Tender For Erection Estimate For Additional 3 15 Mva Power Transformer In Sstd Scheme At 33 11 Kv S S Bhangarh At Village Bhangarh Under Dhulet Dc O M Div Rajgarh Under Dhar Circle
Tender Value
Ref. Documents
Estimated cost
Bid Submission
20 Aug 2026
5 days left
EMD
10000
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Dhar → Madhya Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Erection Estimate For Additional 3 15 Mva Power Transformer In Sstd Scheme At 33 11 Kv S S Bhangarh At Village Bhangarh Under Dhulet Dc O M Div Rajgarh Under Dhar Circle
BOQ
| Sl. No. | Item Description |
| 1 | Material Supply by Contractor |
| 2 | Back Filling of Poles with Boulders |
| 3 | Concreting of for poles @ 0.3 cmt. for pole (Including muffing) |
| 4 | M.S.Nuts and Bolts |
| 5 | 11 KV, 5KN PIN COMPOSITE POLYMER INSULATOR |
| 6 | Supply of PTR Foundation as per attached drawing |
| 7 | T CLAMP ALUMINUM FOR BUS BAR PANTHER RUN PANTHER TAP |
| 8 | 11KV Strain hard ware fitting |
| 9 | Erection of Plinth per VCB- 33KV or 11KV [Pit digging-size(3x2x0.6) = 3.6 cu. Mtr,Base filling by Kopra in case of Black cotton soil-1.92 cmt., concreting, curing and back filling of pits ] |
| 10 | 33 KV,10 KN PIN COMPOSITE POLYMER INSULATOR |
| 11 | 33 KV , 45 KN 16mm FRP with 25mm per KV Creepage DISC POLYMER LONG ROD TYPE T&C INSULATOR (FOR 11KV SIDE) |
| 12 | 11 KV (45KN) 16mm FRP with 25mm per KV creepage Disc Insulator Polymer |
| 13 | 33 KV COMPOSITE POLYMER STRAIN SET WITH HARD WARE SUITABLE FOR PANTHER CONDUCTOR (FOR 11KV SIDE) |
| 14 | work execute by Contractor |
| 15 | Back Filling of Poles with Boulders |
| 16 | For Concreting (1:3:6) 0.36 H-Beam -7/9m & RSJ 9.3 m,PCC PoleDP/TP/4P of 140 kg.8m 200Kg.9m 280Kg 0.9m,0.56 for 11m,0.60 for 13m,0.67for 15m Per Pole include muff wid Pit digging,0.3per stay(20/25)etc |
| 17 | AAAC Rabbit conductor 0.05 sq. inch (55 sq.mm. Al.Eq.) |
| 18 | Anti climbing Device (Barbed Wire) GS 2.24 mm Dia (14 SWG) |
| 19 | PCC POLE 140 KGS 8 MTRS LONG |
| 20 | Errection of 11 KV V CROSS ARM 65X65X6 MM. ANGLE TYPE |
| 21 | 11 KV TOP CLAMPS 65x65x6 mm ANGLE TYPE |
| 22 | STAY SET WITHOUT STAY WIRE 16 MM. (PAINTED) |
| 23 | Danger Boards Enamalled Type 11KV |
| 24 | Carpet guarding (2 No. 33KV Guarding channel+2 no. Bolt 20 mm.-GI wire 6 SWG-25kg+Gi. Wire 8SWG-12 kg.) |
| 25 | 11 KV, 5KN PIN COMPOSITE POLYMER INSULATOR |
| 26 | Stone Block/Pre cast block for base pedding 450x450x75mm |
| 27 | Errection of PTR Foundation as per attached drawing |
| 28 | 33 KV CT Outdoor Oil immersed type, 3 Core, 200-100/5-5-1 Amp, Class 0.5 for differential protection |
| 29 | 11KV CT OUTDOOR TYPE 300-150 / 5-5 AMP |
| 30 | 11 KV SINGLE PHASE PTS OIL IMMERSED |
| 31 | 33 KV VCB, Outdoor Porcelain clad type with complete structure and accessories |
| 32 | 11 KV VCB, OUTDOOR PORCELAIN CLAD TYPE WITH COMPLETE STRUCTURE AND ACCESSORIES |
| 33 | 33 KV CONTROL & RELAY PANEL WITH STATIC RELAY FOR TRANSFORMER PROTECTION |
| 34 | 11 KV control & relay panel with static relay for transformer protection |
