Defence Statutory Bodies & Commissions/Committees Closing in 0 days TDR #56940926

Tender For Repairs/Maintenance Of Overhead (Oh) Lines And Ug Cables, Including Routine, Preventive And Breakdown Maintenance Of Transformers, Ab Switches, Lightning Arresters (Las), Earthing Systems And All Associated Allied Electrical Works Certain

Issued by Statutory Bodies & Commissions/Committees · Hyderabad, Telangana
Tender Value
15 Lakhs
Estimated cost
Bid Submission
24 Aug 2026
0 days left
EMD
30000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Hyderabad → Telangana
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Repairs/Maintenance Of Overhead (Oh) Lines And Ug Cables, Including Routine, Preventive And Breakdown Maintenance Of Transformers, Ab Switches, Lightning Arresters (Las), Earthing Systems And All Associated Allied Electrical Works Certain Units Under Ge(U) Secunderabad.

BOQ

Name of Work:- REPAIRS/MAINTENANCE OF OVERHEAD (OH) LINES AND UG CABLES, INCLUDING ROUTINE, PREVENTIVE AND BREAKDOWN MAINTENANCE OF TRANSFORMERS, AB SWITCHES, LIGHTNING ARRESTERS (LAS), EARTHING SYSTEMS AND ALL ASSOCIATED ALLIED ELECTRICAL WORKS CERTAIN UNITS UNDER GE(U) SECUNDERABAD.
Sl. No. Item Description
1M&L for Spray painting of upto 250 KVA transformer pole mounted / plinth mounted at site and applying two coat of synthetic enameled Smoke grey paint after removing all dust & rust and paint shall confirm to IS 2032 including marking of transformer capacity with stencil letter with black or white paint and Font and Size of letter shall be as directed by Engr-in-Charge, complete all as specified and directed.
2M&L for cleaning/Painting of 4 pole structure /2 Pole structure/single Pole structure of any type/size/length and removing existing painting by using wire brush using with emery paper and cleaning with chemical agents, after cleaning the poles two coats of red oxide primer and two coats of synthetic aluminium painting shall be applied satisfactorily and Painting work carryout at any height and including marking of pole numbers as directed and safety eqpts & tools will be own arrangement of contractor and marking and colour washing of pole coping all as specified and directed of the following:-
3Two poles structure with cross Arms
4Four Poles structure with cross Arms
5Single HT 11mtr Pole with cross Arms
6M&L for Disconnection of all Primary/Secondary connections of the defective transformer rating up to 250 kVA out door / indoor type, any make, taking down / out from plinth / pole / platform with the help of suitable crane and transporting the same carefully to workshop for repair and bringing back and test, install & commissioning in its original existing position by making all neccessary connections complete all as directed.
7M&L for Opening top cover of transformer taking out complete oil and keeping in clean and dry container, taking out core & winding from the body,remove the sludge from tank complete and segregation of HT/LT coil from transformer including job assembling of jointing the connections of HT/LT coil in core assembling complete insulation works, setting of core, making new connections (as per existing connections), proper alignment of job including keeping in oven chamber of as per IS Specification of respective transformer capacity for remove the moisture as well as fixing of upper yoke lamination, checking, tightening, nuts, bolts, washers and all types of gasket ( Bushing and tank) etc and welding if any leakage found in body or fins, making good dificient item if any, testing the jobs with megger for proper results including two coats of anti corrosive paint after cleaning inside transformer tanks and two coats of outside painting including writing KVA Capacity, repairs of body by means of welding, jointing if required complete for capacity up to 250 KVA with complete Testing and Commissioning all as directed.
8M&L in repairs for Making Primery/secondary coil with High conductivity Electrolytic copper wire of required gauge as per specification of old existing transformer including making of coil as required of various capacity of transformer complete all as directed.
9M&L for Reconditioning of over heated HT/ LT coil of transformer up to 250 KVA after removing all old insulation any type and re-insulation with insulated craft paper cotton tape Class 'F' insulation as required complete all as directed.
10Supply and filling in replacement of transformer oil as per IS :335 with 60KV di-electric strength complete in transformer plinth / pole mounted including testing insulation and vescocity of oil all as specified and directed Make : Power Oil, HP Transformer Oil, Servo Electric. Please Enable Macros to View BoQ information
11Supply and filling in replacement of transformer oil as per IS :335 with 60KV di-electric strength complete in transformer plinth / pole mounted including testing insulation and vescocity of oil all as specified and directed Make : Power Oil, HP Transformer Oil, Servo Electric. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56940926
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 15 Lakhs
LAST DATE 24-08-2026
Authority
Authority Name Military Engineer Services
Work Description Tender for Repairs/Maintenance Of Overhead (Oh) Lines And Ug Cables, Including Routine, Preventive And Breakdown Maintenance Of Transformers, Ab Switches, Lightning Arresters (Las), Earthing Systems And All Associated Allied Electrical Works Certain Units Under Ge(U) Secunderabad.
Basic Detail
Tender No 86326
Bidding Type Tender
Location
City Hyderabad
State Telangana
Key Dates
Publish Date 10 Aug 2026
Submission Date 24 Aug 2026
Open Date 31 Aug 2026
Finance
Tender Value 15 Lakhs
Tender Fee 500
EMD 30000
Exemption Available
Document List
BOQ_877992.xls
e77bd749-5d85-4d9b-aca6-22edd495dc53.html
Tender86326.pdf
Tendernotice_1 (7).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 10, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 24, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Today
Aug 31, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 7 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_877992.xls

html

e77bd749-5d85-4d9b-aca6-22edd495dc53.html

pdf

Tender86326.pdf

pdf

Tendernotice_1 (7).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders