Drinking Water Supply and Sanitation Government Departments Closing in 19 days TDR #56949444

Tender For Investigation, Survey (On G.I.S. Basis) & Construction Of 10.20 Mld Stp With 19.20 Kld Co-Treatment Including Mps, I&D Of Drains And Structure, Rising Main, Treated Effluent Line With Scada Etc. In Faridpur Nagar Palika Parishad, Distt-Bar

Issued by Government Departments · Bareilly, Uttar Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
31 Aug 2026
19 days left
EMD
26.68 Lakhs
Bank guarantee accepted
Document Fee
23600
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Bareilly → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Investigation, Survey (On G.I.S. Basis) & Construction Of 10.20 Mld Stp With 19.20 Kld Co-Treatment Including Mps, I&D Of Drains And Structure, Rising Main, Treated Effluent Line With Scada Etc. In Faridpur Nagar Palika Parishad, Distt-Bareilly. Under Sbm 2.0

BOQ

Name of Work:- Investigation, Survey (On G.I.S. Basis) & construction of 10.20 MLD STP with 19.20 KLD co-treatment including MPS, I&D of drains and structure, rising main, treated effluent line with SCADA etc. in Faridpur Nagar Palika Parishad, Distt-Bareilly. Under SBM 2.0
Sl. No. Item Description
1STP(10.20MLD) WITH CO-TREATMENT FACILITY(19.20KLD) INCLUDING COST OF MPS
2Design, Construction, Supply of all materials, Erection and Commissioning of STP with Faecal Sludge Co-Treatment facilities (10.2 MLD Sewage Treatment Plant cum 10.0 KLD Co-treatment) with all the civil, electrical , mechanical, instrumentation and scada system, LT/HT panel, sub station building, DG set foundation, admin buidling, laboratories, meter room etc. all complete for co-treatment facilities including the cost of MPS. The quality of treated effluent shall be as per CPHEEO Manual for agricultural uses, which is: PH-6.5 TO 8.3, SS-30 mg/l, Oil&Grease-10 mg/l, BOD-20mg/1 (preferably 10 mg/l) , COD-30 mg/l , Residual chlorine-nil , TKN-10mg/l, Nitrate N-10 mg/l, F.C.-230 MPN/100 ml, Dissolved P-5 mg/l (preferable 2 mg/l). The rate is considered for SBR Technology. The STP shall be capable to treat the raw sewage having minimum concentration mentioned in CPHEEO manual's table 5.4.
3Civil Work
4E&M Work
5Development work for STP
6Construction of Boundary Wall at the STP site
7MS gate (3.6m wide gate)
8MS gate (1.2m wide gate)
9Construction of Internal Road (Bituminous Road)
10Cost of external water supply, electrification and sanitation work
11Site Development work
12I&D PIPES AND APPURTENANCES
13Excavation below G.L. upto depth as specified for laying sewer and manhole ordinary soil (earth, sand, loam and clay) including cutting of joints pits ramming dressing) leveling, refilling of trenches in 20 cm layer watering and ramming the same including
14(a) 0.00 to 1.50 m
15(b) 01.50 to 03.00 m
16(c) 03.00 to 04.50 m
17(d) 04.50 to 06.00 m
18Provide and fix close timbering in trenches for the depth as specified below G.L. consisting of 40 mm thick approved country wood plank for polling board 125 x 75 mm Indian Sal Wood wallers and 100 mm dia sal wood ballies for shuttering at 1.5 m C/C including all labour etc , complete
19(a) 0.00 to 3 m
20(b) 03.00 to 06.00 m
21Same as item No. 4 but for open timbering
22(a) 0.00 to 03.00 m
23Supply of Double Wall Corrugated (DWC) Pipes of Class SN8 Structured wall polyethelene piping systems (pipe with online/offline coupler and elastomeric sealling) with non-smooth external annular corrugated and smooth internal surface (double wall) for non pressure underground sewerage application as IS 16098 (Part-2):2013
24200 mm dia
25250 mm dia
26Supply of Fittings (Couplers, Sealing rings, etc.) for Double Wall Corrugated (DWC) pipes of Class SN8 Structured wall polyethelene piping systems (pipe with online/offline coupler and elastomeric sealling) with non-smooth External Annular Corrugated and Smooth Internal Surface (Double Wall) for non pressure underground sewerage application as IS 16098 (Part-2):2013
27200 mm dia
28250 mm dia
29Lowering, Laying and jointing of Double Wall Corrugated (DWC) pipes of Class SN8 Structured wall (External Annular Corrugated & Smooth Internal Surface) polyethelene pipe and fittings with the help of coupler (online/offline coupler) attached with one end of pipes, sliding over the elastomeric sealing rubber ring placed on the sepecified vally of the corrugation at the spigot end,loweing the same into the trench, laying on the lower bedding (constructed at bottom of the trenches) at prescribed gradient, depth & alignment, testing the water tightness of the joints, ensuring the continuity tests of specified pipe segments etc. complete as per drawing, specifications and detailed engineering, including carriage of pipes &fittings from site stacks to the place of laying etc. as per direction of Engineer-In-Charge.
30150 mm dia pipe
3100.00 -0 1.50 m
32250 mm dia pipe
3301.50 -0 3.00 m
