Tender For Design, Manufacture, Supply, Installation, Testing And Commissioning Of Automatic Fare Collection System Including Central Computer & Back-Office For 24 Stations Of Corridor-1 & 2 Of Phase-1 Of Patna Mrts With Fi/Acquirer Bank
Tender Overview
Project Description
Tender for Design, Manufacture, Supply, Installation, Testing And Commissioning Of Automatic Fare Collection System Including Central Computer & Back-Office For 24 Stations Of Corridor-1 & 2 Of Phase-1 Of Patna Mrts With Fi/Acquirer Bank
BOQ
| Sl. No. | Item Description |
| 1 | Schedule 1: Supply |
| 2 | Schedule 2: Supply of Spares |
| 3 | Schedule 3: Installation of 24 stations including Central Computer |
| 4 | Schedule 4: Commissioning of 24 stations including Central Computer |
| 5 | Schedule 5: Design, Interfacing and Application Engineering |
| 6 | Schedule 6: Supervised Maintenance and Training |
| 7 | Schedule 7: Upgradation of existing 5 stations Please Enable Macros to View BoQ information Name of Work: Design, Manufacture, Supply, Installation, Testing and Commissioning of Automatic FareCollection System including Central Computer & back-office for 24 stations of Corridor-1 & 2 ofPhase-1 of Patna MRTS with FI/Acquirer Bank S. No. Preamble |
| 8 | The Bill of Quantities shall be read in conjunction with Instructions to Tenderers, General and Special Conditions of Contract, Notice Inviting Tenders and Employer’s Requirements (General Specifications & Particular Specifications). |
| 9 | Tenderer shall note that prices shall be quoted against each item in the price schedule, the tenderers are advised to quote the price inclusive of all central/state/local taxes, tax under reverse charge mechanism, duties, levies, cess, and all other incidental charges required to fulfil the tender conditions including statutory deduction viz. TDS towards Income Tax/GST/Labour Cess etc. after considering clause C2.4, C2.5 & C2.6 of ITT. |
| 10 | The Bidder shall quote any unconditional discounts in terms of percentage figure on total bid price so that the discounts can be evaluated by simple arithmetic calculation during financial evaluation of the bids, to arrive at the net total price of the bid. |
| 11 | If the tenderer fails to quote rates against any item, the tender may be treated as incomplete and non – responsive and shall be rejected. |
| 12 | Errors will be corrected by the employer for any arithmetic errors in computation or summation as per contract conditions. |
| 13 | No Price variation is admissible in this contract. |
| 14 | Tenderer shall note that total price mentioned in Tender Total of Annexure-2 of ITT and BOQ total price must be equal. In case of discrepancies BOQ total price shall prevail. |
| 15 | Tenderer shall note that total price mentioned in BOQ after discount and Annexure-2 of ITT must be equal. In case of any discrepancies BOQ total price shall prevail and Milestone shall be apportioned accordingly by considering the same discount as mentioned in BOQ. |
| 16 | The rates and prices to be tendered in the Pricing Document are for completed and finished items of work and complete in all respect. It will be deemed to include cost of all plants, labour, supervision, materials, transport, all temporary works, erection, maintenance, contractor’s profit and establishment/overheads, all general risks, insurance liabilities, compliance of labour laws and obligations set out or implied in the contracts |
| 17 | Tenderer shall note that the Part-1 of Annexure-2 of ITT is only instructions for completing the pricing document, whereas Part-II of Annexure-2 of ITT is required to be prepared and submit along with the pricing document (Vol-5) by the tenderer. |
| 18 | For the List of spares for 10 years of system operation from the last date of Taking over of whole works, the bidder shall submit unpriced list of spares for maintenance of supplied system in the format as per Appendix- 32 of FOT in Technical Package and priced list for the same in the Financial Package. However, due to any reason(s), if the tenderer is not able to submit unpriced list of spares for maintenance of supplied system in the format as per Appendix- 32 of FOT in Technical Package and priced list for the same in the Financial Package, tenderer shall submit an undertaking in the format as per Appendix-33 of FOT in the Technical Package. The rates of these spares (Appendix-32 of FOT) will not be considered for tender evaluation while assessing the L1 bidder. For detailed information SCC clause 55 may be referred. |
| 19 | Tenderer shall note that the pricing for unconditional withdrawal of the deviations from Instructions to Tenderer, GCC & SCC and the Employer’s Requirements (General Specifications and Particular Specifications) noted in the Appendix 13 has been given in the financial bid.The Tenderer shall indicate price adjustment against each deviation in Appendix - N of Pricing Document. This price is the price on which the tenderer shall reduce from his tender price if deviation(s) is/are accepted by the Employer.If there is no deviation, the statement should be returned duly signed with an endorsement indicating ‘No Deviations’. In case, Performa of deviations is not submitted or submitted as blank, it will be construed that the tenderer has not proposed any deviations from tender documents.Tenderer must confirm that all implicit and explicit deviations, comments and remarks mentioned elsewhere in our proposal shall be treated as NULL and VOID and stand withdrawn and the unpriced deviations will be treated as NULL and VOID. |
| 20 | Tenderer shall note that all the pages of documents submitted/uploaded as part of bid documents must be signed by the authorised signatory of the tenderer. For detailed information ITT clause A4.1 & C24.2 may be referred. |
| 21 | Hand Held Portable Device |
| 22 | TOM/EFO |
| 23 | Cash- TIM |
| 24 | Cashless-TIM |
| 25 | Station Computer |
| 26 | Data Switch |
| 27 | Station Router |
| 28 | Switch rack with patch panel, connector etc complete |
| 29 | Router rack with patch panel, connector etc complete Electrical Cabinet (A) for existing 5 stations Electrical Cabinet (A) for remaining stations Electrical Cabinet (B) for existing 5 stations Electrical Cabinet (B) for remaining stations Electrical Cabinet (C) for existing 5 stations Electrical Cabinet (C) for remaining stations Power Cable for existing 5 Elavated station(Unit =1 Station LS) Power Cable for remaining Elavated station(Unit =1 Station LS) |
| 30 | Power Cable for Underground station(Unit =1 Station LS) LAN Cable - for existing 5Elevated station CAT-6/OFC (Unit =1 Station LS) LAN Cable - for remaining Elevated station CAT-6/OFC (Unit =1 Station LS) |
| 31 | LAN Cable - for Underground station CAT-6/OFC (Unit =1Station LS) |
| 32 | CPU Racks for TOM / EFO |
| 33 | Emergency switch with housing |
| 34 | Supply & installation of swing barrier |
| 35 | Central Server (at OCC):Supply of Line Central Computer and associated Hardware/Workstations/OS/software with required networking equipment, racks, cabling and accessories |
| 36 | Central Server (at BCC): Supply of Line Central Computer and associated BCC Hardware/Workstations/OS/software with required networking equipment ,racks, cabling and accessories at Backup OCC |
| 37 | BACK OFFICE (at OCC) :Supply of Backoffice Servers along with Software for TG, UPI, Website Integration at OCC (Hardware/OS/software /workstations) with required networking equipment (Router, switches, firewall),racks, cabling and accessories with a fully redundant setup |
| 38 | BACK OFFICE (at BCC): Supply of Backoffice Servers along with Software for TG, UPI, Website Integration with single node set up at BCC(Hardware/OS/software/workstations) with required networking equipment (Router, switches, firewall), racks, cabling and accessories |
| 39 | Software Development Center Including1 Entry gate, 1 Exit gate, 1 TOM/EFO,1 TIM , 1HHD,1 CSM,1SC,1Switch, (Data Centre(CC) with required netwoking and accessories Discount Offered (in percentage) Bank Note Recycler for TVM |
| 40 | Gate cabinets (SM) |
| 41 | Hand Held Portable Device |
| 42 | TOM/EFO |
| 43 | Cash- TIM |
| 44 | Cashless- TIM |
| 45 | Station Computer |
| 46 | Data Switch |
| 47 | Station Router |
| 48 | Switch rack with patch panel, connector etc complete |
| 49 | Router rack with patch panel, connector etc complete |
| 50 | Electrical Cabinet (A) |
| 51 | Electrical Cabinet (B) |
| 52 | Electrical Cabinet (C) |
| 53 | CPU Racks for TOM / EFO |
| 54 | Emergency switch with housing |
| 55 | Supply & installation of swing barrier |
| 56 | Laptop Maintenance tool |
| 57 | Spare Modules -10% of installed quantity (As per Appendix 2.4 of ER consist of equipment modules) |
| 58 | Any other item(s) considered necessaryto comply with Scope of Work. Discount Offered (in percentage) |
| 59 | Gate cabinets (SM) |
| 60 | TOM/EFO |
| 61 | TIM (cash) |
| 62 | TIM (cashless) |
| 63 | Station Computer including Installation of SC Server in TER (Cabling, routing etc.) |
| 64 | Data Switch |
| 65 | Station Router |
| 66 | Switch rack with patch panel, connector etc complete |
| 67 | Router rack with patch panel, connector etc complete |
| 68 | Electrical Cabinet ( A) |
| 69 | Electrical Cabinet ( B) |
| 70 | Electrical Cabinet ( C) |
| 71 | Power Cabling for Elavated station (Unit =1 Station LS) |
| 72 | Power Cabling for Underground station(Unit =1 Station LS) |
| 73 | LAN Cabling - for Elevated station CAT-6/OFC (Unit =1 Station LS) |
| 74 | LAN Cabling - for Underground station CAT-6/OFC (Unit =1 Station LS) |
| 75 | Central Server (at OCC):Line Central Computer and associated Hardware / Workstations / OS / software with required networking equipment, racks, cabling and accessories |
| 76 | Central Server (at BCC): Line Central Computer and associated BCC Hardware / Workstations / OS / software with required networking equipment ,racks, cabling and accessories at Backup OCC |
| 77 | BACK OFFICE (at OCC): Backoffice Servers along with Software for TG, UPI, Website Integration with single node set up Hardware/OS/software/workstations) with required networking equipment (Router, switches, firewall), racks, cabling and accessories |
| 78 | BACK OFFICE (at BCC): Backoffice Servers along with Software for TG, UPI, Website Integration with single node set up Hardware/OS/software/workstations) with required networking equipment (Router, switches, firewall), racks, cabling and accessories |
| 79 | Installation of Software Development Center including Installaton of various AFC equipment with required networking, cabling and accessories |
| 80 | Any other item for completion of the work Discount Offered (in percentage) |
| 81 | Installation Verification and Partial Acceptance Test |
| 82 | System Acceptance Test |
| 83 | Integrated testing and commissioning |
| 84 | Service Trial Discount Offered (in percentage) |
| 85 | Construction & Setup of Project office & Storage space |
| 86 | *Support During Defects Liability Period (Workshop Repair, Support for Call-out Services) for 3 years |
| 87 | Project Management |
| 88 | Submission of complete design & Documents for AFC System incl Prelim. Design, Final design, AFC Equipment Drawings, Interface application engineering, configuration data and software delivery for NCMC and QR |
| 89 | Certification cost |
| 90 | Interface with Acquirer Bank |
| 91 | Any other item for completion of the work SCHEDULE TOTAL CARRIED TO SUMMARY Discount Offered (in percentage) * Cost of DLP Support Shall be minimum 4% of Total Tender Total |
| 92 | Training - Local Trainer man months |
| 93 | Maintenance Supervisor - Local Supervisor manmonth |
| 94 | Maintenance Training Trainer manmonths |
| 95 | Operation Training- manmonths |
| 96 | Upgradation of existing TOM/EFO, Electrical cabinet, Networks & Gate of 5 stations |
| 97 | AFC Gate decommissioning and commissioning for existing 5 stations Discount Offered (in percentage) APPENDIX N Name of Work: PS:04 Design, Manufacture, Supply, Installation, Testing and Commissioning of Automatic Fare Collection System including Central Computer & back-office for 24 stations of Corridor-1 & 2 of Phase-1 of Patna MRTS with FI/Acquirer Bank PRICING OF UNQUALIFIED WITHDRAWAL OF CONDITIONS, QUALIFICATIONS, DEVIATIONS ETC. SUBMITTED IN APPENDIX 13 TO FORM OF TENDER Name of Bidder/firm: Item Condition, Qualification, Deviation etc. Increase or Decrease for unqualified withdrawal of each conditions, qualification, deviation etc. Indian Rupees (Incl. All Taxes and Duties) Notes: 1. In case price for unqualified withdrawal of any remark, comment, condition, qualification or deviation etc. indicated in Appendix 13 of FOT is not quoted in 'APPENDIX N', it shall be considered that the remark, comment, condition, qualification or deviation i 2. In this appendix, the tenderer shall indicate every key date that will be affected by each remark, comment, condition, qualifications or deviation, etc. that has been specified in Appendix 13. 3.Where there is no deviation, the statement should be returned duly signed with an endorsement indicating ‘No Deviations’. In case, Performa of deviations is not submitted or submitted as blank, it will be construed that the tenderer has not proposed any 4. Prices for unqualified withdrawal of each remark, comment, condition, qualification or deviation etc. that has been specified in Appendix 13 shall be quoted in this Appendix-N, 5.If the tenderer proposes deviations in tender documents, and/or any other terms and conditions of the tender, other than in this Annexure, it will have no effect. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 15 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 16 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender