Tender For Comprehensive Construction And Pushing/Pulling & Blowing Of Plb Pipe/Of Cable Through Nhai Telecom Utility Duct Including Carriage/ Transportation, Uncoiling Of Duct, Opening /Closing, Dewatering & Silt Cleaning Of Manholes/ Handholes/ Rei
Tender Overview
Project Description
Tender for Comprehensive Construction And Pushing/Pulling & Blowing Of Plb Pipe/Of Cable Through Nhai Telecom Utility Duct Including Carriage/ Transportation, Uncoiling Of Duct, Opening /Closing, Dewatering & Silt Cleaning Of Manholes/ Handholes/ Reinforced Cement Concrete Chambers And Associated Works I.R.O. 65.4Km Ug Cable Laying And 2.9Km Adss Ofc Laying For Connecting Bhqs Under Dbn Project In Solan Ba
BOQ
| Sl. No. | Item Description |
| 1 | Material Required |
| 2 | Galvanized steel poles of tubular in design and swaged of the length 7 meters, with top cap welded and lightning spike and including MUFF |
| 3 | Galvanized steel poles of tubular in design and swaged of the length 8 meters, with top cap welded and lightning spike and including MUFF |
| 4 | Stay arrangement for 7M/8M steel poles of Galvanised Steel |
| 5 | Formed OFC Dead End and Termination Fittings including all supporting items. |
| 6 | OFC suspension fittings including all supporting items. |
| 7 | Adjustable Cable Storage Bracket. |
| 8 | DWC pipe ( 63 mm ) with coupler |
| 9 | SERVICES REQUIRED |
| 10 | Erection of 7 m / 8m poles including excavation, fixing of MUFF, concreting, curing, Backfilling, Reinstatement, Compaction of earth, Stay arrangements etc. and sign writing on poles with paint |
| 11 | Slinging / Laying of ADSS / AOF including fixing of installation accessories and fixtures etc. splicing & jointing of OF cable, Link Testing & Acceptance Testing and makeover of route with As Built Diagram (ABD) of installed cost towards collection of ADSS Cable / AOF Cable from BSNL’s Store Depot. |
| 12 | Construction of Joint Chamber as per EI supply & fixing of G.I. Pipe & PLB pipe for bringing down the of cable, supply of stone slab for covering the chamber and sand for filling the chamber |
| 13 | Installation of FDF and WSC/FTB, leading-in arrangement, jointing of pigtails and other related activity for construction of ADSS/Aerial OFC routes |
| 14 | LAYING OF PLB UPTO 50mm DIAMETER AND JOINING WITH COUPLER (PLB to be supplied by BSNL) Pushing/Pulling of PLB Pipe through NHAI laid \\"300 mm dia. telecom utility duct\\" including carriage/ transportation, uncoiling of duct, opening /closing, dewatering & silt cleaning of Manholes/ Handholes/ RCC chambers with the use of man and machines and with proper protection & safety of PLB pipe (per metre) |
| 15 | OFC BLOWING (OF Cable & Accessories to be supplied by BSNL) Up to 48F Blowing of O.F. Cable, and allied works (viz., Replacing couplers and Back filling in case of Manholes, Sealing of PLB ends, refilling sand, Refixing RCC cover and backfilling in case of Joint chamber/ Manhole). No charges to be paid for opening of Manholes/Joint chambers (per metre) |
| 16 | DWC PIPE LAYING (DWC Pipe with accessories to be supplied by vendor) DWC/GI Pipe Laying & fixing with GI clamps (on bridge & culverts or external walls of building) as per specifications along with supply of G.I. clamps (4mm thickness, 25mm width) and all installation materials. Clamp spacing should be approx 1M to take care of the load (per metre) |
| 17 | BORING AND CC WORKS Providing CC protection ( 20x20 cm) in the ratio of 1:2:4 for encasing PLB Pipe / GI Pipe/DWC pipe in Roads, bridges, Crossings and Culverts and for low depth protection, or on wheel guard of bridge as specified in the construction practices of OF cable construction, including material. (per metre) |
| 18 | ROUTE/JOINT INDICATOR Supplying, fixing and concreting of routes/joint indicator, painting and sign writing of Route/Joint Indicators, as per specification. (per count) |
| 19 | CABLE SPLICING/TERMINATION WORKS Splicing of all the fibers of OF cable laid at every joint within specified splicing loss range (<= 0.02 dB) and making termination at the ends. All materials and labours except Joint Closure to be supplied by Bidder/Vendor. For 24 fibres (per count) |
| 20 | Documentation of Route Index Diagram in Soft and hard copies (Three sets of each) and Recovery of Empty drum Documentation of Route Index Diagram in Soft and hard copies ( Three sets of each) Including OH Cable laid (per Km) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender