Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - 3X210 Mw Atps Anpara Sonebhadra Up; Re-Rubber Lining Of Cation Re-Generation Bed And Its Associated Flanges Pipelines; Service Provider - Neoprene R
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - 3X210 Mw Atps Anpara Sonebhadra Up; Re-Rubber Lining Of Cation Re-Generation Bed And Its Associated Flanges Pipelines; Service Provider - Neoprene Re-Rubber Lining Of Cation Re-Generation Bed & Its Cone, Distributor (One Set Of 6 Pieces) And Minor Fabrication/Repairing Work As Per Requirementof Bed. , Re-Rubber Lining Of Acid Storage Tank ‘A&‘B With Natural Rubber And Minor Fabrication/Repairing Work As Per Requirement Of Tank. , Laying 230X115x38/75Mm New Ist Class Acid/Alkali Resistant Bricks/Tiles As Per Is4860:1968 And Is 4457:1967 Along With Mastic Lining In 10Mm To 20Mm Thickness Including Removal Of Old Mastic Lining & Preparation Of Surface And Pointing With Edge Preparation, Cleaning, Washing Etc. Including All The Materials & Labour Cost Of Neutralizing Pit Chanel And Chemical Storage Area Of Dm Plant. , Mastic Lining In 10Mm To 20Mm Thickness (As Per Site Requirement) Including Removal Of Old Mastic Lining & Preparation Of Surface Etc. With Man And Material Cost) Neutralizing Pit Chanel And Chemical Storage Area Of Dm Plant. , Pointing With Edge Preparation, Cleaning, Washing Etc. Of Acid/Alkali Resistance Bricks/Tiles After Removing Of Old Bricks/Tiles, With All Materials & Labour Cost Neutralizing Pit Chanel And Chemical Storage Area Of Dm Plant. , Protective Coating Of Epoxy Paint Of Cation Regeneration Bed Along With Their Associated Pipelines And Acid Storage Tank ‘A &‘B After Removal Of Old Paint, Cleaning Of Rusted Surface.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Neoprene Re-rubber lining of Cation Re-generation Bed & it’s cone, distributor (One set of 6 pieces) and minor fabrication/repairing work as per requirementof Bed. | Neoprene Re-rubber lining of Cation Re-generation Bed & it’s cone, distributor (One set of 6 pieces) and minor fabrication/repairing work as per requirementof Bed. |
| 2 | Re-rubber lining of Acid Storage Tank ‘A’&‘B’ with natural rubber and minor fabrication/repairing work as per requirement of tank. | Re-rubber lining of Acid Storage Tank ‘A’&‘B’ with natural rubber and minor fabrication/repairing work as per requirement of tank. |
| 3 | Laying 230x115x38/75mm new Ist class Acid/Alkali resistant bricks/tiles as per IS4860:1968 and IS 4457:1967 along with Mastic lining in 10mm to 20mm thickness including removal of old mastic lining & preparation of surface and pointing with edge preparation, cleaning, washing etc. including all the materials & labour cost of Neutralizing Pit Chanel and chemical storage area of DM plant. | Laying 230x115x38/75mm new Ist class Acid/Alkali resistant bricks/tiles as per IS4860:1968 and IS 4457:1967 along with Mastic lining in 10mm to 20mm thickness including removal of old mastic lining & preparation of surface and pointing with edge preparation, cleaning, washing etc. including all the materials & labour cost of Neutralizing Pit Chanel and chemical storage area of DM plant. |
| 4 | Mastic lining in 10mm to 20mm thickness (as per site requirement) including removal of old mastic lining & preparation of surface etc. with man and material cost) Neutralizing Pit Chanel and chemical storage area of DM plant. | Mastic lining in 10mm to 20mm thickness (as per site requirement) including removal of old mastic lining & preparation of surface etc. with man and material cost) Neutralizing Pit Chanel and chemical storage area of DM plant. |
| 5 | Pointing with edge preparation, cleaning, washing etc. of acid/alkali resistance bricks/tiles after removing of old bricks/tiles, with all materials & labour cost Neutralizing Pit Chanel and chemical storage area of DM plant. | Pointing with edge preparation, cleaning, washing etc. of acid/alkali resistance bricks/tiles after removing of old bricks/tiles, with all materials & labour cost Neutralizing Pit Chanel and chemical storage area of DM plant. |
| 6 | Protective coating of Epoxy paint of cation regeneration bed along with their associated pipelines and Acid Storage Tank ‘A’ &‘B’ after removal of old paint, cleaning of rusted surface. | Protective coating of Epoxy paint of cation regeneration bed along with their associated pipelines and Acid Storage Tank ‘A’ &‘B’ after removal of old paint, cleaning of rusted surface. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 16 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 16 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender