Tender For Survey Of Pipeline Route, City Gate Stations And Area Survey For Cgd Network In Ga 11.03, Assam
Tender Value
Ref. Documents
Estimated cost
Bid Submission
01 Sep 2026
17 days left
EMD
7.15 Lakhs
Bank guarantee accepted
Document Fee
7000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Guwahati → Assam
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Survey Of Pipeline Route, City Gate Stations And Area Survey For Cgd Network In Ga 11.03, Assam
BOQ
| Sl. No. | Item Description |
| 1 | PART-A (PIPELINE SURVEY) |
| 2 | RECONNAISSANCE SURVEY FOR PIPELINE |
| 3 | Carryout reconnaissance survey as per Specification/ Scope of work in the tender and instructions of Engineer-in-Charge and submission of four coloured drawings and report. The reconnaissance survey shall be carried out proposing minimum three or more feasible alternative routes and giving details of likely crossings and other constraints that is likely to be encountered during pipeline construction on each route, future development plans of land owning authorities like Municipal corporation, Gram Panchayat, PWD, NHAI , etc., availability of land including ownership details and recommending the best feasible route. |
| 4 | DETAILED SURVEY FOR PIPELINE |
| 5 | Carrying out detailed pipeline route survey and all associated works along the pipeline route including Centreline Survey, Detailed Route Survey, Crossing survey (minor) , Collection of population density data, permanent monuments along the pipeline route, collection of all data, submission of Alignment sheet, providing all manpower, tools, tackles, materials, equipment's and other support, facilities (including mobilization and demobilization as required) necessary for the work, in accordance with requirement of Scope of Work document no. (P161-SOW-P001) and in compliance Specification for Topographic Survey (Annexure) enclosed with the tender document and as per instructions of the COMPANY ’s Representative including meeting all responsibilities and furnishing all documents for survey.Note: All drawings shall be generated in coordinates. |
| 6 | SOIL STRATIFICATION & CLASSIFICATION SURVEY |
| 7 | Carrying out Soil Stratification work along the pipeline route as per specification including and providing all men, tools, tackles, materials, testing equipment and other equipment other support facilities including mobilization and demobilization as required etc. as per tender document, The boring minimum 150 dia bore hole shall be either terminated at a depth of 3 M below NGL or on top of bed rock if rock is encountered at a depth of less than 3 M. and Boreholes shall be made at intervals of 250 M along the pipeline route, at all intermediate points where there is apparently a change in the type of soil and at any other place as directed by direction of Engineer-in-Charge.Note: Interval can be increased to 500 M then to 1 km in case soil strata is found to be same.This will required Approval of Company`s Representative / EPMC. Atleast 2 borehole shall be carriedout on the two side of each NH & SH crossing. |
| 8 | CORROSION SURVEY |
| 9 | Carrying out corrosion survey including measurement of soil resistivity at a depth of 1.0, 1.5 & 2.0 m interval at every 500 m, chemical analysis of soil/water, collection of additional data related to cathodic protection as per specification including providing man power, tools, tackles, materials, soil resistivity testing equipment, pipe/cable locator & other supporting facilities etc. including mobilization & demobilization necessary for survey and associated works, including compilation and presentation of data in four sets of Corrosion Survey Report as per technical specification, drawings, implementation schedule and other provisions of the tender document and instructions of Engineer-in-charge |
| 10 | MAJOR CROSSING SURVEY |
| 11 | Crossing Survey (To carry out a detailed survey covering a proposed crossing for NEGDCL Gas Pipeline using survey instruments and Providing Planimetry and ground profile (Section) details and levels at 5m interval as per technical specification, tender document and direction of EIC ). Preparation of of Crossing drawings required for laying of pipeline, all complete work should be as per specifications and the direction on Engineer-incharge. |
| 12 | Road (NH/SH) covering at least width of 20m on either side of proposed crossing. |
| 13 | Railway crossing covering at least a width of 40m on either side of proposed crossing. |
| 14 | Major water Crossing (Rivers) / Major Canal crossing covering at least a width of 50m on either side of proposed crossing. |
| 15 | CADASTRAL SURVEY |
| 16 | Carrying out Cadastral survey for RoU acquisition involving Collection of; -(a) Village Maps(Revenue Map), digitization of Village Map and transfer of alignment and RoU under acquisition in the maps.(b) Ownership details.(c) Field Measurement Book (FMB) etc. and submission as specified in Scope of work/Technical Specifications by providing all man power, tools, tackles, materials, equipment and other support, facilities (including mobilization and demobilization as required) necessary for the work, and as per instructions. Submission of drawing/Documents in hard as well as soft copies for each pipeline as per requirement of tender documents and instruction of Client. |
| 17 | ACQUISITION OF PERMANENT LAND (SV's, TERMINALS, CNG STATIONS & MOTHER STATIONS/ CGS) |
| 18 | Providing Services for permanent acquisition of land for SV Stations, Terminals and Re-route infrastructure etc. by ascertaining the pattadars and occupiers with concerned office and land records, finalisation of compensation, obtain consent of the pattadars and occupiers, facilitating in execution of Agreement to sale, obtaining sale purchase permission from authority(s), facilitating in registration of sale deed till submission of application for mutation as per details of scope of work of the tender document.Note: In case of change in Plot size rate will be considered pro rata basis.Note: Value of Land shall be paid by the owner. |
| 19 | Plot 1 for Terminal : 3 plots upto 1200 m2 of each plot |
| 20 | Plot 2 for Terminal : 3 plots above 1200m2 upto 2400 m2 of each plot |
| 21 | Plot 3 for Terminal : 3 plots above 2400m2 upto 3600 m2 of each plot |
| 22 | AREA SURVEY (FOR MDPE NETWORK) |
| 23 | Area Survey of MDPE Network to carry out Area Survey and propose feasible route for laying the proposed pipeline network and to indentify and record all the features of the area surveyed along with building, structures, drains pavements, roads etc. and including those likely to have bearing on alignment of proposed pipeline and to propose a pipeline route with respect to boundary giving forest from the nearest boundary which will have least obstruction, marking obstruction, if any, indentify the type of building type of road back lanes required to be cut to lay the pipelines, all the field data to be collected, superimposing the same on digitized satellite high resolution image (as mentioned in item no. ) and developing the drawings/ maps in scale 1:250 with full details marked, check and confirm completeness of data all complete as per specifications drawings and direction of the Engineer-in-Charge and giving drawings in 4 copies along with original editable CAD output including all data. |
| 24 | PART-B (PERMISSIONS) |
| 25 | Preparing the map for applying and Obtaining of permission from Municpal corporation, Gram Panchayat or various land owning authorities using Google map or secondary maps or survey maps or crossing maps as applicable ( With authorisation from concerned agency) and submission to concerned land owning agencies in the required format and /or uploading in the website as required for applying of permission and submitting 4 copies of the applied permission drawings along with soft editable copies and CAD output on CD to COMPANY/PMC. All liasioning works for applying and obtaining secondary maps is included in this item.Note: 1. Payment will be made for the final approved route for which application has been made to the land agencies.2. Item covers all works towards successful receipt of Permision for Laying & OFC and stations from Concerned authorities & Land owners.3. Number of permissions in terms of roads, i.e. if a certain no. of roads fall under the same jurisdriction, it will be treated as only 1 (one) permission. Bidder to quote accordingly. |
| 26 | NATIONAL HIGHWAY / EXPRESSWAY CROSSINGObtaining approval/ permissions from appropriate respective State /National and other authorities for the Gas pipeline crossings across National Highways etc. applicable for both pipeline and OFC laying, as per details of scope of work of the tender document. |
| 27 | ALONG WITH NATIONAL HIGHWAY (IN ROU OF HIGHWAY)Obtaining NOC from appropriate authority for laying pipeline & OFC parallel to National Highway/Express Highway , as per detailed scope of work of the tender document. |
| 28 | RAILWAY CROSSINGObtaining approval/permissions from Railway Authorities and any other authorities for the Gas pipeline crossings across Railways etc. applicable for both pipeline and OFC laying, as per details of scope of work of the tender document. |
| 29 | ALONG THE RAILWAYS (IN ROU OF RAILWAY)Obtaining NOC from appropriate authority for laying pipeline & OFC parallel to Railway, as per detailed scope of work of the tender document. |
| 30 | ALONG AND ACROSS STATE HIGHWAY (PER PERMISSION)Obtaining approval/permissions and NOC from respective State and other authorities for the Gas pipeline crossings along and across various State Highways, PWD Roads etc. applicable for both pipeline and OFC laying, as per details of scope of work of the tender document. |
| 31 | RIVER CROSSINGSObtaining approval/permissions from appropriate respective State /National and other authorities for the Gas pipeline crossings across Rivers etc. applicable for both pipeline and OFC laying, as per details of scope of work of the tender document. |
| 32 | OTHER PIPELINE AND UTILITIESObtaining approval/permissions from appropriate authorities for the Gas pipeline crossings across various other pipeline and utilities etc. applicable for both pipeline and OFC laying, as per details of scope of work of the tender document. |
| 33 | FOREST CROSSING PERMISSION SOCIAL FOREST (PER DIVISION)Obtaining approval/permissions/NOC from appropriate respective State /National and other authorities for the Gas pipeline crossings across the Forests land & Wildlife applicable for both pipeline and OFC ,as per details of scope of work of the tender document. Any survey (DGPS, etc.) if required by the Forest Department the same to be done by the vendor and no extra payment would be done for the same. |
| 34 | FOREST CROSSING PERMISSION PROTECTED AND RESERVED FOREST (PER DIVISION)Obtaining approval/permissions/NOC from appropriate respective State /National and other authorities for the Gas pipeline crossings across the Protected and Reserved forest land & Wildlife applicable for both pipeline and OFC ,as per details of scope of work of the tender document. Forest Approvals, includes proposed reserved forest/protected / reserved / sanctuary etc. all complete. Any survey (DGPS, etc.) if required by the Forest Department the same to be done by the vendor and no extra payment would be done for the same. |
| 35 | MDR/ODR, MUNICIPALITY ROAD & OTHER ROADSObtaining approval/permissions from appropriate respective State /National and other authorities for the Gas pipeline crossings across Other roads including village roads etc. applicable for both pipeline and OFC laying, as per details of scope of work of the tender document. |
| 36 | CANAL/ FIELD CHANNEL / NALA / DRAIN (UNDER JURISDICTION OF WATER RESOURCE DIVISION)Obtaining approval/permissions from appropriate respective State /National and other authorities for the Gas pipeline crossings across Nala, Drains, Canals & Field Channel etc. applicable for both pipeline and OFC laying, as per details of scope of work of the tender document.Note: Small Nala/Drain/Canal/ Field Channel will not be considered. |
| 37 | PART -B |
| 38 | Topo Graphical Survey Works For Terminal/ SV Stations/ IP Stations/ Mother station/ CGS Please Enable Macros to View BoQ information |
| 39 | Topo Graphical Survey Works For Terminal/ SV Stations/ IP Stations/ Mother station/ CGS Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Aug 11, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 01, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 17 daysSep 01, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 17 daysTender Documents