Road Transport and Highways Government Departments Closing in 1 days TDR #56939232

Tender For Construction Of Bailey Bridge Over Kithu River Between Thakiye Village (Zunheboto) And Shishimi (Kiphire) Under Setu Bandhan Of Crif Scheme.

Issued by Government Departments · Zunheboto, Nagaland
Tender Value
Ref. Documents
Estimated cost
Bid Submission
18 Aug 2026
1 days left
EMD
4.31 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Zunheboto → Nagaland
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Construction Of Bailey Bridge Over Kithu River Between Thakiye Village (Zunheboto) And Shishimi (Kiphire) Under Setu Bandhan Of Crif Scheme.

BOQ

Name of Work:- Construction of Bailey Bridge over Kithu river between Thakiye village (Zunheboto) and Shishimi (Kiphire) under Setu Bandhan of CRIF Scheme.
Sl. No. Item Description
1Foundation
2Excavation for structure: Earth in excavation of foundation for structure as per the drawing & technical specifications including setting out, construction of shoring and dressing, removal of stamps and deletrious matter, dressing of sides and bottom and back filling with approved material. B(ii) depth upto 3m
3Random Rubble Masonry: Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per drawing and specifications. (Soling)
4PCC 1:3:6 in Foundation: Plain Cement Concrete 1:3:6 nominal mixed in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curring for 14 days.
5RCC Grade M30 using batching plant and manual placing: Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification.
6Supply, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing & Technical specifications.
7Sub-structure
8PCC 1:3:6 in Foundation: Plain Cement Concrete 1:3:6 nominal mixed in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curring for 14 days.
9RCC Grade M20: Plain/Reinforced cement concrete in substructure complete as per drawing & technical specification. RCC M30 grade using batching plant transit mixer and concrete pump height upto 5m to 10m.
10Random Rubble Masonry: Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per drawing and specifications.
11Supply, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing & specifications.
12Providing weep holes in brick masonry / plain / reinforced concrete abutment wing wall/ return wall with 100mm dia AC pipe. Extending through the full width of the structure withslope of 1V:20H towards drawing force. Complete as per drawing and technical specification.
13Back filling behind Abutment, wing wall and return wall complete as per drawing and technical specification: A - Granular material.
14Providing & laying of filter media with granular material/stone crushed aggregates. Satisfying the requirements laid down in clause 2504.2.2 of MoRTH specifications to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and providd over the entire surface behind abutment, wingwall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.
15Superstructure
16Furnishing and placing Reinforced cement concrete in superstructure as per drawing and technical specification. Height 5m to 10m: RCC M30 Grade.
17Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing & Technical specifications.
18Formwork
19Centering and Shuttering including strutting, Propping etc. and removal of form using steel sections: Columns, pillars, piers, abutments, posts & struts.
20Extra for additional height in centering, shuttering where ever required with adequate bracing, propping etc. including cost of de-shuttering and decentering at all levels, over a height of 3.5m, for every additional height of 1 metre or part thereof (Plan area to be measured).
21River Training & Protection Works
22Providing and laying flooring complete as per drawing and Technical specification laid over cement concrete bedding. A- Rubble stone laid in cement mortar 1:3.
23Providing a gabian structure for erosion control, river training works and protection works with wire crates size 2mx1mx0.3m each divided into 1m compartment by cross netting,made from 4mm galvinized steel wire @32kg/10 sqm having minimum tensile strength of 300mpa conforming to IS:280 and galvinishing coating conforming to IS:4826, woven into mesh with double twist mesh size not exceeding 100mmx100mm, filled with bouldres with least dimension of 200mm, all loose end to be securedly tied with 4mm galvinised steel wire.
24Road works
25Excavation in Soil using Hydraulic Excavator and tippers with disposal upto 10000 metres. (Excavation for roadwork in soil with Hydralic excavator including cutting and loading in tippers, trimming bottom and side slopes in ccordance with requirements of lines grades and crossection, and transporting to the embankment location within all leaves and leads upto 1000 metres
26Excavation in Ordinary Rock using Hydraulic Excavator and tippers with disposal upto 10000 metres. (Excavation for roadwork in ordinary rock with Hydralic excavator including cutting and loading in tippers, trimming bottom and side slopes in ccordance with requirements of lines, grades and cross-section, and transporting to the embankment location within all leaves and leads upto 1000 metres
27Granular Sub-base with graded material: (Construction of granular sub-base by providing granular material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory power roller to achieve the desired density, complete as per clause 401)
28Water Bound Macadam: (Providing, laying and spreading and compacting graded stone aggregate to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of course aggregate, watering and compacting to required density.
29Grading - II, Using screening Type-A (13.2mm agg.)
30Grading - III, Using screening Type-B (11.2mm agg.)
31Prime Coat: providing and applying primer coat with cutback MC 30 bitumen emulsion on prepared surface of granular base including clearing of roads surface and spraying primer at the rate of 0.60kg/sqm using mechanical means.
32Tack Coat: Providing and applying tack coat with bitumen emulsion using pressure distributor @ 0.25kg per sqm on prepared bituminous surface cleaned with mechanical broom.
33Open Graded Premix Surfacing: (Providing, laying and rolling of open-graded premix surfacing of 20mm thickness composed of 13.2 mm to 5.6 mm aggregates using viscocity grade bitumin to to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable hot mix plant of appropriate capacity not less than 200 tonnes/hour laying and rolling with a smooth wheeled roller finished to required level and grades.
34Seal Coat: (Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using type A
35Construction of unlined surface drain of average cross sectional area 0.4 sqm in ordinary rock to specified lines, grades, levels and dimensions to the requirement of clause 301 to 309. Excavated material to be used in embankment within a lead of 1000m), by Mechanical means.
36Cross Drainage (HP Culverts)
37Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides)
38PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
39Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications- Coursed rubble masonry (first sort)
40PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
41Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications. Coursed rubble masonry (1st sort) in Parapet
42Laying Reinforced Cement Concrete Pipe NP4/prestrssed concrete pipe on first class bedding in single row. (Laying Reinforced cement concrete pipe NP4/prestrssed concrete pipe for culverts on first class bedding of granular material in single row)
43Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification
44Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides)
45PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
46Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification
47Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides)
48Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing and technical specifications
49Cost of 21.34m span Bailey Bridge (including supply, erection & transportation) Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56939232
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 18-08-2026
Authority
Authority Name Ministry Of Road Transport And Highways
Work Description Tender for Construction Of Bailey Bridge Over Kithu River Between Thakiye Village (Zunheboto) And Shishimi (Kiphire) Under Setu Bandhan Of Crif Scheme.
Basic Detail
Tender No CE(RnB)/SETU/KITHU/2025-26/06
Bidding Type Tender
Location
City Zunheboto
State Nagaland
Key Dates
Publish Date 10 Aug 2026
Submission Date 18 Aug 2026
Open Date 19 Aug 2026
Finance
Tender Value Ref. Documents
Tender Fee 10000
EMD 4.31 Lakhs
Exemption Not Available
Document List
BOQ_968309.xls
DesignDrawings.rar
e43c01ef-2d61-446d-b8e0-97219bb95915.html
SBDkithu.pdf
Tendernotice_1 (7).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 10, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 18, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 1 day
Aug 19, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 2 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_968309.xls

rar

DesignDrawings.rar

html

e43c01ef-2d61-446d-b8e0-97219bb95915.html

pdf

SBDkithu.pdf

pdf

Tendernotice_1 (7).pdf