34Supply of following sizes of RCC spigotted and socketed non pressure pipes( Dia. In mm ) with structural strength as per IS 458 : 2003 and its latest amendment(s).
35300 mm dia
36350 mm dia
37400 mm dia
38600 mm dia
39700 mm dia
40Carting following sizes of R.C.C. Hume pipe NP3 Class Socket / spigot rubber ring jointing and specials from store to the work lowering the same in to the trenches upto depth as specified below G.L. true to alignment including excavation of earth
41300 mm dia pipe
4201.50 - 0 3.00 m
4303.00 - 04.50 m
4404.50 - 06.00 m
45350 mm dia pipe
4603.00 - 04.50 m
47400 mm dia pipe
4803.00 - 04.50 m
49600 mm dia pipe
5003.00 - 04.50 m
5104.50 - 06.00 m
52700 mm dia pipe
5303.00 - 04.50 m
54Cement concrete work in bedding below G.L. at specified depth with cement, coarse sand and 20 mm gauge approved stone ballast (1:2:4) including supply of all materials, labour, T&P etc. required for the proper completion of work. (As per statement attached
55(b) 01.50 to 03.00 m
56(c) 03.00 to 04.50 m
57(d) 04.50 to 06.00 m
58Sand filling including supply of all materials, labour, T&P etc. into the trenches for bedding of DWC Pipes including watering compaction, labour T&P etc. for completion of work.
59(a) 00.00 to 01.50 m
60(b) 01.50 to 03.00 m
61Construction of circular type brick masonry manhole (with Extra Heavy Duty type manhole cover) with top slab made of cement concrete 1:1.5:3 with graded granite stone aggregate (12 mm nominal size), foundation concrete 1:4:8 graded stone aggregate other than granite 40mm nominal size, wall made of brick masonry using 1st class bricks having crushing strength between 100 to 149 kg/cm² in cement mortar 1:4 inside plastering 12 mm thick 1:3 finished smooth with neat cement, pinning, outside plaster 1:4 and making channels with cement concrete 1:2:4 graded granite stone aggregate (12 mm nominal size) complete as per specifications.
62900mm internal dia., 1.65m deep
631200mm internal dia., 2.30m deep
641500mm internal dia., 4.95m deep
65Extra for every additional depth of 1 m or part there of in following size of circular manholes.
66900mm internal dia., 1.65m deep
671200mm internal dia., 2.30m deep
681500mm internal dia., 4.95m deep
69Dismantling/Cutting of the following type of road for laying sewers, manholes, sewer connection chambers etc. including shorting out and stacking serviceable materials and disposal of unserviceable materials upto distance of 50 m.
70Bituminous road
71Concrete road
72Interlocking tile road
73B.O.E road
74Reinstatement of the following type of road for laying sewers, manholes, sewer connection chambers etc. including shorting out and stacking serviceable materials and disposal of unserviceable materials upto distance of 50 m.
75Bituminous road
76Concrete road
77Interlocking tile road
78B.O.E road
79Providing and erecting temporary barricading at site as per drawing/ direction of Engineer-in-Charge which includes hiring of Eucalyptus Ballies and arrangement for traffic diversion such as traffic signals during construction at site as directed by the Engineer-in-Charge. The barricading provided shall be retained in position at site continuously i/c shifting of barricading from one location to another location as many times as required during the execution of the entire work till its completion. Rate include its maintenance for damages, painting, all incidentals, labour materials, equipments and works required to execute the job. The barricading shall not be removed without prior approval of Engineer-in-Charge. (Note :- One time payment shall be made for providing barricading from start of work till completion of work i/c shifting. The barricading provided shall remain to be the property of the contractor on completion of the work). The rate is for unit length of pipe laying.
80Disposal of Surplus Earth
81Provision for shifting and reinstatement of electric and telephone poles during excavation and laying of sewer lines.
82Provision for shifting of electric and telephone cable, existing water supply mains falling in the alignment of conveying main during excavation and the restoring utilities / services to its original condition. etc. during excavation and laying of sewer lines. (1% of Sl. 1 to 16)
83Interception & Diversion(I&D) works
84I&D structure
85Rising main(600MM DIA DI K9) from MPS to STP
86Clearing jungle including uprooting of rank vegitation, grass, brush wood trees and saplings of girth upto 30cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared.
87Excavating trenches for pipes including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth including consolidating each deposited layer by ramming, watering etc., and disposing of surplus excavated soil as directed, within a lead of 50 m.
88do - in all kindes of soil - 100%
891.5 to 3.0 mtr. Depth
90Providing Coarse Clean Sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I (mode of measurement compacted volume).
91Pipes conforming to IS : 8329 - 600 mm
92Supply and laying standard specials etc. all complete
93Up to 600 mm dia
94Providing and fixing C.I. sluice valves (with cap) complete with bolts,
95nuts, rubber insertions etc. (the tail pieces if required will be paid
96150 mm
97Carting of 600mm dia DI K9 pipe and specials from store to the work lowering the same in to the trenches upto depth as specified below G.L. inclduing testing of pipes etc.
98Providing & Constructing masonry Chamber 1.5x1.5x1.5 m inside, in brick work in cement mortar 1:3 (1 cement : 3 coarse sand) for valve, with cast insitu RCC slab with necessary reinforcment.The valve chamber shall be plastered with CM 1:4, A levelling coars of M10 shall be provided.The cost is inclusive of excavation , disposal and construction of valve chamber with moduar bricks plasting with cement mortar with all lead and lift etc., as per specification & drawing. (Refer 10.4 for Unit Cost Estimate)
99Sluice valve, Air valve chambers
100Treated effluent line (STP to Canal)
101Clearing jungle including uprooting of rank vegitation, grass, brush wood trees and saplings of girth upto 30cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared.
102Excavating trenches for pipes including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth including consolidating each deposited layer by ramming, watering etc., and disposing of surplus excavated soil as directed, within a lead of 50 m.
1030.0 to 1.5 mtr. Depth
104do - in all kindes of soil - 100%
1051.5 to 3.0 mtr. Depth
106Providing Coarse Clean Sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I (mode of measurement compacted volume).
107Supply of ISI Marked A.C. Pressure Pipe confirming to IS-1592/2003 or its latest amendment(s) including cost of one no. of AC coupling with a set of 3 rubber rings per meter length, including third party inspection charges, packing and forwaridng charges, transit insurance charges, road transportation charges etc. all complete. Class 15
108Pipes conforming to IS-1592/2003 - 600 mm
109Providing and fixing C.I. sluice valves (with cap) complete with bolts,
110nuts, rubber insertions etc. (the tail pieces if required will be paid
111CARTING FROM STORE, LAYING, JOINTING & TESTING CLASS I & II A.C. PRESURE PIPE WITH FITTING ETC. (600mm Dia.)
112Providing & Constructing masonry Chamber 1.5x1.5x1.5 m inside, in brick work in cement mortar 1:3 (1 cement : 3 coarse sand) for valve, with cast insitu RCC slab with necessary reinforcment.The valve chamber shall be plastered with CM 1:4, A levelling coars of M10 shall be provided.The cost is inclusive of excavation , disposal and construction of valve chamber with moduar bricks plasting with cement mortar with all lead and lift etc., as per specification & drawing.
113Sluice valve, Air valve chambers
114Dismantling/cutting of the following type of road for laying sewers, manholes, sewer connection chambers etc. including shorting out and stacking serviceable materials and disposal of unserviceable materials upto distance of 50 m.
115B.O.E road
116Reinstatement of the following type of road for laying sewers, manholes, sewer connection chambers etc. including shorting out and stacking serviceable materials and disposal of unserviceable materials upto distance of 50 m.
117B.O.E road
118Rehabiliation of Office Campus and Residential colony including repairing of old existing structure, fixing of new sanitary fittings, replacing of old furniture, developement of pathways, supply of new electrical equipments with all labour material T&P etc complete.(Details attached in tender document) Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56949444
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 31-08-2026
Authority
Authority Name Uttar Pradesh Jal Nigam
Work Description Tender for Investigation, Survey (On G.I.S. Basis) & Construction Of 10.20 Mld Stp With 19.20 Kld Co-Treatment Including Mps, I&D Of Drains And Structure, Rising Main, Treated Effluent Line With Scada Etc. In Faridpur Nagar Palika Parishad, Distt-Bareilly. Under Sbm 2.0
Basic Detail
Tender No 518/M-16/58 Date 09-06-2025
Bidding Type Tender
Location
City Bareilly
State Uttar Pradesh
Key Dates
Publish Date 11 Aug 2026
Submission Date 31 Aug 2026
Open Date 31 Aug 2026
Finance
Tender Value Ref. Documents
Tender Fee 23600
EMD 26.68 Lakhs
Exemption Not Available
Document List
60104537-3868-4ac1-971d-7311b5d9b3e1.html
BOQ_2210383.xls
DOCUMENT.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 11, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 31, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 19 days
Aug 31, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 19 days

Tender Documents

Download All (ZIP) ↓
html

60104537-3868-4ac1-971d-7311b5d9b3e1.html

xls

BOQ_2210383.xls

pdf

DOCUMENT.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders