting Our And Stacking Of Main & Auxilary Structure As Per Bom At Efunaini (Allahabad) , Loading Of Structure On Pvt Truck / Trailer At Efu Naini. (+Nut/Bolts) , Transportation Of Structure From Efu Naını, Allahabad To Different Sub-Stations , Unloading And Proper Stacking Of Structure Parts Al Different Sub-Stations , Carriage Of Various Materials From Near By Substation If Required For Thecompletion Of Work. , Erection Of Structures, Equipments, C&R Panels For 02 Nos 132Kvmaskanwa Tss Bays , Erection Of Main And Auxiliary Structure Consisting Of Columns, Beams,Peaks, Masts Etc. And Auxiliary Structures Required For Installation Of Bays Akr/Bkr/Dkr/Abr/Alp/Bbl/Bct/Btis Etc. Including Shifting Of All Material Ie, Structure Parts Nuts, Bolts Washer Etc From Store To Site Of Erection, Erection Of Structure As Per Drawings And Practices Using Flat And Spring Washer With Each Bolt. Matching Of Holes, Cutting, Matching Of Member If Required Shall Also Be Done By The Contractor Without Any Extra Cost To Complete The Work Satisfactorily. All Material To Be Erected Shall Be Supplied By The Upptcl, Free Of Cost But All Men, Material And T&P Required For Satisfactonly Completion Of Work Shall Be Arranged By The Contractor At His Own Cost. , Complete Erection Of Following Equipment As Per Technical Specification (Including Shifting Of Material From Store To Site) & All Other Associated Works To Complete The Job Satisfactorily. , Erection Of Samast Energy Meter & Data Communication Work , Installation Of New 3P4w 0.2S Class Interface Energy Meters , Necessary Interconnection From Data Transmission Of Already Installed Samast Compliant Meters To Lan Switch Up To Dcu/Gateway And All Otherh/W.S/W Per No. , Installation & Commissioning Of Common Metering Cubicles For Meters. Dcu,Switch For 2 Iem , Laying Of Earthmat At 132/33Kv Extended Switchyard Area Alongwith Connecting Newly Laid Earthmat With Existing Earthmat, Equipments Earthing, Cable Laying And Other Miscellaneous Work. , Laying Of 40Mm Ms Rod For Main Earth Mat Below 750 Mm Of Plinth Level Including Excavation Of Trenches, Its Back Filing, Cutting Of Bar, Cross Welding Of Joints Etc. , Piercing Of 40Mm Dia Ms Electrodes Of 3 Meter Length Below 700 Mm Ofplinth Level, Excavation Of Trenches, Its Back Filing. , Making Of Shielding Mesh For 3Nos. 132Kv La By Fabrication Of 06Nos 3 Meter Long Electrode With 40 Mm Dia. M.S. Rod Having 150 Mm Long Conical Shape And Then Its Piercing Vertically In The Ground With Top 500 Mm Below Ground Level, Its Welding With 75X10 Mm Size M.S. Flat For Making Of Shielding Mesh For Las And Finally, Connecting The Shielding With Main Earth Mat At 2 Places And Finally Painting With Black Anti-Corrosive Paint, With Due Digging Of Earth/Trench, Its Back Filling. Two No Risers Of 75X10mm Ms Flat Will Be Welded With Existing Main Earth Mat To Auxiliary Structure, One Separate Riser Will Be Taken From The Laid Earth Mat To Corresponding La Through Surge Counter For Making Of Proper Mesh. , Laying Of Following Sizes Control Cables To Be Provided By Department As Per Requirements In Cable Trenches From C&R Panels To Various 132Kv Equipments, Junctions Boxes, Etc. In Switchyard, Also For Lighting Work From Lt Acdb To Lighting Junction Boxes As Per Cable Schedule Including Shifting Of Cables In Drums From Storage Place At The Sub Station To Erection Site & Shifting Back The Balance Cables To Stores At The Sub Station: , 2 C X 2.5 Sq. Mm , 4 C X 2.5 Sq. Mm , 6 C X 2.5 Sq. Mm , 10 C X 2.5 Sq. Mm , Inter Connection & Termination Of Above Laid Control Cables Between C&Rpanels In Panel To Various Equipments, Equipments To Equipments Including Dc Supply From Dcdb And Ac Supply From Acdb To Panels And Various Equipments, Junctions Boxes Etc. In Switchyard As Per Cable Schedule Including Making Necessary Holes In Gland Plates Or Boxes Wherever Required Alongwith Supply & Fixing Of Cable Glands Of Appropriate Sizes & Providing Of Ferrules For Each Core Of The Cables & Its Termination With Crimping Type Copper Lugs Alongwith Preparation Of Inter-Connection Drawing And Commissioning Of The Panel / Feeders In Co-Ordination With T&C Wing Including Providing Of 2 Sets Of Hard Copies Of As Executed Inter-Connection Drawing. , Providing & Fixing Of 3 Phase L.T. A.C. Supply Cubicals Of Size1200×600×500 Mm With Hinged Door And Proper Locking Arrangement Duly Made Of 16 Swg M.S. Sheet And Painted With Grey Colour Synthetic Enamel Paint. The L.T. A.C. Supply Cubical Should Be Fitted With 3 Nos. 100 . Copper Bus Bar (3 Phase + Neutral), 5 No. 32 . Tpn Mcb, 12 No. 40 . Dp Mcb, 40 3 No. Link Type Terminal Bock, Cable Glands Etc. With Internal Wiring And Then Installation Of Each L.T. A.C. Cubical On 1 Meter Long M.S. Angle Frame Structure After Due Fabrication With The Help Of Scrapm.S. Angles To Be Provided By The Department Free Of Cost And Grouting Of Legs Of The M.S. Angle Frame Structure In The Ground With C.C. Mixture And Painting Of The M.S. Angle Frame Structure With Synthetic Enamel Paint. (1Job Per L.T. A.C. Cubical) , Earthing Of L.T. A.C. Supply Cubical With Providing & Fixing Of 600 X 800 X 8Mm Size G.I. Plate With Its Top At Least 3 Meter Below The Ground Level With 20 Mm Dia. G.I. Pipe & Funnel For Watering, 1 No. 8 Swg G.I. Wire Earthing Lead Etc. With Alternate Layer Of Charcoal/Coke And Salt At Least 150 Mm Thick Around It. , Providing & Fixing Of Updated Single Line Diagram In Pvc Sheet Of Size 6X6 Feet Of Complete 132/33 Kv Switchyard Of 132 Kv S/S Mankapur , Switchyard Lighting , Laying Of Following Size Pvc Insulated Copper Control Cable From Lt Acdb Cubical To Various Junction Boxes Below Ground Level In Pvc Conduit Pipe (Provided By The Contractor) After Due Excavation Back Filling Etc. Including All Labour, Pvc Pipe Etc Required For Proper Completion Of The Work (A) 2C X2.5 Sq Mm , Laying Of Control Cables Between Lt Lighting Junction Box & Led Street Light Fittings Along Gi Structure Including Necessary Cl Ing With Suitablems Strip Cl With Proper Dressing , Retro Reflective Sign Board For Bay/ Equipment Of Size 2 Ft X 1.5 Ft Duly Made Of 2 Mm Thick Aluminum Sheet With Face To Be Fully Covered With 3 M Dg Cube Type Retro Reflective Sheet Of Yellow Colour And Letters Shall Be Computer Cut And Blue Color 3 M Dg Cube Type Retro Reflective Sheet. The Sign Board Shall Be Fixed Near The Road/Bay/Equipement With The Help Of Frame Of Size 35Mm X 35Mm With Provision Of 2 Nos. Leg For Grouting Duly Painted In Black Color Enameld Paind And Back Side Of The Aluminium Sheet Shall Be Painted In Smoke Grey Enameled Paint Complete In All Respect To Begrouted With Casing Of Cc Foundation.