| 35 | 11 KV CONTROL & RELAY PANEL WITH NUMERICAL STATIC RELAY FOR DOUBLE FEEDER PROTECTION (2F) |
| 36 | 33 KV Lightening arrestor Gapless type |
| 37 | 9 KV Gapless type Metal oxide (10 KA) Polymer for 33/11 kv S/s type |
| 38 | 11KV 600AMP,12.5KA MOTORIZED ISOLATORS (TINNED COPPER CONTACT) WITHAOUT EARTH SWITCH |
| 39 | 33KV 400AMP,12.5KA MOTORIZED ISOLATORS (TINNED COPPER CONTACT) WITHAOUT EARTH SWITCH |
| 40 | Mesh Earthing of ADDL PTR at 33/11kv sub station in black cotton soil as per schedule G-2.1 |
| 41 | COPPER CONTROL CABLE 2 CORE, 2.5 SQMM PVC UNARMOURED |
| 42 | COPPER CONTROL CABLE 4 CORE, 2.5 SQMM PVC UNARMOURED |
| 43 | COPPER CONTROL CABLE 8 CORE, 2.5 SQMM PVC UNARMORED |
| 44 | COPPER CONTROL CABLE 12 CORE, 2.5 SQMM PVC UNARMOURED |
| 45 | T CLAMP ALUMINUM FOR BUS BAR PANTHER RUN PANTHER TAP |
| 46 | H- BEAM 11 METER 152 X 152 MM 37.1 KG/METER |
| 47 | H- BEAM 9 METER 152 X 152 MM 37.1 KG/METER = 333.9 kg. FOR 11KV GANTRY STRUCTURE |
| 48 | H- BEAM 7 METER 152 X 152 MM 37.1 KG/METER = 259.7 kg. FOR 5' CENTER JUMPER SUPPORT FOR 33 & 11KV SIDE |
| 49 | 33 KV TOP CLAMPS ANGLE TYPE |
| 50 | Errection D.C. CHANNEL 100X50X6MM 4.8 MTRS CENTER TO CENTER (set) |
| 51 | DC.CROSS ARMS 8` (2.4 METER ) CENTRE TO CENTRE 100X50X6 MM CHANNEL (set) |
| 52 | DC.CROSS ARMS 5` (1.5 METER) CENTRE TO CENTRE 100X50X6MM CHANNEL |
| 53 | ERRECTION OF HORIZONATAL & CROSS BRACING 8' CENTRE (wt of each X-BRACING-64.29 Kg (set) |
| 54 | DANGER BOARD ENAMELED 33 KV |
| 55 | Erection of Plinth per VCB- 33KV or 11KV [Pit digging-size(3x2x0.6) = 3.6 cu. Mtr,Base filling by Kopra in case of Black cotton soil-1.92 cmt., concreting, curing and back filling of pits ] |
| 56 | 33 KV,10 KN PIN COMPOSITE POLYMER INSULATOR |
| 57 | 33 KV , 45 KN 16mm FRP with 25mm per KV Creepage DISC POLYMER LONG ROD TYPE T&C INSULATOR (FOR 11KV SIDE) |
| 58 | 11 KV (45KN) 16mm FRP with 25mm per KV creepage Disc Insulator Polymer |
| 59 | Stringing of Each 33 KV Bus- upper and lower including drop jumpering, jointing with clamps, incoming DP/ ME to BUS |
| 60 | Stringing of Each 11 KV Bus-upper and lower bus including, drop jumpering and jointing with clamps,through outgoing VCB/ ME/ DP, upto station transformer |
| 61 | Errection of Stringing of All 33 KV & 11 KV Jumpers - from 33 KV gartry through 33 KV VCB to PTR to 11 KV gantry through 11 KV VCB |
| 62 | DC.CROSS ARMS 4` (1.2 METER) CENTRE TO CENTRE 100X50X6MM. CHANNEL |
| 63 | Bracing / Support Angle of 65x65x6mm 1.2 Mtr (4 feet) Center DP |
| 64 | STAY SET WITHOUT STAY WIRE 20 MM. (PAINTED) |
| 65 | Power Transformer Jumper Work |
| 66 | Crane charges for Handling & installation of Power Transformer with fitting of all radiaters (ii) 33/11 KV S/S above 50 km. . from crane availablity location |
| 67 | Total material supply by Contractor |
| 68 | Total Labour |
| 69 | GST Amount @ 18% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Aug 11, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 20, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysAug 21, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender