Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard Ins Kalvari; Repairs And Overhauling Of Hp Air Valves And Reducers Of Charging Discharging Panel (Cdp) Of M/S Cff Onboard Ins Kalvari; Servi
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard Ins Kalvari; Repairs And Overhauling Of Hp Air Valves And Reducers Of Charging Discharging Panel (Cdp) Of M/S Cff Onboard Ins Kalvari; Service Provider - Services For Diving And Surface System - Inspection Of Ballast Tank 1 To 4 Locking Distributor (Db00091, Db00092, Db00093, Db00094) As Per Jic Db-03-D-001• Degutting Of Ballast Tank Distributor From Location• Shifting Of Ballast Tank Distributor From Location• Removal Of All Valves From Panel Of Distribution Panel• Cleaning Of Valves• Replacement Of All O-Rings Of Valves.• Fitment Of Valves To Panel• Pneumatic Testing Of All Valves At 250 Bar• Pneumatic Testing Of Ballast Tank Distributor At 250 Bar For 05 Minutes• Shifting Of Panel To Onboard & Fitment.• Trials Of Ballast. Tank Distributor Post Fitment In The System With The Boats Hp Air System , Services For Diving And Surface System - Inspection Of Press Solenoid Valve Db00131, Db00132, Db00133, Db00134 As Per Jic Db-11-D-001• Degutting Of Solenoid Valve From Location• Shifting Of Solenoid Valve From Location• Removal Of All Valves From Panel Of Distribution Panel• Cleaning Of Valves• Replacement Of All O-Rings Of Valves.• Fitment Of Valves To Panel• Pneumatic Testing Of All Valves At 250 Bar• Pneumatic Testing Of Solenoid Valves At 250 Bar For 05 Minutes• Shifting Of Valves To Onboard & Fitment.• Trials Of Solenoid Valves Post Fitment In The System With The Boats Hp Air System , Services For Diving And Surface System - Inspection Of Valve Db00011, Db00013, Db00061, Db00063 As Per Jic Db-10-D-001• Degutting Of Valves From Location• Shifting Of Valves From Location• Cleaning Of Valves• Replacement Of All O-Rings Of Valves.• Fitment Of Valves• Pneumatic Testing Of All Valves At 250 Bar• Pneumatic Testing Of Valves At 250 Bar For 05 Minutes• Shifting Of Valves To Onboard & Fitment.• Trials Of Solenoid Valves Post Fitment In The System With The Boats Hp Air System , Services For Normal Hp Air Blowing - Inspection Of Aft & Fwd Charging And Distribution Panel Dy01000, Dy02000 As Per Jic Dy – 09-D-001• Degutting Of Cdp Panel From Location• Shifting Of Cdp Panel From Location• Removal Of All Valves From Panel Of Charging Distribution, Drain• Cleaning Of Valves• Replacement Of All O-Rings Of Valves.• Fitment Of Valves To Panel• Pneumatic Testing Of All Valves At 250 Bar• Pneumatic Testing Of Cdp Panel At 250 Bar For 05 Minutes• Shifting Of Panel To Onboard & Fitment.• Trials Of Cdp Panel Post Fitment In The System With The Boats Hp Air System. , Services For Emergency Hp Air Blowing - Inspection Of (Dw02004) Discharge Control Switchboard Cross Connection Line As Per Jic Dw – 09-D-004• Degutting Of Cdp Panel From Location• Shifting Of Cdp Panel From Location• Removal Of All Valves From Panel Of Charging Distribution, Drain• Cleaning Of Valves• Replacement Of All O-Rings Of Valves.• Fitment Of Valves To Panel• Pneumatic Testing Of All Valves At 250 Bar• Pneumatic Testing Of Cdp Panel At 250 Bar For 05 Minutes• Shifting Of Panel To Onboard & Fitment.• Trials Of Cdp Panel Post Fitment In The System With The Boats Hp Air System. , Services For Emergency Hp Air Blowing -Inspection Of (Dw01200, Dw01300) Aft & Fwd Group Charging Panel As Per Jic Dw – 08-D-001• Degutting Of Cdp Panel From Location•Shifting Of Cdp Panel From Location•Removal Of All Valves From Panel Of Charging Distribution, Drain•Cleaning Of Valves•Replacement Of All O-Rings Of Valves.•Fitment Of Valves To Panel•Pneumatic Testing Of All Valves At 250 Bar•Pneumatic Testing Of Cdp Panel At 250 Bar For 05 Minutes•Shifting Of Panel To Onboard & Fitment.•Trials Of Cdp Panel Post Fitment In The System With The Boats Hp Air System. , Services For Emergency Hp Air Blowing - Inspection Of (Dw2000), Dw01300) Aft & Fwd Group Charging Panel As Per Jic Dw – 08-D-001• Degutting Of Cdp Panel From Location•Shifting Of Cdp Panel From Location•Removal Of All Valves From Panel Of Charging Distribution, Drain•Cleaning Of Valves•Replacement Of All O-Rings Of Valves.•Fitment Of Valves To Panel•Pneumatic Testing Of All Valves At 250 Bar•Pneumatic Testing Of Cdp Panel At 250 Bar For 05 Minutes•Shifting Of Panel To Onboard & Fitment.•Trials Of Cdp Panel Post Fitment In The System With The Boats Hp Air System , Services For Emergency Hp Air Blowing - Inspection Of Distribution Cross Connection Line Dy01041, Dy01042, Dy01043, Dy01044 As Per Jic Dy-09-D-004•Degutting Of Valves From Location Shifting Of Valves From Location•Cleaning Of Valves Replacement Of All O-Rings, Seats Of Valves.•Fitment Of Valves•Pneumatic Testing Of All Valves At 250 Bar•Pneumatic Testing Of Valves At 250 Bar For 05 Minutes•Shifting Of Valves To Onboard & Fitment.•Trials Of Valves Post Fitment In The System With The Boats Hp Air Systems. , Services For Emergency Hp Air Blowing - Inspection Of Nrv Dy00109, Dy00209, Dy00906 And Dy00912 As Per Jic Dy-09-D-008•Degutting Of Valves From Location•Shifting Of Valves From Location•Cleaning Of Valves•Replacement Of All O-Rings, Seats Of Valves.•Fitment Of Valves•Pneumatic Testing Of All Valves At 250 Bar•Pneumatic Testing Of Valves At 250 Bar For 05 Minutes•Shifting Of Valves To Onboard & Fitment.•Trials Of Valves Post Fitment In The System With The Boats Hp. Air System , Services For Emergency Hp Air Blowing - Inspection Of Distribution Cross Connection Line Dy01041, Dy01011, Dy02013, Dy02014 As Per Jic Dy-09-D-004•Degutting Of Valves From Location•Shifting Of Valves From Location•Cleaning Of Valves•Replacement Of All O-Rings, Seats Of Valves.•Fitment Of Valves.•Pneumatic Testing Of All Valves At 250 Bar•Pneumatic Testing Of Valves At 250 Bar For 05 Minutes•Shifting Of Valves To Onboard & Fitment.•Trials Of Valves Post Fitment In The System With The Boats Hp Air System , Services For Sea Water Circuit - Carryout Water Tightness Test Of The Nrv (Em00044) As Per Jic Em-04-D-010•Degutting Of Valves From Location•Shifting Of Valves From Location•Cleaning Of Valves•Replacement Of All O-Rings, Seats Of Valves.•Fitment Of Valve•Shifting Of Valve To Onboard & Fitment.•Hydraulic Trials Of Valve At 52 Bar Post Fitment In The System With The Boats Hp Air System. , Services For Sea Water Circuit - General Inspection Of Dm00033 Sea Chest Blow Valve As Per Jic Dm-19-D-002.•Degutting Of Valves From Location•Shifting Of Valves From Location•Cleaning Of Valves•Replacement Of All O-Rings, Seats Of Valves.•Fitment Of Valves•Pneumatic Testing Of All Valves At 250 Bar•Pneumatic Testing Of Valves At 250 Bar For 05 Minutes•Shifting Of Valves To Onboard & Fitment.•Trials Of Valves Post Fitment In The System With The Boats Hp Air System , Services For Sea Water Circuit - Inspection Of Nrv Em00009, Em00010 And Em00011 As Per Jic Em-04-D-006.•Degutting Of Valves From Location•Shifting Of Valves From Location•Cleaning Of Valves•Replacement Of All O-Rings, Seats Of Valves.•Fitment Of Valves•Pneumatic Testing Of All Valves At 250 Bar•Pneumatic Testing Of Valves At 250 Bar For 05 Minutes•Shifting Of Valves To Onboard & Fitment.•Trials Of Valves Post Fitment In The System With The Boats Hp Air System , Services For Sea Water Circuit - Carryout Water Tightness Test Of The Nrv (En00130) As Per Jic En-06-D-010•Degutting Of Valves From Location•Shifting Of Valves From Location•Cleaning Of Valves•Replacement Of All O-Rings, Seats Of Valves.•Fitment Of Valve Shifting Of Valve To Onboard & Fitment.•Hydraulic Trials Of Valve At 52 Bar Post Fitment In The System With The Boats Hp Air System , Services For Sea Water Circuit - Inspection Of Nrv Pump Discharge En00020 And En00021 As Per Jic En-06-D-005.•Degutting Of Valves From Location•Shifting Of Valves From Location•Cleaning Of Valves•Replacement Of All O-Rings, Seats Of Valves.•Fitment Of Valves•Pneumatic Testing Of All Valves At 250 Bar•Neumatic Testing Of Valves At 250 Bar For 05 Minutes•Shifting Of Valves To Onboard & Fitment.•Trials Of Valves Post Fitment In The System With The Boats Hp Air System
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Services for Diving and Surface System - Inspection of Ballast Tank 1 to 4 locking distributor (DB00091, DB00092, DB00093, DB00094) as per JIC DB-03-D-001• Degutting of Ballast Tank distributor from location• Shifting of Ballast Tank distributor from location• Removal of all valves from panel of distribution panel• Cleaning of Valves• Replacement of all O-rings of Valves.• Fitment of valves to panel• Pneumatic testing of all valves at 250 bar• Pneumatic testing of Ballast Tank distributor at 250 bar for 05 minutes• Shifting of Panel to onboard & Fitment.• Trials of Ballast. Tank distributor post fitment in the system with the boat's HP air system | Services for Diving and Surface System - Inspection of Ballast Tank 1 to 4 locking distributor (DB00091, DB00092, DB00093, DB00094) as per JIC DB-03-D-001• Degutting of Ballast Tank distributor from location• Shifting of Ballast Tank distributor from location• Removal of all valves from panel of distribution panel• Cleaning of Valves• Replacement of all O-rings of Valves.• Fitment of valves to panel• Pneumatic testing of all valves at 250 bar• Pneumatic testing of Ballast Tank distributor at 250 bar for 05 minutes• Shifting of Panel to onboard & Fitment.• Trials of Ballast. Tank distributor post fitment in the system with the boat's HP air system |
| 2 | Services for Diving and Surface System - Inspection of press solenoid valve DB00131, DB00132, DB00133, DB00134 as per JIC DB-11-D-001• Degutting of Solenoid valve from location• Shifting of solenoid valve from location• Removal of all valves from panel of distribution panel• Cleaning of Valves• Replacement of all O-rings of Valves.• Fitment of valves to panel• Pneumatic testing of all valves at 250 bar• Pneumatic testing of solenoid valves at 250 bar for 05 minutes• Shifting of valves to onboard & Fitment.• Trials of solenoid valves post fitment in the system with the boat's HP air system | Services for Diving and Surface System - Inspection of press solenoid valve DB00131, DB00132, DB00133, DB00134 as per JIC DB-11-D-001• Degutting of Solenoid valve from location• Shifting of solenoid valve from location• Removal of all valves from panel of distribution panel• Cleaning of Valves• Replacement of all O-rings of Valves.• Fitment of valves to panel• Pneumatic testing of all valves at 250 bar• Pneumatic testing of solenoid valves at 250 bar for 05 minutes• Shifting of valves to onboard & Fitment.• Trials of solenoid valves post fitment in the system with the boat's HP air system |
| 3 | Services for Diving and Surface System - Inspection of valve DB00011, DB00013, DB00061, DB00063 as per JIC DB-10-D-001• Degutting of valves from location• Shifting of valves from location• Cleaning of Valves• Replacement of all O-rings of Valves.• Fitment of valves• Pneumatic testing of all valves at 250 bar• Pneumatic testing of valves at 250 bar for 05 minutes• Shifting of valves to onboard & Fitment.• Trials of solenoid valves post fitment in the system with the boat's HP air system | Services for Diving and Surface System - Inspection of valve DB00011, DB00013, DB00061, DB00063 as per JIC DB-10-D-001• Degutting of valves from location• Shifting of valves from location• Cleaning of Valves• Replacement of all O-rings of Valves.• Fitment of valves• Pneumatic testing of all valves at 250 bar• Pneumatic testing of valves at 250 bar for 05 minutes• Shifting of valves to onboard & Fitment.• Trials of solenoid valves post fitment in the system with the boat's HP air system |
| 4 | Services for Normal HP Air Blowing - Inspection of AFT & FWD charging and distribution panel DY01000, DY02000 as per JIC DY – 09-D-001• Degutting of CDP Panel from location• Shifting of CDP Panel from location• Removal of all valves from panel of charging distribution, drain• Cleaning of Valves• Replacement of all O-rings of Valves.• Fitment of valves to panel• Pneumatic testing of all valves at 250 bar• Pneumatic testing of CDP panel at 250 bar for 05 minutes• Shifting of Panel to onboard & Fitment.• Trials of CDP Panel post fitment in the system with the boat's HP air system. | Services for Normal HP Air Blowing - Inspection of AFT & FWD charging and distribution panel DY01000, DY02000 as per JIC DY – 09-D-001• Degutting of CDP Panel from location• Shifting of CDP Panel from location• Removal of all valves from panel of charging distribution, drain• Cleaning of Valves• Replacement of all O-rings of Valves.• Fitment of valves to panel• Pneumatic testing of all valves at 250 bar• Pneumatic testing of CDP panel at 250 bar for 05 minutes• Shifting of Panel to onboard & Fitment.• Trials of CDP Panel post fitment in the system with the boat's HP air system. |
| 5 | Services for Emergency HP Air Blowing - Inspection of (DW02004) Discharge control switchboard cross connection line as per JIC DW – 09-D-004• Degutting of CDP Panel from location• Shifting of CDP Panel from location• Removal of all valves from panel of charging distribution, drain• Cleaning of Valves• Replacement of all O-rings of Valves.• Fitment of valves to panel• Pneumatic testing of all valves at 250 bar• Pneumatic testing of CDP panel at 250 bar for 05 minutes• Shifting of Panel to onboard & Fitment.• Trials of CDP Panel post fitment in the system with the boat's HP air system. | Services for Emergency HP Air Blowing - Inspection of (DW02004) Discharge control switchboard cross connection line as per JIC DW – 09-D-004• Degutting of CDP Panel from location• Shifting of CDP Panel from location• Removal of all valves from panel of charging distribution, drain• Cleaning of Valves• Replacement of all O-rings of Valves.• Fitment of valves to panel• Pneumatic testing of all valves at 250 bar• Pneumatic testing of CDP panel at 250 bar for 05 minutes• Shifting of Panel to onboard & Fitment.• Trials of CDP Panel post fitment in the system with the boat's HP air system. |
| 6 | Services for Emergency HP Air Blowing -Inspection of (DW01200, DW01300) AFT & FWD group charging panel as per JIC DW – 08-D-001• Degutting of CDP Panel from location•Shifting of CDP Panel from location•Removal of all valves from panel of charging distribution, drain•Cleaning of Valves•Replacement of all O-rings of Valves.•Fitment of valves to panel•Pneumatic testing of all valves at 250 bar•Pneumatic testing of CDP panel at 250 bar for 05 minutes•Shifting of Panel to onboard & Fitment.•Trials of CDP Panel post fitment in the system with the boat's HP air system. | Services for Emergency HP Air Blowing -Inspection of (DW01200, DW01300) AFT & FWD group charging panel as per JIC DW – 08-D-001• Degutting of CDP Panel from location•Shifting of CDP Panel from location•Removal of all valves from panel of charging distribution, drain•Cleaning of Valves•Replacement of all O-rings of Valves.•Fitment of valves to panel•Pneumatic testing of all valves at 250 bar•Pneumatic testing of CDP panel at 250 bar for 05 minutes•Shifting of Panel to onboard & Fitment.•Trials of CDP Panel post fitment in the system with the boat's HP air system. |
| 7 | Services for Emergency HP Air Blowing - Inspection of (DW2000), DW01300) AFT & FWD group charging panel as per JIC DW – 08-D-001• Degutting of CDP Panel from location•Shifting of CDP Panel from location•Removal of all valves from panel of charging distribution, drain•Cleaning of Valves•Replacement of all O-rings of Valves.•Fitment of valves to panel•Pneumatic testing of all valves at 250 bar•Pneumatic testing of CDP panel at 250 bar for 05 minutes•Shifting of Panel to onboard & Fitment.•Trials of CDP Panel post fitment in the system with the boat's HP air system | Services for Emergency HP Air Blowing - Inspection of (DW2000), DW01300) AFT & FWD group charging panel as per JIC DW – 08-D-001• Degutting of CDP Panel from location•Shifting of CDP Panel from location•Removal of all valves from panel of charging distribution, drain•Cleaning of Valves•Replacement of all O-rings of Valves.•Fitment of valves to panel•Pneumatic testing of all valves at 250 bar•Pneumatic testing of CDP panel at 250 bar for 05 minutes•Shifting of Panel to onboard & Fitment.•Trials of CDP Panel post fitment in the system with the boat's HP air system |
| 8 | Services for Emergency HP Air Blowing - Inspection of distribution cross connection line DY01041, DY01042, DY01043, DY01044 as per JIC DY-09-D-004•Degutting of valves from location Shifting of valves from location•Cleaning of Valves Replacement of all O-rings, seats of Valves.•Fitment of valves•Pneumatic testing of all valves at 250 bar•Pneumatic testing of valves at 250 bar for 05 minutes•Shifting of valves to onboard & Fitment.•Trials of valves post fitment in the system with the boat's HP air systems. | Services for Emergency HP Air Blowing - Inspection of distribution cross connection line DY01041, DY01042, DY01043, DY01044 as per JIC DY-09-D-004•Degutting of valves from location Shifting of valves from location•Cleaning of Valves Replacement of all O-rings, seats of Valves.•Fitment of valves•Pneumatic testing of all valves at 250 bar•Pneumatic testing of valves at 250 bar for 05 minutes•Shifting of valves to onboard & Fitment.•Trials of valves post fitment in the system with the boat's HP air systems. |
| 9 | Services for Emergency HP Air Blowing - Inspection of NRV DY00109, DY00209, DY00906 and DY00912 as per JIC DY-09-D-008•Degutting of valves from location•Shifting of valves from location•Cleaning of Valves•Replacement of all O-rings, seats of Valves.•Fitment of valves•Pneumatic testing of all valves at 250 bar•Pneumatic testing of valves at 250 bar for 05 minutes•Shifting of valves to onboard & Fitment.•Trials of valves post fitment in the system with the boat's HP. air system | Services for Emergency HP Air Blowing - Inspection of NRV DY00109, DY00209, DY00906 and DY00912 as per JIC DY-09-D-008•Degutting of valves from location•Shifting of valves from location•Cleaning of Valves•Replacement of all O-rings, seats of Valves.•Fitment of valves•Pneumatic testing of all valves at 250 bar•Pneumatic testing of valves at 250 bar for 05 minutes•Shifting of valves to onboard & Fitment.•Trials of valves post fitment in the system with the boat's HP. air system |
| 10 | Services for Emergency HP Air Blowing - Inspection of distribution cross connection line DY01041, DY01011, DY02013, DY02014 as per JIC DY-09-D-004•Degutting of valves from location•Shifting of valves from location•Cleaning of Valves•Replacement of all O-rings, seats of Valves.•Fitment of valves.•Pneumatic testing of all valves at 250 bar•Pneumatic testing of valves at 250 bar for 05 minutes•Shifting of valves to onboard & Fitment.•Trials of valves post fitment in the system with the boat's HP air system | Services for Emergency HP Air Blowing - Inspection of distribution cross connection line DY01041, DY01011, DY02013, DY02014 as per JIC DY-09-D-004•Degutting of valves from location•Shifting of valves from location•Cleaning of Valves•Replacement of all O-rings, seats of Valves.•Fitment of valves.•Pneumatic testing of all valves at 250 bar•Pneumatic testing of valves at 250 bar for 05 minutes•Shifting of valves to onboard & Fitment.•Trials of valves post fitment in the system with the boat's HP air system |
| 11 | Services for Sea Water Circuit - Carryout water tightness test of the NRV (EM00044) as per JIC EM-04-D-010•Degutting of valves from location•Shifting of valves from location•Cleaning of Valves•Replacement of all O-rings, seats of Valves.•Fitment of valve•Shifting of valve to onboard & Fitment.•Hydraulic Trials of valve at 52 Bar post fitment in the system with the boat's HP air system. | Services for Sea Water Circuit - Carryout water tightness test of the NRV (EM00044) as per JIC EM-04-D-010•Degutting of valves from location•Shifting of valves from location•Cleaning of Valves•Replacement of all O-rings, seats of Valves.•Fitment of valve•Shifting of valve to onboard & Fitment.•Hydraulic Trials of valve at 52 Bar post fitment in the system with the boat's HP air system. |
| 12 | Services for Sea Water Circuit - General inspection of DM00033 Sea chest blow valve as per JIC DM-19-D-002.•Degutting of valves from location•Shifting of valves from location•Cleaning of Valves•Replacement of all O-rings, seats of Valves.•Fitment of valves•Pneumatic testing of all valves at 250 bar•Pneumatic testing of valves at 250 bar for 05 minutes•Shifting of valves to onboard & Fitment.•trials of valves post fitment in the system with the boat's HP air system | Services for Sea Water Circuit - General inspection of DM00033 Sea chest blow valve as per JIC DM-19-D-002.•Degutting of valves from location•Shifting of valves from location•Cleaning of Valves•Replacement of all O-rings, seats of Valves.•Fitment of valves•Pneumatic testing of all valves at 250 bar•Pneumatic testing of valves at 250 bar for 05 minutes•Shifting of valves to onboard & Fitment.•trials of valves post fitment in the system with the boat's HP air system |
| 13 | Services for Sea Water Circuit - Inspection of NRV EM00009, EM00010 and EM00011 as per JIC EM-04-D-006.•Degutting of valves from location•Shifting of valves from location•Cleaning of Valves•Replacement of all O-rings, seats of Valves.•Fitment of valves•Pneumatic testing of all valves at 250 bar•Pneumatic testing of valves at 250 bar for 05 minutes•Shifting of valves to onboard & Fitment.•Trials of valves post fitment in the system with the boat's HP air system | Services for Sea Water Circuit - Inspection of NRV EM00009, EM00010 and EM00011 as per JIC EM-04-D-006.•Degutting of valves from location•Shifting of valves from location•Cleaning of Valves•Replacement of all O-rings, seats of Valves.•Fitment of valves•Pneumatic testing of all valves at 250 bar•Pneumatic testing of valves at 250 bar for 05 minutes•Shifting of valves to onboard & Fitment.•Trials of valves post fitment in the system with the boat's HP air system |
| 14 | Services for Sea Water Circuit - Carryout water tightness test of the NRV (EN00130) as per JIC EN-06-D-010•Degutting of valves from location•Shifting of valves from location•Cleaning of Valves•Replacement of all O-rings, seats of Valves.•Fitment of valve Shifting of valve to onboard & Fitment.•Hydraulic Trials of valve at 52 Bar post fitment in the system with the boat's HP air system | Services for Sea Water Circuit - Carryout water tightness test of the NRV (EN00130) as per JIC EN-06-D-010•Degutting of valves from location•Shifting of valves from location•Cleaning of Valves•Replacement of all O-rings, seats of Valves.•Fitment of valve Shifting of valve to onboard & Fitment.•Hydraulic Trials of valve at 52 Bar post fitment in the system with the boat's HP air system |
| 15 | Services for Sea Water Circuit - Inspection of NRV pump discharge EN00020 and EN00021 as per JIC EN-06-D-005.•Degutting of valves from location•Shifting of valves from location•Cleaning of Valves•Replacement of all O-rings, seats of Valves.•Fitment of valves•Pneumatic testing of all valves at 250 bar•neumatic testing of valves at 250 bar for 05 minutes•Shifting of valves to onboard & Fitment.•Trials of valves post fitment in the system with the boat's HP air system | Services for Sea Water Circuit - Inspection of NRV pump discharge EN00020 and EN00021 as per JIC EN-06-D-005.•Degutting of valves from location•Shifting of valves from location•Cleaning of Valves•Replacement of all O-rings, seats of Valves.•Fitment of valves•Pneumatic testing of all valves at 250 bar•neumatic testing of valves at 250 bar for 05 minutes•Shifting of valves to onboard & Fitment.•Trials of valves post fitment in the system with the boat's HP air system |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysBid Opening Date
Technical bids will be opened and evaluated.