BOQ

Sl. No. Item TitleItem Description
1Work of Stringing and erection of 132KV main Bus Bar and Transfer Bus at 132KV S/S MankapurWork of Stringing and erection of 132KV main Bus Bar and Transfer Bus at 132KV S/S Mankapur
2Stringing of 132KV Main Bus bar 3 Phase with moose conductor includingfitting of tension clam, hoisting of Disc Insulator, cutting of conductor and also shifting of all materials from store site.( 36 Mtr approx)Stringing of 132KV Main Bus bar 3 Phase with moose conductor includingfitting of tension clam, hoisting of Disc Insulator, cutting of conductor and also shifting of all materials from store site.( 36 Mtr approx)
3Stringing of 132KV Transfer Bus bar 3 Phase with moose conductor including fitting of tension clam, hoisting of Disc Insulator, cutting of conductor and also shifting of all materials from store site.( 36 Mtr approx)Stringing of 132KV Transfer Bus bar 3 Phase with moose conductor including fitting of tension clam, hoisting of Disc Insulator, cutting of conductor and also shifting of all materials from store site.( 36 Mtr approx)
4Stringing of 132KV Jack Bus 3 Phase with Panther conductor including fitting of tension clam, hoisting of Disc Insulator, cutting of conductor andalso shifting of all materials from store site.Stringing of 132KV Jack Bus 3 Phase with Panther conductor including fitting of tension clam, hoisting of Disc Insulator, cutting of conductor andalso shifting of all materials from store site.
5Stringing of 132KV Maskanwa TSS Bay from Dead end tower to main bus of ACSR Panther conductor including fitting of tension clam, hoisting of Disc Insulator, cutting of conductor and also shifting of all materials from storesite.Stringing of 132KV Maskanwa TSS Bay from Dead end tower to main bus of ACSR Panther conductor including fitting of tension clam, hoisting of Disc Insulator, cutting of conductor and also shifting of all materials from storesite.
6Carriage of Structure & other MaterialsCarriage of Structure & other Materials
7Carriage of sub-station structure through private truck from EFU Naini (Allahabad) to above sub-stations alongwith sorting. sluftung and loading at Naini and unloading and stacking at 132KV KV S/S Mankapur , forconstruction 02 Nos 132KV Maskanwa TSS bayCarriage of sub-station structure through private truck from EFU Naini (Allahabad) to above sub-stations alongwith sorting. sluftung and loading at Naini and unloading and stacking at 132KV KV S/S Mankapur , forconstruction 02 Nos 132KV Maskanwa TSS bay
8Sorting our and stacking of main & auxilary structure as per BOM at EFUNaini (Allahabad)Sorting our and stacking of main & auxilary structure as per BOM at EFUNaini (Allahabad)
9Loading of structure on Pvt Truck / trailer at EFU Naini. (+Nut/Bolts)Loading of structure on Pvt Truck / trailer at EFU Naini. (+Nut/Bolts)
10Transportation of structure from EFU Naını, Allahabad to different sub-stationsTransportation of structure from EFU Naını, Allahabad to different sub-stations
11Unloading and proper stacking of structure parts al different Sub-stationsUnloading and proper stacking of structure parts al different Sub-stations
12Carriage of Various Materials from near by substation if required for thecompletion of Work.Carriage of Various Materials from near by substation if required for thecompletion of Work.
13Erection of Structures, Equipments, C&R Panels for 02 Nos 132KVMaskanwa TSS BaysErection of Structures, Equipments, C&R Panels for 02 Nos 132KVMaskanwa TSS Bays
14Erection of main and auxiliary structure consisting of columns, beams,peaks, masts etc. and auxiliary structures required for installation of Bays AKR/BKR/DKR/ABR/ALP/BBL/BCT/BTI's etc. including shifting of all material ie, structure parts nuts, bolts washer etc from store to site of erection, erection of structure as per drawings and practices using flat and spring washer with each bolt. Matching of holes, cutting, matching of member if required shall also be done by the contractor without any extra cost to complete the work satisfactorily. All material to be erected shall be supplied by the UPPTCL, free of cost but all men, material and T&P required for satisfactonly completion of work shall be arranged by the contractor at his own cost.Erection of main and auxiliary structure consisting of columns, beams,peaks, masts etc. and auxiliary structures required for installation of Bays AKR/BKR/DKR/ABR/ALP/BBL/BCT/BTI's etc. including shifting of all material ie, structure parts nuts, bolts washer etc from store to site of erection, erection of structure as per drawings and practices using flat and spring washer with each bolt. Matching of holes, cutting, matching of member if required shall also be done by the contractor without any extra cost to complete the work satisfactorily. All material to be erected shall be supplied by the UPPTCL, free of cost but all men, material and T&P required for satisfactonly completion of work shall be arranged by the contractor at his own cost.
15Complete erection of following equipment as per technical specification (Including shifting of material from store to site) & all other associated works to complete the job satisfactorily.Complete erection of following equipment as per technical specification (Including shifting of material from store to site) & all other associated works to complete the job satisfactorily.
16Erection of SAMAST Energy Meter & Data Communication workErection of SAMAST Energy Meter & Data Communication work
17Installation of new 3P4W 0.2S Class Interface Energy MetersInstallation of new 3P4W 0.2S Class Interface Energy Meters
18Necessary interconnection from data transmission of already installed SAMAST compliant meters to Lan Switch up to DCU/Gateway and all otherH/W.S/W per No.Necessary interconnection from data transmission of already installed SAMAST compliant meters to Lan Switch up to DCU/Gateway and all otherH/W.S/W per No.
19Installation & commissioning of Common Metering cubicles for Meters. DCU,switch for 2 IEMInstallation & commissioning of Common Metering cubicles for Meters. DCU,switch for 2 IEM
20Laying of Earthmat at 132/33KV extended switchyard area alongwith connecting newly laid earthmat with existing earthmat, equipments earthing, cable laying and other miscellaneous work.Laying of Earthmat at 132/33KV extended switchyard area alongwith connecting newly laid earthmat with existing earthmat, equipments earthing, cable laying and other miscellaneous work.
21Laying of 40mm MS rod for Main Earth mat below 750 mm of plinth level Including excavation of trenches, its back filing, cutting of bar, cross welding of joints etc.Laying of 40mm MS rod for Main Earth mat below 750 mm of plinth level Including excavation of trenches, its back filing, cutting of bar, cross welding of joints etc.
22Piercing of 40mm Dia MS electrodes of 3 meter length below 700 mm ofplinth level, excavation of trenches, its back filing.Piercing of 40mm Dia MS electrodes of 3 meter length below 700 mm ofplinth level, excavation of trenches, its back filing.
23Making of Shielding Mesh for 3nos. 132KV LA by Fabrication of 06nos 3 Meter Long Electrode with 40 mm dia. M.S. Rod having 150 mm Long Conical Shape and then its Piercing Vertically in the Ground with top 500 mm below Ground Level, its Welding with 75x10 mm size M.S. Flat for Making of Shielding Mesh for LAs and Finally, Connecting the Shielding with Main Earth Mat at 2 Places and finally Painting with Black Anti-Corrosive Paint, with due Digging of Earth/Trench, its Back Filling. Two no risers of 75x10mm MS Flat will be welded with existing main earth mat to Auxiliary structure, one separate riser will be taken from the laid earth mat to corresponding LA through surge counter for making of proper mesh.Making of Shielding Mesh for 3nos. 132KV LA by Fabrication of 06nos 3 Meter Long Electrode with 40 mm dia. M.S. Rod having 150 mm Long Conical Shape and then its Piercing Vertically in the Ground with top 500 mm below Ground Level, its Welding with 75x10 mm size M.S. Flat for Making of Shielding Mesh for LAs and Finally, Connecting the Shielding with Main Earth Mat at 2 Places and finally Painting with Black Anti-Corrosive Paint, with due Digging of Earth/Trench, its Back Filling. Two no risers of 75x10mm MS Flat will be welded with existing main earth mat to Auxiliary structure, one separate riser will be taken from the laid earth mat to corresponding LA through surge counter for making of proper mesh.
24Laying of following sizes Control Cables to be Provided by Department as per Requirements in Cable Trenches from C&R Panels to various 132KV Equipments, Junctions Boxes, etc. in Switchyard, also for lighting work from LT ACDB to lighting junction boxes as per Cable Schedule including Shifting of Cables in Drums from Storage Place at the Sub Station to Erection Site & Shifting Back the Balance Cables to Stores at the Sub Station:Laying of following sizes Control Cables to be Provided by Department as per Requirements in Cable Trenches from C&R Panels to various 132KV Equipments, Junctions Boxes, etc. in Switchyard, also for lighting work from LT ACDB to lighting junction boxes as per Cable Schedule including Shifting of Cables in Drums from Storage Place at the Sub Station to Erection Site & Shifting Back the Balance Cables to Stores at the Sub Station:
252 C x 2.5 sq. mm2 C x 2.5 sq. mm
264 C x 2.5 sq. mm4 C x 2.5 sq. mm
276 C x 2.5 sq. mm6 C x 2.5 sq. mm
2810 C x 2.5 sq. mm10 C x 2.5 sq. mm
29Inter connection & Termination of above Laid Control Cables between C&RPanels in Panel to various Equipments, Equipments to Equipments including DC supply from DCDB and AC supply from ACDB to Panels and various equipments, Junctions Boxes etc. in Switchyard as per Cable Schedule including Making necessary Holes in Gland Plates or Boxes wherever Required alongwith Supply & Fixing of Cable Glands of Appropriate Sizes & Providing of Ferrules for each Core of the Cables & its Termination with Crimping type Copper Lugs alongwith Preparation of Inter-connection Drawing and Commissioning of the Panel / Feeders in Co-ordination with T&C Wing including Providing of 2 Sets of Hard copies of as Executed Inter-connection Drawing.Inter connection & Termination of above Laid Control Cables between C&RPanels in Panel to various Equipments, Equipments to Equipments including DC supply from DCDB and AC supply from ACDB to Panels and various equipments, Junctions Boxes etc. in Switchyard as per Cable Schedule including Making necessary Holes in Gland Plates or Boxes wherever Required alongwith Supply & Fixing of Cable Glands of Appropriate Sizes & Providing of Ferrules for each Core of the Cables & its Termination with Crimping type Copper Lugs alongwith Preparation of Inter-connection Drawing and Commissioning of the Panel / Feeders in Co-ordination with T&C Wing including Providing of 2 Sets of Hard copies of as Executed Inter-connection Drawing.
30Providing & Fixing of 3 Phase L.T. A.C. Supply Cubicals of size1200×600×500 mm with Hinged Door and Proper Locking Arrangement duly made of 16 SWG M.S. Sheet and Painted with Grey Colour Synthetic Enamel Paint. The L.T. A.C. Supply Cubical should be Fitted with 3 Nos. 100 Amp. Copper Bus Bar (3 Phase + Neutral), 5 No. 32 Amp. TPN MCB, 12 No. 40 Amp. DP MCB, 40 3 No. Link type Terminal Bock, Cable Glands etc. with Internal Wiring and then Installation of each L.T. A.C. Cubical on 1 meter long M.S. Angle Frame Structure after due Fabrication with the help of ScrapM.S. Angles to be Provided by the Department Free of Cost and Grouting of Legs of the M.S. Angle Frame Structure in the Ground with C.C. Mixture and Painting of the M.S. Angle Frame Structure with Synthetic Enamel Paint. (1Job per L.T. A.C. Cubical)Providing & Fixing of 3 Phase L.T. A.C. Supply Cubicals of size1200×600×500 mm with Hinged Door and Proper Locking Arrangement duly made of 16 SWG M.S. Sheet and Painted with Grey Colour Synthetic Enamel Paint. The L.T. A.C. Supply Cubical should be Fitted with 3 Nos. 100 Amp. Copper Bus Bar (3 Phase + Neutral), 5 No. 32 Amp. TPN MCB, 12 No. 40 Amp. DP MCB, 40 3 No. Link type Terminal Bock, Cable Glands etc. with Internal Wiring and then Installation of each L.T. A.C. Cubical on 1 meter long M.S. Angle Frame Structure after due Fabrication with the help of ScrapM.S. Angles to be Provided by the Department Free of Cost and Grouting of Legs of the M.S. Angle Frame Structure in the Ground with C.C. Mixture and Painting of the M.S. Angle Frame Structure with Synthetic Enamel Paint. (1Job per L.T. A.C. Cubical)
31Earthing of L.T. A.C. Supply Cubical with Providing & Fixing of 600 x 800 x 8mm size G.I. Plate with its Top At Least 3 Meter below the Ground Level with 20 mm dia. G.I. Pipe & Funnel for Watering, 1 No. 8 SWG G.I. Wire Earthing Lead etc. with Alternate Layer of Charcoal/Coke and Salt at Least 150 mm Thick Around it.Earthing of L.T. A.C. Supply Cubical with Providing & Fixing of 600 x 800 x 8mm size G.I. Plate with its Top At Least 3 Meter below the Ground Level with 20 mm dia. G.I. Pipe & Funnel for Watering, 1 No. 8 SWG G.I. Wire Earthing Lead etc. with Alternate Layer of Charcoal/Coke and Salt at Least 150 mm Thick Around it.
32Providing & Fixing of Updated Single Line Diagram in PVC sheet of size 6x6 feet of complete 132/33 KV switchyard of 132 KV S/S MankapurProviding & Fixing of Updated Single Line Diagram in PVC sheet of size 6x6 feet of complete 132/33 KV switchyard of 132 KV S/S Mankapur
33SWITCHYARD LIGHTINGSWITCHYARD LIGHTING
34Laying of following size PVC insulated Copper Control Cable from LT ACDB Cubical to various Junction Boxes below ground level in PVC conduit pipe (provided by the contractor) after due excavation back filling etc. including all labour, PVC pipe etc required for proper completion of the work (a) 2C x2.5 sq mmLaying of following size PVC insulated Copper Control Cable from LT ACDB Cubical to various Junction Boxes below ground level in PVC conduit pipe (provided by the contractor) after due excavation back filling etc. including all labour, PVC pipe etc required for proper completion of the work (a) 2C x2.5 sq mm
35Laying of Control Cables between LT Lighting Junction Box & LED Street Light Fittings along Gi Structure including necessary clamping with suitableMS Strip clamp with proper dressingLaying of Control Cables between LT Lighting Junction Box & LED Street Light Fittings along Gi Structure including necessary clamping with suitableMS Strip clamp with proper dressing
36Retro Reflective Sign Board for Bay/ Equipment of size 2 ft x 1.5 ft duly made of 2 mm thick Aluminum Sheet with face to be fully covered with 3 M DG Cube type Retro Reflective Sheet of Yellow Colour and letters shall be Computer cut and blue color 3 M DG Cube type retro reflective sheet. The sign board shall be fixed near the Road/Bay/Equipement with the help of frame of size 35mm X 35mm with provision of 2 nos. Leg for grouting duly painted in black color enameld paind and back side of the aluminium sheet shall be painted in smoke grey enameled paint complete in all respect to begrouted with casing of CC foundation.Retro Reflective Sign Board for Bay/ Equipment of size 2 ft x 1.5 ft duly made of 2 mm thick Aluminum Sheet with face to be fully covered with 3 M DG Cube type Retro Reflective Sheet of Yellow Colour and letters shall be Computer cut and blue color 3 M DG Cube type retro reflective sheet. The sign board shall be fixed near the Road/Bay/Equipement with the help of frame of size 35mm X 35mm with provision of 2 nos. Leg for grouting duly painted in black color enameld paind and back side of the aluminium sheet shall be painted in smoke grey enameled paint complete in all respect to begrouted with casing of CC foundation.

AI Tender Summary

OUR REF NO 56959027
AUTHORITY Government Departments
TENDER VALUE 54.68 Lakhs
LAST DATE 22-08-2026
Authority
Authority Name Uttar Pradesh Power Corporation Limited
Work Description Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Transmission Substation; Substation, Switchyard, Power House Equipment, Electrical System Or Installation; Service Provider - Work Of Stringing And Erection Of 132Kv Main Bus Bar And Transfer Bus At 132Kv S/S Mankapur , Stringing Of 132Kv Main Bus Bar 3 Phase With Moose Conductor Includingfitting Of Tension Clam, Hoisting Of Disc Insulator, Cutting Of Conductor And Also Shifting Of All Materials From Store Site.( 36 Mtr Approx) , Stringing Of 132Kv Transfer Bus Bar 3 Phase With Moose Conductor Including Fitting Of Tension Clam, Hoisting Of Disc Insulator, Cutting Of Conductor And Also Shifting Of All Materials From Store Site.( 36 Mtr Approx) , Stringing Of 132Kv Jack Bus 3 Phase With Panther Conductor Including Fitting Of Tension Clam, Hoisting Of Disc Insulator, Cutting Of Conductor Andalso Shifting Of All Materials From Store Site. , Stringing Of 132Kv Maskanwa Tss Bay From Dead End Tower To Main Bus Of Acsr Panther Conductor Including Fitting Of Tension Clam, Hoisting Of Disc Insulator, Cutting Of Conductor And Also Shifting Of All Materials From Storesite. , Carriage Of Structure & Other Materials , Carriage Of Sub-Station Structure Through Private Truck From Efu Naini (Allahabad) To Above Sub-Stations Alongwith Sorting. Sluftung And Loading At Naini And Unloading And Stacking At 132Kv Kv S/S Mankapur , Forconstruction 02 Nos 132Kv Maskanwa Tss Bay , Sorting Our And Stacking Of Main & Auxilary Structure As Per Bom At Efunaini (Allahabad) , Loading Of Structure On Pvt Truck / Trailer At Efu Naini. (+Nut/Bolts) , Transportation Of Structure From Efu Naını, Allahabad To Different Sub-Stations , Unloading And Proper Stacking Of Structure Parts Al Different Sub-Stations , Carriage Of Various Materials From Near By Substation If Required For Thecompletion Of Work. , Erection Of Structures, Equipments, C&R Panels For 02 Nos 132Kvmaskanwa Tss Bays , Erection Of Main And Auxiliary Structure Consisting Of Columns, Beams,Peaks, Masts Etc. And Auxiliary Structures Required For Installation Of Bays Akr/Bkr/Dkr/Abr/Alp/Bbl/Bct/Btis Etc. Including Shifting Of All Material Ie, Structure Parts Nuts, Bolts Washer Etc From Store To Site Of Erection, Erection Of Structure As Per Drawings And Practices Using Flat And Spring Washer With Each Bolt. Matching Of Holes, Cutting, Matching Of Member If Required Shall Also Be Done By The Contractor Without Any Extra Cost To Complete The Work Satisfactorily. All Material To Be Erected Shall Be Supplied By The Upptcl, Free Of Cost But All Men, Material And T&P Required For Satisfactonly Completion Of Work Shall Be Arranged By The Contractor At His Own Cost. , Complete Erection Of Following Equipment As Per Technical Specification (Including Shifting Of Material From Store To Site) & All Other Associated Works To Complete The Job Satisfactorily. , Erection Of Samast Energy Meter & Data Communication Work , Installation Of New 3P4w 0.2S Class Interface Energy Meters , Necessary Interconnection From Data Transmission Of Already Installed Samast Compliant Meters To Lan Switch Up To Dcu/Gateway And All Otherh/W.S/W Per No. , Installation & Commissioning Of Common Metering Cubicles For Meters. Dcu,Switch For 2 Iem , Laying Of Earthmat At 132/33Kv Extended Switchyard Area Alongwith Connecting Newly Laid Earthmat With Existing Earthmat, Equipments Earthing, Cable Laying And Other Miscellaneous Work. , Laying Of 40Mm Ms Rod For Main Earth Mat Below 750 Mm Of Plinth Level Including Excavation Of Trenches, Its Back Filing, Cutting Of Bar, Cross Welding Of Joints Etc. , Piercing Of 40Mm Dia Ms Electrodes Of 3 Meter Length Below 700 Mm Ofplinth Level, Excavation Of Trenches, Its Back Filing. , Making Of Shielding Mesh For 3Nos. 132Kv La By Fabrication Of 06Nos 3 Meter Long Electrode With 40 Mm Dia. M.S. Rod Having 150 Mm Long Conical Shape And Then Its Piercing Vertically In The Ground With Top 500 Mm Below Ground Level, Its Welding With 75X10 Mm Size M.S. Flat For Making Of Shielding Mesh For Las And Finally, Connecting The Shielding With Main Earth Mat At 2 Places And Finally Painting With Black Anti-Corrosive Paint, With Due Digging Of Earth/Trench, Its Back Filling. Two No Risers Of 75X10mm Ms Flat Will Be Welded With Existing Main Earth Mat To Auxiliary Structure, One Separate Riser Will Be Taken From The Laid Earth Mat To Corresponding La Through Surge Counter For Making Of Proper Mesh. , Laying Of Following Sizes Control Cables To Be Provided By Department As Per Requirements In Cable Trenches From C&R Panels To Various 132Kv Equipments, Junctions Boxes, Etc. In Switchyard, Also For Lighting Work From Lt Acdb To Lighting Junction Boxes As Per Cable Schedule Including Shifting Of Cables In Drums From Storage Place At The Sub Station To Erection Site & Shifting Back The Balance Cables To Stores At The Sub Station: , 2 C X 2.5 Sq. Mm , 4 C X 2.5 Sq. Mm , 6 C X 2.5 Sq. Mm , 10 C X 2.5 Sq. Mm , Inter Connection & Termination Of Above Laid Control Cables Between C&Rpanels In Panel To Various Equipments, Equipments To Equipments Including Dc Supply From Dcdb And Ac Supply From Acdb To Panels And Various Equipments, Junctions Boxes Etc. In Switchyard As Per Cable Schedule Including Making Necessary Holes In Gland Plates Or Boxes Wherever Required Alongwith Supply & Fixing Of Cable Glands Of Appropriate Sizes & Providing Of Ferrules For Each Core Of The Cables & Its Termination With Crimping Type Copper Lugs Alongwith Preparation Of Inter-Connection Drawing And Commissioning Of The Panel / Feeders In Co-Ordination With T&C Wing Including Providing Of 2 Sets Of Hard Copies Of As Executed Inter-Connection Drawing. , Providing & Fixing Of 3 Phase L.T. A.C. Supply Cubicals Of Size1200×600×500 Mm With Hinged Door And Proper Locking Arrangement Duly Made Of 16 Swg M.S. Sheet And Painted With Grey Colour Synthetic Enamel Paint. The L.T. A.C. Supply Cubical Should Be Fitted With 3 Nos. 100 . Copper Bus Bar (3 Phase + Neutral), 5 No. 32 . Tpn Mcb, 12 No. 40 . Dp Mcb, 40 3 No. Link Type Terminal Bock, Cable Glands Etc. With Internal Wiring And Then Installation Of Each L.T. A.C. Cubical On 1 Meter Long M.S. Angle Frame Structure After Due Fabrication With The Help Of Scrapm.S. Angles To Be Provided By The Department Free Of Cost And Grouting Of Legs Of The M.S. Angle Frame Structure In The Ground With C.C. Mixture And Painting Of The M.S. Angle Frame Structure With Synthetic Enamel Paint. (1Job Per L.T. A.C. Cubical) , Earthing Of L.T. A.C. Supply Cubical With Providing & Fixing Of 600 X 800 X 8Mm Size G.I. Plate With Its Top At Least 3 Meter Below The Ground Level With 20 Mm Dia. G.I. Pipe & Funnel For Watering, 1 No. 8 Swg G.I. Wire Earthing Lead Etc. With Alternate Layer Of Charcoal/Coke And Salt At Least 150 Mm Thick Around It. , Providing & Fixing Of Updated Single Line Diagram In Pvc Sheet Of Size 6X6 Feet Of Complete 132/33 Kv Switchyard Of 132 Kv S/S Mankapur , Switchyard Lighting , Laying Of Following Size Pvc Insulated Copper Control Cable From Lt Acdb Cubical To Various Junction Boxes Below Ground Level In Pvc Conduit Pipe (Provided By The Contractor) After Due Excavation Back Filling Etc. Including All Labour, Pvc Pipe Etc Required For Proper Completion Of The Work (A) 2C X2.5 Sq Mm , Laying Of Control Cables Between Lt Lighting Junction Box & Led Street Light Fittings Along Gi Structure Including Necessary Cl Ing With Suitablems Strip Cl With Proper Dressing , Retro Reflective Sign Board For Bay/ Equipment Of Size 2 Ft X 1.5 Ft Duly Made Of 2 Mm Thick Aluminum Sheet With Face To Be Fully Covered With 3 M Dg Cube Type Retro Reflective Sheet Of Yellow Colour And Letters Shall Be Computer Cut And Blue Color 3 M Dg Cube Type Retro Reflective Sheet. The Sign Board Shall Be Fixed Near The Road/Bay/Equipement With The Help Of Frame Of Size 35Mm X 35Mm With Provision Of 2 Nos. Leg For Grouting Duly Painted In Black Color Enameld Paind And Back Side Of The Aluminium Sheet Shall Be Painted In Smoke Grey Enameled Paint Complete In All Respect To Begrouted With Casing Of Cc Foundation.
Basic Detail
Tender No GEM/2026/B/7905526
Bidding Type Tender
Location
City Sultanpur
State Uttar Pradesh
Key Dates
Publish Date 11 Aug 2026
Submission Date 22 Aug 2026
Open Date 22 Aug 2026
Finance
Tender Value 54.68 Lakhs
Tender Fee Ref. Documents
EMD 55000
Exemption Not Available
Document List
688bff01-abb4-4128-aa47-796f6e5c0718.pdf
1786457654.xlsx
1786458131.pdf
1786458136.pdf
1786458139.pdf
1786458142.pdf
ATC_82e21280-0895-4ce1-bab01786458505083_se_gonda.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 11, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 22, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 9 days
Aug 22, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 9 days

Tender Documents

Download All (ZIP) ↓
pdf

688bff01-abb4-4128-aa47-796f6e5c0718.pdf

xlsx

1786457654.xlsx

pdf

1786458131.pdf

pdf

1786458136.pdf

pdf

1786458139.pdf

pdf

1786458142.pdf

pdf

ATC_82e21280-0895-4ce1-bab01786458505083_se_gonda.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail