Tender For Construction And Maintenance Of Bridges :-1.Hl Reinforced Cement Concrete Bridge Over Local River At Ch 0+100 Of Bara Rakso Pwd Road Kadma School To Bade Tola (Length 40.64M) (Block - Borio)2.Hl Reinforced Cement Concrete Bridge Over Local

Issued by Government Departments · Sahebganj, Jharkhand
Tender Value
9.10 Crore
Estimated cost
Bid Submission
25 Aug 2026
2 days left
EMD
19 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Sahebganj → Jharkhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Construction And Maintenance Of Bridges :-1.Hl Reinforced Cement Concrete Bridge Over Local River At Ch 0+100 Of Bara Rakso Pwd Road Kadma School To Bade Tola (Length 40.64M) (Block - Borio)2.Hl Reinforced Cement Concrete Bridge Over Local River At Ch 0+825 Of Birbal Kandar Anganbadi Center To Birbal Kandar (Length 40.64M) (Block - Borio) 3.Hl Reinforced Cement Concrete Bridge Over Local River At Ch 0+058 Of Pwd Road Chatra Dhogora To Dalebari (Length 20.64M) (Block - Borio)4.Hl Reinforced Cement Concrete Bridge Over Sindur Jharna River At Ch 2+610 Of Pwd Road Dumaria To Dumaria Bandar Tola (Length 40.64M) (Block - Borio)

BOQ

Name of Work:- Construction and Maintenance of Bridges :-1.HL RCC Bridge over Local River at CH 0+100 of Bara rakso pwd road kadma school to Bade tola (Length 40.64M) (Block - Borio)2.HL RCC Bridge over Local River at CH 0+825 of Birbal kandar anganbadi center to Birbal kandar (Length 40.64M) (Block - Borio) 3.HL RCC Bridge over Local River at CH 0+058 of PWD Road Chatra Dhogora to Dalebari (Length 20.64m) (Block - Borio)4.HL RCC Bridge over Sindur Jharna River at CH 2+610 of Pwd road Dumaria to Dumaria bandar tola (Length 40.64m) (Block - Borio)
Sl. No. Item Description
11.HL RCC Bridge over Local River at CH 0+100 of Bara rakso pwd road kadma school to Bade tola (Length 40.64M) (Block - Borio)
2APPROACH ROAD-------Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I
3Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
4Construction of embankment with approved material deposited at site and obtained from road way cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5
5Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 250m as per Technical Specification Clause 301.5
6Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.
7Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.
8Granular Sub-base with Well Graded Material (Table 400.1): Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader / Tractor mount grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. For Grading II*Material
9Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
10Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
11Prime coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
12Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.3 kg per sqm on the prepared granular surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
13Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects.
14Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1
15Citizan Information Board
16FOUNDATION-----------Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. - - - - i) Upto 3m depth
17ii) 3m to 6m depth
18II) Hard Rock
19Filling annular space around footing in rock as per technical specification Clause 1203.4.3.
20Reinforced Cement Concrete (RCC M30) in Open Foundation complete as per Drawing and Technical Specifications.
21Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
22Confiermatory Boring
23SUBSTRUCTURE----------Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 (RCC M30)---i) Upto 5m height
24ii) From 5m upto 10m height
25Supplying, fitting and placing HYSD bar reinforcement (Fe 500) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
26Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC:83 (Part-II) Section IX complete, including all accessories as per drawings and technical specification Clause 1207.1
27Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
28Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
29Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8
30SUPERSTRUCTURE----------Providing and laying reinforced cement concrete in superstructure complete as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5
31Supplying, fitting, and placing HYSD bar reinforcement (Fe 500) in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
32Providing and laying cement concrete wearing course M30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3
33Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3
34Drainage Spouts complete as per drawing and technical specifications Clause 1209
35P.C.C. M-15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specificatios Clauses 800 & 1211.
36Reinforced Cement Concrete M-25 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211
37Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.
38White Washing of Parapet WallsWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning, scapping, etc. as pre technical specification Clause 1915
39PROTECTION WORK----------Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302
40Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302
41Construction of toe walls for protection of slopes as per drawing and technical specifications Clause 1302.5
421st Year Maintenance
432nd Year Maintenance
443rd Year Maintenance
454th Year Maintenance
465th Year Maintenance
472.HL RCC Bridge over Local River at CH 0+825 of Birbal kandar anganbadi center to Birbal kandar (Length 40.64M) (Block - Borio)-----------APPROACH ROAD-------Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I
48Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 250m as per Technical Specification Clause 301.5
49Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.
50Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.
51Granular Sub-base with Well Graded Material (Table 400.1): Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader / Tractor mount grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. For Grading II*Material
52Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
53Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
54Prime coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
55Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.3 kg per sqm on the prepared granular surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
56Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects.
57Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1
58Citizan Information Board
59FOUNDATION-----------Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. - - - - i) Upto 3m depth
60ii) 3m to 6m depth
61II) Hard Rock
62Filling annular space around footing in rock as per technical specification Clause 1203.4.3.
63Reinforced Cement Concrete (RCC M30) in Open Foundation complete as per Drawing and Technical Specifications.
64Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
65Confiermatory Boring
66SUBSTRUCTURE----------Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 (RCC M30)---i) Upto 5m height
67ii) From 5m upto 10m height
68Supplying, fitting and placing HYSD bar reinforcement (Fe 500) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
69Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC:83 (Part-II) Section IX complete, including all accessories as per drawings and technical specification Clause 1207.1
70Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
71Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
72Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8
73SUPERSTRUCTURE----------Providing and laying reinforced cement concrete in superstructure complete as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5
74Supplying, fitting, and placing HYSD bar reinforcement (Fe 500) in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
75Providing and laying cement concrete wearing course M30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3
76Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3
77Drainage Spouts complete as per drawing and technical specifications Clause 1209
78P.C.C. M-15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specificatios Clauses 800 & 1211.
79Reinforced Cement Concrete M-25 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211
80Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.
81White Washing of Parapet WallsWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning, scapping, etc. as pre technical specification Clause 1915
82PROTECTION WORK----------Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302
83Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302
84Construction of toe walls for protection of slopes as per drawing and technical specifications Clause 1302.5
851st Year Maintenance
862nd Year Maintenance
873rd Year Maintenance
884th Year Maintenance
895th Year Maintenance
903.HL RCC Bridge over Local River at CH 0+058 of PWD Road Chatra Dhogora to Dalebari (Length 20.64m) (Block - Borio)---------APPROACH ROAD-------Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I
91Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
92Construction of embankment with approved material deposited at site and obtained from road way cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5
93Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 250m as per Technical Specification Clause 301.5
94Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.
95Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.
96Granular Sub-base with Well Graded Material (Table 400.1): Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader / Tractor mount grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. For Grading II*Material
97Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
98Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
99Prime coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
100Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.3 kg per sqm on the prepared granular surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
101Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects.
102Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1
103Citizan Information Board
104FOUNDATION-----------Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. - - - - i) Upto 3m depth
105ii) 3m to 6m depth
106II) Hard Rock
107Filling annular space around footing in rock as per technical specification Clause 1203.4.3.
108Reinforced Cement Concrete (RCC M30) in Open Foundation complete as per Drawing and Technical Specifications.
109Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
110Confiermatory Boring
111SUBSTRUCTURE----------Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 (RCC M30)---i) Upto 5m height
112ii) From 5m upto 10m height
113Supplying, fitting and placing HYSD bar reinforcement (Fe 500) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
114Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC:83 (Part-II) Section IX complete, including all accessories as per drawings and technical specification Clause 1207.1
115Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
116Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
117Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8
118SUPERSTRUCTURE----------Providing and laying reinforced cement concrete in superstructure complete as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5
119Supplying, fitting, and placing HYSD bar reinforcement (Fe 500) in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
120Providing and laying cement concrete wearing course M30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3
121Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3
122Drainage Spouts complete as per drawing and technical specifications Clause 1209
123P.C.C. M-15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specificatios Clauses 800 & 1211.
124Reinforced Cement Concrete M-25 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211
125Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.
126White Washing of Parapet WallsWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning, scapping, etc. as pre technical specification Clause 1915
127PROTECTION WORK----------Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302
128Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302
129Construction of toe walls for protection of slopes as per drawing and technical specifications Clause 1302.5
1301st Year Maintenance
1312nd Year Maintenance
1323rd Year Maintenance
1334th Year Maintenance
1345th Year Maintenance
1354.HL RCC Bridge over Sindur Jharna River at CH 2+610 of Pwd road Dumaria to Dumaria bandar tola (Length 40.64m) (Block - Borio)--------APPROACH ROAD-------Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I
136Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 250m as per Technical Specification Clause 301.5
137Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.
138Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.
139Granular Sub-base with Well Graded Material (Table 400.1): Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader / Tractor mount grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. For Grading II*Material
140Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
141Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
142Prime coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
143Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.3 kg per sqm on the prepared granular surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
144Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects.
145Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1
146Citizan Information Board
147FOUNDATION-----------Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. - - - - i) Upto 3m depth
148ii) 3m to 6m depth
149II) Hard Rock
150Filling annular space around footing in rock as per technical specification Clause 1203.4.3.
151Reinforced Cement Concrete (RCC M30) in Open Foundation complete as per Drawing and Technical Specifications.
152Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
153Confiermatory Boring
154SUBSTRUCTURE----------Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 (RCC M30)---i) Upto 5m height
155ii) From 5m upto 10m height
156Supplying, fitting and placing HYSD bar reinforcement (Fe 500) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
157Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC:83 (Part-II) Section IX complete, including all accessories as per drawings and technical specification Clause 1207.1
158Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
159Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
160Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8
161SUPERSTRUCTURE----------Providing and laying reinforced cement concrete in superstructure complete as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5
162Supplying, fitting, and placing HYSD bar reinforcement (Fe 500) in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
163Providing and laying cement concrete wearing course M30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3
164Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3
165Drainage Spouts complete as per drawing and technical specifications Clause 1209
166P.C.C. M-15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specificatios Clauses 800 & 1211.
167Reinforced Cement Concrete M-25 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211
168Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.
169White Washing of Parapet WallsWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning, scapping, etc. as pre technical specification Clause 1915
170PROTECTION WORK----------Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302
171Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302
172Construction of toe walls for protection of slopes as per drawing and technical specifications Clause 1302.5
1731st Year Maintenance
1742nd Year Maintenance
1753rd Year Maintenance
1764th Year Maintenance
1775th Year Maintenance
178GST @ 18%
179Labour Cess @ 1% Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56936479
AUTHORITY Government Departments
TENDER VALUE 9.10 Crore
LAST DATE 25-08-2026
Authority
Authority Name Jharkhand State Rural Road Development Authority
Work Description Tender for Construction And Maintenance Of Bridges :-1.Hl Reinforced Cement Concrete Bridge Over Local River At Ch 0+100 Of Bara Rakso Pwd Road Kadma School To Bade Tola (Length 40.64M) (Block - Borio)2.Hl Reinforced Cement Concrete Bridge Over Local River At Ch 0+825 Of Birbal Kandar Anganbadi Center To Birbal Kandar (Length 40.64M) (Block - Borio) 3.Hl Reinforced Cement Concrete Bridge Over Local River At Ch 0+058 Of Pwd Road Chatra Dhogora To Dalebari (Length 20.64M) (Block - Borio)4.Hl Reinforced Cement Concrete Bridge Over Sindur Jharna River At Ch 2+610 Of Pwd Road Dumaria To Dumaria Bandar Tola (Length 40.64M) (Block - Borio)
Basic Detail
Tender No JH-19-PMJANMAN-III-BR-SBJ-02
Bidding Type Tender
Location
City Sahebganj
State Jharkhand
Key Dates
Publish Date 11 Aug 2026
Submission Date 25 Aug 2026
Open Date 25 Aug 2026
Finance
Tender Value 9.10 Crore
Tender Fee 10000
EMD 19 Lakhs
Exemption Not Available
Document List
93d6fa9b-c078-4ab7-adf9-0d8c6cc45411.html
BOQ_234374.xls
JH-19-PMJANMAN-III-BR-SBJ_1.pdf
Tendernotice_1 (7).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 11, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 25, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 2 days
Aug 25, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 2 days

Tender Documents

Download All (ZIP) ↓
html

93d6fa9b-c078-4ab7-adf9-0d8c6cc45411.html

xls

BOQ_234374.xls

pdf

JH-19-PMJANMAN-III-BR-SBJ_1.pdf

pdf

Tendernotice_1 (7).pdf