Tender For Onam 2026- Civil Works At Bhatt Road Beach Kozhikode
Tender Value
Ref. Documents
Estimated cost
Bid Submission
18 Aug 2026
0 days left
EMD
10000
Bank guarantee accepted
Document Fee
2800
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kozhikode → Kerala
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Onam 2026- Civil Works At Bhatt Road Beach Kozhikode
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 17-Aug-2026 | TIME EXTENSION | Date | 18-Aug-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | STAGE 40ft x 30ft |
| 2 | DAY 1-STAGE 40ft x 30ftHire and labour for providing platform 1.5m height including steps with hand rails for climbing from two sides. strcuture made with 40 mm MS pipe truss work with both lines and tying with MS pipe and top covering with 18 mm thick plywood and overlaying carpet etc, as per directions. including all cost of erecting , conveyance and dismantling after function. |
| 3 | DAY 2-STAGE 40ft x 30ftHire and labour for providing platform 1.5m height including steps with hand rails for climbing from two sides. strcuture made with 40 mm MS pipe truss work with both lines and tying with MS pipe and top covering with 18 mm thick plywood and overlaying carpet etc, as per directions. including all cost of erecting , conveyance and dismantling after function. |
| 4 | DAY 3-STAGE 40ft x 30ftHire and labour for providing platform 1.5m height including steps with hand rails for climbing from two sides. strcuture made with 40 mm MS pipe truss work with both lines and tying with MS pipe and top covering with 18 mm thick plywood and overlaying carpet etc, as per directions. including all cost of erecting , conveyance and dismantling after function. |
| 5 | DAY 4-STAGE 40ft x 30ftHire and labour for providing platform 1.5m height including steps with hand rails for climbing from two sides. strcuture made with 40 mm MS pipe truss work with both lines and tying with MS pipe and top covering with 18 mm thick plywood and overlaying carpet etc, as per directions. including all cost of erecting , conveyance and dismantling after function. |
| 6 | DAY 5-STAGE 40ft x 30ftHire and labour for providing platform 1.5m height including steps with hand rails for climbing from two sides. strcuture made with 40 mm MS pipe truss work with both lines and tying with MS pipe and top covering with 18 mm thick plywood and overlaying carpet etc, as per directions. including all cost of erecting , conveyance and dismantling after function. |
| 7 | CANOPY TENT- |
| 8 | DAY 1-CANOPY TENT- Hire and labour for providing and errecting hipped panthal white coloured for pavilions, stalls and counters as and where required to cover audience including all hire charges etc. complete |
| 9 | DAY 2-CANOPY TENT- Hire and labour for providing and errecting hipped panthal white coloured for pavilions, stalls and counters as and where required to cover audience including all hire charges etc. complete |
| 10 | DAY 3-CANOPY TENT- Hire and labour for providing and errecting hipped panthal white coloured for pavilions, stalls and counters as and where required to cover audience including all hire charges etc. complete |
| 11 | DAY 4-CANOPY TENT- Hire and labour for providing and errecting hipped panthal white coloured for pavilions, stalls and counters as and where required to cover audience including all hire charges etc. complete |
| 12 | DAY 5-CANOPY TENT- Hire and labour for providing and errecting hipped panthal white coloured for pavilions, stalls and counters as and where required to cover audience including all hire charges etc. complete |
| 13 | TARPOLINE PANTHAL |
| 14 | DAY 1-TARPOLINE PANTHALProviding tarpoline panthal with sides covered, up to 6m height in required size etc, for security and service persons including all hire charges etc. complete |
| 15 | DAY 2-TARPOLINE PANTHALProviding tarpoline panthal with sides covered, up to 6m height in required size etc, for security and service persons including all hire charges etc. complete |
| 16 | DAY 3-TARPOLINE PANTHALProviding tarpoline panthal with sides covered, up to 6m height in required size etc, for security and service persons including all hire charges etc. complete |
| 17 | DAY 4-TARPOLINE PANTHALProviding tarpoline panthal with sides covered, up to 6m height in required size etc, for security and service persons including all hire charges etc. complete |
| 18 | DAY 5-TARPOLINE PANTHALProviding tarpoline panthal with sides covered, up to 6m height in required size etc, for security and service persons including all hire charges etc. complete |
| 19 | PLATFORM |
| 20 | DAY 1-PLATFORM Hire and labour for providing platform with 40 mm MS pipe truss work with both lines and tying with MS pipe and top covering with 18 mm thick plywood with MS square pipe etc. as per the directions ofdepartmental officers in charge including all cost of erecting , conveyance and dismantling after function. |
| 21 | DAY 2-PLATFORM Hire and labour for providing platform with 40 mm MS pipe truss work with both lines and tying with MS pipe and top covering with 18 mm thick plywood with MS square pipe etc. as per the directions ofdepartmental officers in charge including all cost of erecting , conveyance and dismantling after function. |
| 22 | DAY 3-PLATFORM Hire and labour for providing platform with 40 mm MS pipe truss work with both lines and tying with MS pipe and top covering with 18 mm thick plywood with MS square pipe etc. as per the directions ofdepartmental officers in charge including all cost of erecting , conveyance and dismantling after function. |
| 23 | DAY 4-PLATFORM Hire and labour for providing platform with 40 mm MS pipe truss work with both lines and tying with MS pipe and top covering with 18 mm thick plywood with MS square pipe etc. as per the directions ofdepartmental officers in charge including all cost of erecting , conveyance and dismantling after function. |
| 24 | DAY 5-PLATFORM Hire and labour for providing platform with 40 mm MS pipe truss work with both lines and tying with MS pipe and top covering with 18 mm thick plywood with MS square pipe etc. as per the directions ofdepartmental officers in charge including all cost of erecting , conveyance and dismantling after function. |
| 25 | Stage frontage Carpet |
| 26 | DAY 1-Stage frontage Carpet Hire & labour charge for laying good quality floor mat in the stage including all labour charges etc. complete |
| 27 | DAY 2-Stage frontage Carpet Hire & labour charge for laying good quality floor mat in the stage including all labour charges etc. complete |
| 28 | DAY 3-Stage frontage Carpet Hire & labour charge for laying good quality floor mat in the stage including all labour charges etc. complete |
| 29 | DAY 4-Stage frontage Carpet Hire & labour charge for laying good quality floor mat in the stage including all labour charges etc. complete |
| 30 | DAY 5-Stage frontage Carpet Hire & labour charge for laying good quality floor mat in the stage including all labour charges etc. complete |
| 31 | Metal Barricade |
| 32 | DAY 1-Metal Barricade Supplying and fixing barricade as per direction with steel including all labour charges conveyance hire charges etc complete |
| 33 | DAY 2-Metal Barricade Supplying and fixing barricade as per direction with steel including all labour charges conveyance hire charges etc complete |
| 34 | DAY 3-Metal Barricade Supplying and fixing barricade as per direction with steel including all labour charges conveyance hire charges etc complete |
| 35 | DAY 4-Metal Barricade Supplying and fixing barricade as per direction with steel including all labour charges conveyance hire charges etc complete |
| 36 | DAY 5-Metal Barricade Supplying and fixing barricade as per direction with steel including all labour charges conveyance hire charges etc complete |
| 37 | Chair Armless |
| 38 | DAY 1-Chair Armless Supplying and placing as per direction, plastic chair including all hire and labour charges for replacing the chair after use. |
| 39 | DAY 2-Chair Armless Supplying and placing as per direction, plastic chair including all hire and labour charges for replacing the chair after use. |
| 40 | DAY 3-Chair Armless Supplying and placing as per direction, plastic chair including all hire and labour charges for replacing the chair after use. |
| 41 | DAY 4-Chair Armless Supplying and placing as per direction, plastic chair including all hire and labour charges for replacing the chair after use. |
| 42 | DAY 5-Chair Armless Supplying and placing as per direction, plastic chair including all hire and labour charges for replacing the chair after use. |
| 43 | VIP Chair |
| 44 | DAY 1-VIP ChairSupplying and placing as per direction ,VIP chair including all hire and labour charges |
| 45 | DAY 2-VIP ChairSupplying and placing as per direction ,VIP chair including all hire and labour charges |
| 46 | DAY 3-VIP ChairSupplying and placing as per direction ,VIP chair including all hire and labour charges |
| 47 | DAY 4-VIP ChairSupplying and placing as per direction ,VIP chair including all hire and labour charges |
| 48 | DAY 5-VIP ChairSupplying and placing as per direction ,VIP chair including all hire and labour charges |
| 49 | Table |
| 50 | DAY 1-Table Supplying and placing as per direction, table with metal frame and plywood top including all hire and labour charges |
| 51 | DAY 2-Table Supplying and placing as per direction, table with metal frame and plywood top including all hire and labour charges |
| 52 | DAY 3-Table Supplying and placing as per direction, table with metal frame and plywood top including all hire and labour charges |
| 53 | DAY 4-Table Supplying and placing as per direction, table with metal frame and plywood top including all hire and labour charges |
| 54 | DAY 5-Table Supplying and placing as per direction, table with metal frame and plywood top including all hire and labour charges |
| 55 | Teapoy |
| 56 | DAY 1-Teapoy Supplying and placing as per direction, Teapoy table with wood including all hire and labour charges |
| 57 | DAY 2-Teapoy Supplying and placing as per direction, Teapoy table with wood including all hire and labour charges |
| 58 | DAY 3-Teapoy Supplying and placing as per direction, Teapoy table with wood including all hire and labour charges |
| 59 | DAY 4-Teapoy Supplying and placing as per direction, Teapoy table with wood including all hire and labour charges |
| 60 | DAY 5-Teapoy Supplying and placing as per direction, Teapoy table with wood including all hire and labour charges |
| 61 | Podium |
| 62 | DAY 1-Podium Supplying and placing as per direction, Podium with wood /steel including all hire and labour charges |
| 63 | DAY 2-Podium Supplying and placing as per direction, Podium with wood /steel including all hire and labour charges |
| 64 | DAY 3-Podium Supplying and placing as per direction, Podium with wood /steel including all hire and labour charges |
| 65 | DAY 4-Podium Supplying and placing as per direction, Podium with wood /steel including all hire and labour charges |
| 66 | DAY 5-Podium Supplying and placing as per direction, Podium with wood /steel including all hire and labour charges |
| 67 | Nilavilakku with accessories |
| 68 | DAY 1-Nilavilakku with accessoriesSupplying and placing as per direction, Nilavilakku with accessories including all hire and labour charges |
| 69 | DAY 5-Nilavilakku with accessoriesSupplying and placing as per direction, Nilavilakku with accessories including all hire and labour charges |
| 70 | Curtain Covering |
| 71 | DAY 1-Curtain Covering Supplying and placing as per direction, including all hire and labour charges |
| 72 | DAY 2-Curtain Covering Supplying and placing as per direction, including all hire and labour charges |
| 73 | DAY 3-Curtain Covering Supplying and placing as per direction, including all hire and labour charges |
| 74 | DAY 4-Curtain Covering Supplying and placing as per direction, including all hire and labour charges |
| 75 | DAY 5-Curtain Covering Supplying and placing as per direction, including all hire and labour charges Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Aug 17, 2026
11:30 IST
Tender Published
Tender notice published.
Completed
Aug 18, 2026
18:00 IST
Corrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedAug 18, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedAug 19, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender