Defence Government Departments Closing in 6 days TDR #56931232

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard Ins Kalvari; Repairs And Overhauling Of Hp Air Valves And Reducers Of Charging Discharging Panel (Cdp) Of M/S Cff Onboard Ins Kalvari; Servi

Issued by Government Departments · Mumbai, Maharashtra
Tender Value
Ref. Documents
Estimated cost
Bid Submission
20 Aug 2026
6 days left
EMD
6.48 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Mumbai → Maharashtra
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard Ins Kalvari; Repairs And Overhauling Of Hp Air Valves And Reducers Of Charging Discharging Panel (Cdp) Of M/S Cff Onboard Ins Kalvari; Service Provider - Services For Diving And Surface System - Inspection Of Ballast Tank 1 To 4 Locking Distributor (Db00091, Db00092, Db00093, Db00094) As Per Jic Db-03-D-001• Degutting Of Ballast Tank Distributor From Location• Shifting Of Ballast Tank Distributor From Location• Removal Of All Valves From Panel Of Distribution Panel• Cleaning Of Valves• Replacement Of All O-Rings Of Valves.• Fitment Of Valves To Panel• Pneumatic Testing Of All Valves At 250 Bar• Pneumatic Testing Of Ballast Tank Distributor At 250 Bar For 05 Minutes• Shifting Of Panel To Onboard & Fitment.• Trials Of Ballast. Tank Distributor Post Fitment In The System With The Boats Hp Air System , Services For Diving And Surface System - Inspection Of Press Solenoid Valve Db00131, Db00132, Db00133, Db00134 As Per Jic Db-11-D-001• Degutting Of Solenoid Valve From Location• Shifting Of Solenoid Valve From Location• Removal Of All Valves From Panel Of Distribution Panel• Cleaning Of Valves• Replacement Of All O-Rings Of Valves.• Fitment Of Valves To Panel• Pneumatic Testing Of All Valves At 250 Bar• Pneumatic Testing Of Solenoid Valves At 250 Bar For 05 Minutes• Shifting Of Valves To Onboard & Fitment.• Trials Of Solenoid Valves Post Fitment In The System With The Boats Hp Air System , Services For Diving And Surface System - Inspection Of Valve Db00011, Db00013, Db00061, Db00063 As Per Jic Db-10-D-001• Degutting Of Valves From Location• Shifting Of Valves From Location• Cleaning Of Valves• Replacement Of All O-Rings Of Valves.• Fitment Of Valves• Pneumatic Testing Of All Valves At 250 Bar• Pneumatic Testing Of Valves At 250 Bar For 05 Minutes• Shifting Of Valves To Onboard & Fitment.• Trials Of Solenoid Valves Post Fitment In The System With The Boats Hp Air System , Services For Normal Hp Air Blowing - Inspection Of Aft & Fwd Charging And Distribution Panel Dy01000, Dy02000 As Per Jic Dy – 09-D-001• Degutting Of Cdp Panel From Location• Shifting Of Cdp Panel From Location• Removal Of All Valves From Panel Of Charging Distribution, Drain• Cleaning Of Valves• Replacement Of All O-Rings Of Valves.• Fitment Of Valves To Panel• Pneumatic Testing Of All Valves At 250 Bar• Pneumatic Testing Of Cdp Panel At 250 Bar For 05 Minutes• Shifting Of Panel To Onboard & Fitment.• Trials Of Cdp Panel Post Fitment In The System With The Boats Hp Air System. , Services For Emergency Hp Air Blowing - Inspection Of (Dw02004) Discharge Control Switchboard Cross Connection Line As Per Jic Dw – 09-D-004• Degutting Of Cdp Panel From Location• Shifting Of Cdp Panel From Location• Removal Of All Valves From Panel Of Charging Distribution, Drain• Cleaning Of Valves• Replacement Of All O-Rings Of Valves.• Fitment Of Valves To Panel• Pneumatic Testing Of All Valves At 250 Bar• Pneumatic Testing Of Cdp Panel At 250 Bar For 05 Minutes• Shifting Of Panel To Onboard & Fitment.• Trials Of Cdp Panel Post Fitment In The System With The Boats Hp Air System. , Services For Emergency Hp Air Blowing -Inspection Of (Dw01200, Dw01300) Aft & Fwd Group Charging Panel As Per Jic Dw – 08-D-001• Degutting Of Cdp Panel From Location•Shifting Of Cdp Panel From Location•Removal Of All Valves From Panel Of Charging Distribution, Drain•Cleaning Of Valves•Replacement Of All O-Rings Of Valves.•Fitment Of Valves To Panel•Pneumatic Testing Of All Valves At 250 Bar•Pneumatic Testing Of Cdp Panel At 250 Bar For 05 Minutes•Shifting Of Panel To Onboard & Fitment.•Trials Of Cdp Panel Post Fitment In The System With The Boats Hp Air System. , Services For Emergency Hp Air Blowing - Inspection Of (Dw2000), Dw01300) Aft & Fwd Group Charging Panel As Per Jic Dw – 08-D-001• Degutting Of Cdp Panel From Location•Shifting Of Cdp Panel From Location•Removal Of All Valves From Panel Of Charging Distribution, Drain•Cleaning Of Valves•Replacement Of All O-Rings Of Valves.•Fitment Of Valves To Panel•Pneumatic Testing Of All Valves At 250 Bar•Pneumatic Testing Of Cdp Panel At 250 Bar For 05 Minutes•Shifting Of Panel To Onboard & Fitment.•Trials Of Cdp Panel Post Fitment In The System With The Boats Hp Air System , Services For Emergency Hp Air Blowing - Inspection Of Distribution Cross Connection Line Dy01041, Dy01042, Dy01043, Dy01044 As Per Jic Dy-09-D-004•Degutting Of Valves From Location Shifting Of Valves From Location•Cleaning Of Valves Replacement Of All O-Rings, Seats Of Valves.•Fitment Of Valves•Pneumatic Testing Of All Valves At 250 Bar•Pneumatic Testing Of Valves At 250 Bar For 05 Minutes•Shifting Of Valves To Onboard & Fitment.•Trials Of Valves Post Fitment In The System With The Boats Hp Air Systems. , Services For Emergency Hp Air Blowing - Inspection Of Nrv Dy00109, Dy00209, Dy00906 And Dy00912 As Per Jic Dy-09-D-008•Degutting Of Valves From Location•Shifting Of Valves From Location•Cleaning Of Valves•Replacement Of All O-Rings, Seats Of Valves.•Fitment Of Valves•Pneumatic Testing Of All Valves At 250 Bar•Pneumatic Testing Of Valves At 250 Bar For 05 Minutes•Shifting Of Valves To Onboard & Fitment.•Trials Of Valves Post Fitment In The System With The Boats Hp. Air System , Services For Emergency Hp Air Blowing - Inspection Of Distribution Cross Connection Line Dy01041, Dy01011, Dy02013, Dy02014 As Per Jic Dy-09-D-004•Degutting Of Valves From Location•Shifting Of Valves From Location•Cleaning Of Valves•Replacement Of All O-Rings, Seats Of Valves.•Fitment Of Valves.•Pneumatic Testing Of All Valves At 250 Bar•Pneumatic Testing Of Valves At 250 Bar For 05 Minutes•Shifting Of Valves To Onboard & Fitment.•Trials Of Valves Post Fitment In The System With The Boats Hp Air System , Services For Sea Water Circuit - Carryout Water Tightness Test Of The Nrv (Em00044) As Per Jic Em-04-D-010•Degutting Of Valves From Location•Shifting Of Valves From Location•Cleaning Of Valves•Replacement Of All O-Rings, Seats Of Valves.•Fitment Of Valve•Shifting Of Valve To Onboard & Fitment.•Hydraulic Trials Of Valve At 52 Bar Post Fitment In The System With The Boats Hp Air System. , Services For Sea Water Circuit - General Inspection Of Dm00033 Sea Chest Blow Valve As Per Jic Dm-19-D-002.•Degutting Of Valves From Location•Shifting Of Valves From Location•Cleaning Of Valves•Replacement Of All O-Rings, Seats Of Valves.•Fitment Of Valves•Pneumatic Testing Of All Valves At 250 Bar•Pneumatic Testing Of Valves At 250 Bar For 05 Minutes•Shifting Of Valves To Onboard & Fitment.•Trials Of Valves Post Fitment In The System With The Boats Hp Air System , Services For Sea Water Circuit - Inspection Of Nrv Em00009, Em00010 And Em00011 As Per Jic Em-04-D-006.•Degutting Of Valves From Location•Shifting Of Valves From Location•Cleaning Of Valves•Replacement Of All O-Rings, Seats Of Valves.•Fitment Of Valves•Pneumatic Testing Of All Valves At 250 Bar•Pneumatic Testing Of Valves At 250 Bar For 05 Minutes•Shifting Of Valves To Onboard & Fitment.•Trials Of Valves Post Fitment In The System With The Boats Hp Air System , Services For Sea Water Circuit - Carryout Water Tightness Test Of The Nrv (En00130) As Per Jic En-06-D-010•Degutting Of Valves From Location•Shifting Of Valves From Location•Cleaning Of Valves•Replacement Of All O-Rings, Seats Of Valves.•Fitment Of Valve Shifting Of Valve To Onboard & Fitment.•Hydraulic Trials Of Valve At 52 Bar Post Fitment In The System With The Boats Hp Air System , Services For Sea Water Circuit - Inspection Of Nrv Pump Discharge En00020 And En00021 As Per Jic En-06-D-005.•Degutting Of Valves From Location•Shifting Of Valves From Location•Cleaning Of Valves•Replacement Of All O-Rings, Seats Of Valves.•Fitment Of Valves•Pneumatic Testing Of All Valves At 250 Bar•Neumatic Testing Of Valves At 250 Bar For 05 Minutes•Shifting Of Valves To Onboard & Fitment.•Trials Of Valves Post Fitment In The System With The Boats Hp Air System

BOQ

Sl. No. Item TitleItem Description
1Services for Diving and Surface System - Inspection of Ballast Tank 1 to 4 locking distributor (DB00091, DB00092, DB00093, DB00094) as per JIC DB-03-D-001• Degutting of Ballast Tank distributor from location• Shifting of Ballast Tank distributor from location• Removal of all valves from panel of distribution panel• Cleaning of Valves• Replacement of all O-rings of Valves.• Fitment of valves to panel• Pneumatic testing of all valves at 250 bar• Pneumatic testing of Ballast Tank distributor at 250 bar for 05 minutes• Shifting of Panel to onboard & Fitment.• Trials of Ballast. Tank distributor post fitment in the system with the boat's HP air systemServices for Diving and Surface System - Inspection of Ballast Tank 1 to 4 locking distributor (DB00091, DB00092, DB00093, DB00094) as per JIC DB-03-D-001• Degutting of Ballast Tank distributor from location• Shifting of Ballast Tank distributor from location• Removal of all valves from panel of distribution panel• Cleaning of Valves• Replacement of all O-rings of Valves.• Fitment of valves to panel• Pneumatic testing of all valves at 250 bar• Pneumatic testing of Ballast Tank distributor at 250 bar for 05 minutes• Shifting of Panel to onboard & Fitment.• Trials of Ballast. Tank distributor post fitment in the system with the boat's HP air system
2Services for Diving and Surface System - Inspection of press solenoid valve DB00131, DB00132, DB00133, DB00134 as per JIC DB-11-D-001• Degutting of Solenoid valve from location• Shifting of solenoid valve from location• Removal of all valves from panel of distribution panel• Cleaning of Valves• Replacement of all O-rings of Valves.• Fitment of valves to panel• Pneumatic testing of all valves at 250 bar• Pneumatic testing of solenoid valves at 250 bar for 05 minutes• Shifting of valves to onboard & Fitment.• Trials of solenoid valves post fitment in the system with the boat's HP air systemServices for Diving and Surface System - Inspection of press solenoid valve DB00131, DB00132, DB00133, DB00134 as per JIC DB-11-D-001• Degutting of Solenoid valve from location• Shifting of solenoid valve from location• Removal of all valves from panel of distribution panel• Cleaning of Valves• Replacement of all O-rings of Valves.• Fitment of valves to panel• Pneumatic testing of all valves at 250 bar• Pneumatic testing of solenoid valves at 250 bar for 05 minutes• Shifting of valves to onboard & Fitment.• Trials of solenoid valves post fitment in the system with the boat's HP air system
3Services for Diving and Surface System - Inspection of valve DB00011, DB00013, DB00061, DB00063 as per JIC DB-10-D-001• Degutting of valves from location• Shifting of valves from location• Cleaning of Valves• Replacement of all O-rings of Valves.• Fitment of valves• Pneumatic testing of all valves at 250 bar• Pneumatic testing of valves at 250 bar for 05 minutes• Shifting of valves to onboard & Fitment.• Trials of solenoid valves post fitment in the system with the boat's HP air systemServices for Diving and Surface System - Inspection of valve DB00011, DB00013, DB00061, DB00063 as per JIC DB-10-D-001• Degutting of valves from location• Shifting of valves from location• Cleaning of Valves• Replacement of all O-rings of Valves.• Fitment of valves• Pneumatic testing of all valves at 250 bar• Pneumatic testing of valves at 250 bar for 05 minutes• Shifting of valves to onboard & Fitment.• Trials of solenoid valves post fitment in the system with the boat's HP air system
4Services for Normal HP Air Blowing - Inspection of AFT & FWD charging and distribution panel DY01000, DY02000 as per JIC DY – 09-D-001• Degutting of CDP Panel from location• Shifting of CDP Panel from location• Removal of all valves from panel of charging distribution, drain• Cleaning of Valves• Replacement of all O-rings of Valves.• Fitment of valves to panel• Pneumatic testing of all valves at 250 bar• Pneumatic testing of CDP panel at 250 bar for 05 minutes• Shifting of Panel to onboard & Fitment.• Trials of CDP Panel post fitment in the system with the boat's HP air system.Services for Normal HP Air Blowing - Inspection of AFT & FWD charging and distribution panel DY01000, DY02000 as per JIC DY – 09-D-001• Degutting of CDP Panel from location• Shifting of CDP Panel from location• Removal of all valves from panel of charging distribution, drain• Cleaning of Valves• Replacement of all O-rings of Valves.• Fitment of valves to panel• Pneumatic testing of all valves at 250 bar• Pneumatic testing of CDP panel at 250 bar for 05 minutes• Shifting of Panel to onboard & Fitment.• Trials of CDP Panel post fitment in the system with the boat's HP air system.
5Services for Emergency HP Air Blowing - Inspection of (DW02004) Discharge control switchboard cross connection line as per JIC DW – 09-D-004• Degutting of CDP Panel from location• Shifting of CDP Panel from location• Removal of all valves from panel of charging distribution, drain• Cleaning of Valves• Replacement of all O-rings of Valves.• Fitment of valves to panel• Pneumatic testing of all valves at 250 bar• Pneumatic testing of CDP panel at 250 bar for 05 minutes• Shifting of Panel to onboard & Fitment.• Trials of CDP Panel post fitment in the system with the boat's HP air system.Services for Emergency HP Air Blowing - Inspection of (DW02004) Discharge control switchboard cross connection line as per JIC DW – 09-D-004• Degutting of CDP Panel from location• Shifting of CDP Panel from location• Removal of all valves from panel of charging distribution, drain• Cleaning of Valves• Replacement of all O-rings of Valves.• Fitment of valves to panel• Pneumatic testing of all valves at 250 bar• Pneumatic testing of CDP panel at 250 bar for 05 minutes• Shifting of Panel to onboard & Fitment.• Trials of CDP Panel post fitment in the system with the boat's HP air system.
6Services for Emergency HP Air Blowing -Inspection of (DW01200, DW01300) AFT & FWD group charging panel as per JIC DW – 08-D-001• Degutting of CDP Panel from location•Shifting of CDP Panel from location•Removal of all valves from panel of charging distribution, drain•Cleaning of Valves•Replacement of all O-rings of Valves.•Fitment of valves to panel•Pneumatic testing of all valves at 250 bar•Pneumatic testing of CDP panel at 250 bar for 05 minutes•Shifting of Panel to onboard & Fitment.•Trials of CDP Panel post fitment in the system with the boat's HP air system.Services for Emergency HP Air Blowing -Inspection of (DW01200, DW01300) AFT & FWD group charging panel as per JIC DW – 08-D-001• Degutting of CDP Panel from location•Shifting of CDP Panel from location•Removal of all valves from panel of charging distribution, drain•Cleaning of Valves•Replacement of all O-rings of Valves.•Fitment of valves to panel•Pneumatic testing of all valves at 250 bar•Pneumatic testing of CDP panel at 250 bar for 05 minutes•Shifting of Panel to onboard & Fitment.•Trials of CDP Panel post fitment in the system with the boat's HP air system.
7Services for Emergency HP Air Blowing - Inspection of (DW2000), DW01300) AFT & FWD group charging panel as per JIC DW – 08-D-001• Degutting of CDP Panel from location•Shifting of CDP Panel from location•Removal of all valves from panel of charging distribution, drain•Cleaning of Valves•Replacement of all O-rings of Valves.•Fitment of valves to panel•Pneumatic testing of all valves at 250 bar•Pneumatic testing of CDP panel at 250 bar for 05 minutes•Shifting of Panel to onboard & Fitment.•Trials of CDP Panel post fitment in the system with the boat's HP air systemServices for Emergency HP Air Blowing - Inspection of (DW2000), DW01300) AFT & FWD group charging panel as per JIC DW – 08-D-001• Degutting of CDP Panel from location•Shifting of CDP Panel from location•Removal of all valves from panel of charging distribution, drain•Cleaning of Valves•Replacement of all O-rings of Valves.•Fitment of valves to panel•Pneumatic testing of all valves at 250 bar•Pneumatic testing of CDP panel at 250 bar for 05 minutes•Shifting of Panel to onboard & Fitment.•Trials of CDP Panel post fitment in the system with the boat's HP air system
8Services for Emergency HP Air Blowing - Inspection of distribution cross connection line DY01041, DY01042, DY01043, DY01044 as per JIC DY-09-D-004•Degutting of valves from location Shifting of valves from location•Cleaning of Valves Replacement of all O-rings, seats of Valves.•Fitment of valves•Pneumatic testing of all valves at 250 bar•Pneumatic testing of valves at 250 bar for 05 minutes•Shifting of valves to onboard & Fitment.•Trials of valves post fitment in the system with the boat's HP air systems.Services for Emergency HP Air Blowing - Inspection of distribution cross connection line DY01041, DY01042, DY01043, DY01044 as per JIC DY-09-D-004•Degutting of valves from location Shifting of valves from location•Cleaning of Valves Replacement of all O-rings, seats of Valves.•Fitment of valves•Pneumatic testing of all valves at 250 bar•Pneumatic testing of valves at 250 bar for 05 minutes•Shifting of valves to onboard & Fitment.•Trials of valves post fitment in the system with the boat's HP air systems.
9Services for Emergency HP Air Blowing - Inspection of NRV DY00109, DY00209, DY00906 and DY00912 as per JIC DY-09-D-008•Degutting of valves from location•Shifting of valves from location•Cleaning of Valves•Replacement of all O-rings, seats of Valves.•Fitment of valves•Pneumatic testing of all valves at 250 bar•Pneumatic testing of valves at 250 bar for 05 minutes•Shifting of valves to onboard & Fitment.•Trials of valves post fitment in the system with the boat's HP. air systemServices for Emergency HP Air Blowing - Inspection of NRV DY00109, DY00209, DY00906 and DY00912 as per JIC DY-09-D-008•Degutting of valves from location•Shifting of valves from location•Cleaning of Valves•Replacement of all O-rings, seats of Valves.•Fitment of valves•Pneumatic testing of all valves at 250 bar•Pneumatic testing of valves at 250 bar for 05 minutes•Shifting of valves to onboard & Fitment.•Trials of valves post fitment in the system with the boat's HP. air system
10Services for Emergency HP Air Blowing - Inspection of distribution cross connection line DY01041, DY01011, DY02013, DY02014 as per JIC DY-09-D-004•Degutting of valves from location•Shifting of valves from location•Cleaning of Valves•Replacement of all O-rings, seats of Valves.•Fitment of valves.•Pneumatic testing of all valves at 250 bar•Pneumatic testing of valves at 250 bar for 05 minutes•Shifting of valves to onboard & Fitment.•Trials of valves post fitment in the system with the boat's HP air systemServices for Emergency HP Air Blowing - Inspection of distribution cross connection line DY01041, DY01011, DY02013, DY02014 as per JIC DY-09-D-004•Degutting of valves from location•Shifting of valves from location•Cleaning of Valves•Replacement of all O-rings, seats of Valves.•Fitment of valves.•Pneumatic testing of all valves at 250 bar•Pneumatic testing of valves at 250 bar for 05 minutes•Shifting of valves to onboard & Fitment.•Trials of valves post fitment in the system with the boat's HP air system
11Services for Sea Water Circuit - Carryout water tightness test of the NRV (EM00044) as per JIC EM-04-D-010•Degutting of valves from location•Shifting of valves from location•Cleaning of Valves•Replacement of all O-rings, seats of Valves.•Fitment of valve•Shifting of valve to onboard & Fitment.•Hydraulic Trials of valve at 52 Bar post fitment in the system with the boat's HP air system.Services for Sea Water Circuit - Carryout water tightness test of the NRV (EM00044) as per JIC EM-04-D-010•Degutting of valves from location•Shifting of valves from location•Cleaning of Valves•Replacement of all O-rings, seats of Valves.•Fitment of valve•Shifting of valve to onboard & Fitment.•Hydraulic Trials of valve at 52 Bar post fitment in the system with the boat's HP air system.
12Services for Sea Water Circuit - General inspection of DM00033 Sea chest blow valve as per JIC DM-19-D-002.•Degutting of valves from location•Shifting of valves from location•Cleaning of Valves•Replacement of all O-rings, seats of Valves.•Fitment of valves•Pneumatic testing of all valves at 250 bar•Pneumatic testing of valves at 250 bar for 05 minutes•Shifting of valves to onboard & Fitment.•trials of valves post fitment in the system with the boat's HP air systemServices for Sea Water Circuit - General inspection of DM00033 Sea chest blow valve as per JIC DM-19-D-002.•Degutting of valves from location•Shifting of valves from location•Cleaning of Valves•Replacement of all O-rings, seats of Valves.•Fitment of valves•Pneumatic testing of all valves at 250 bar•Pneumatic testing of valves at 250 bar for 05 minutes•Shifting of valves to onboard & Fitment.•trials of valves post fitment in the system with the boat's HP air system
13Services for Sea Water Circuit - Inspection of NRV EM00009, EM00010 and EM00011 as per JIC EM-04-D-006.•Degutting of valves from location•Shifting of valves from location•Cleaning of Valves•Replacement of all O-rings, seats of Valves.•Fitment of valves•Pneumatic testing of all valves at 250 bar•Pneumatic testing of valves at 250 bar for 05 minutes•Shifting of valves to onboard & Fitment.•Trials of valves post fitment in the system with the boat's HP air systemServices for Sea Water Circuit - Inspection of NRV EM00009, EM00010 and EM00011 as per JIC EM-04-D-006.•Degutting of valves from location•Shifting of valves from location•Cleaning of Valves•Replacement of all O-rings, seats of Valves.•Fitment of valves•Pneumatic testing of all valves at 250 bar•Pneumatic testing of valves at 250 bar for 05 minutes•Shifting of valves to onboard & Fitment.•Trials of valves post fitment in the system with the boat's HP air system
14Services for Sea Water Circuit - Carryout water tightness test of the NRV (EN00130) as per JIC EN-06-D-010•Degutting of valves from location•Shifting of valves from location•Cleaning of Valves•Replacement of all O-rings, seats of Valves.•Fitment of valve Shifting of valve to onboard & Fitment.•Hydraulic Trials of valve at 52 Bar post fitment in the system with the boat's HP air systemServices for Sea Water Circuit - Carryout water tightness test of the NRV (EN00130) as per JIC EN-06-D-010•Degutting of valves from location•Shifting of valves from location•Cleaning of Valves•Replacement of all O-rings, seats of Valves.•Fitment of valve Shifting of valve to onboard & Fitment.•Hydraulic Trials of valve at 52 Bar post fitment in the system with the boat's HP air system
15Services for Sea Water Circuit - Inspection of NRV pump discharge EN00020 and EN00021 as per JIC EN-06-D-005.•Degutting of valves from location•Shifting of valves from location•Cleaning of Valves•Replacement of all O-rings, seats of Valves.•Fitment of valves•Pneumatic testing of all valves at 250 bar•neumatic testing of valves at 250 bar for 05 minutes•Shifting of valves to onboard & Fitment.•Trials of valves post fitment in the system with the boat's HP air systemServices for Sea Water Circuit - Inspection of NRV pump discharge EN00020 and EN00021 as per JIC EN-06-D-005.•Degutting of valves from location•Shifting of valves from location•Cleaning of Valves•Replacement of all O-rings, seats of Valves.•Fitment of valves•Pneumatic testing of all valves at 250 bar•neumatic testing of valves at 250 bar for 05 minutes•Shifting of valves to onboard & Fitment.•Trials of valves post fitment in the system with the boat's HP air system

AI Tender Summary

OUR REF NO 56931232
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 20-08-2026
Authority
Authority Name Indian Navy
Work Description Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard Ins Kalvari; Repairs And Overhauling Of Hp Air Valves And Reducers Of Charging Discharging Panel (Cdp) Of M/S Cff Onboard Ins Kalvari; Service Provider - Services For Diving And Surface System - Inspection Of Ballast Tank 1 To 4 Locking Distributor (Db00091, Db00092, Db00093, Db00094) As Per Jic Db-03-D-001• Degutting Of Ballast Tank Distributor From Location• Shifting Of Ballast Tank Distributor From Location• Removal Of All Valves From Panel Of Distribution Panel• Cleaning Of Valves• Replacement Of All O-Rings Of Valves.• Fitment Of Valves To Panel• Pneumatic Testing Of All Valves At 250 Bar• Pneumatic Testing Of Ballast Tank Distributor At 250 Bar For 05 Minutes• Shifting Of Panel To Onboard & Fitment.• Trials Of Ballast. Tank Distributor Post Fitment In The System With The Boats Hp Air System , Services For Diving And Surface System - Inspection Of Press Solenoid Valve Db00131, Db00132, Db00133, Db00134 As Per Jic Db-11-D-001• Degutting Of Solenoid Valve From Location• Shifting Of Solenoid Valve From Location• Removal Of All Valves From Panel Of Distribution Panel• Cleaning Of Valves• Replacement Of All O-Rings Of Valves.• Fitment Of Valves To Panel• Pneumatic Testing Of All Valves At 250 Bar• Pneumatic Testing Of Solenoid Valves At 250 Bar For 05 Minutes• Shifting Of Valves To Onboard & Fitment.• Trials Of Solenoid Valves Post Fitment In The System With The Boats Hp Air System , Services For Diving And Surface System - Inspection Of Valve Db00011, Db00013, Db00061, Db00063 As Per Jic Db-10-D-001• Degutting Of Valves From Location• Shifting Of Valves From Location• Cleaning Of Valves• Replacement Of All O-Rings Of Valves.• Fitment Of Valves• Pneumatic Testing Of All Valves At 250 Bar• Pneumatic Testing Of Valves At 250 Bar For 05 Minutes• Shifting Of Valves To Onboard & Fitment.• Trials Of Solenoid Valves Post Fitment In The System With The Boats Hp Air System , Services For Normal Hp Air Blowing - Inspection Of Aft & Fwd Charging And Distribution Panel Dy01000, Dy02000 As Per Jic Dy – 09-D-001• Degutting Of Cdp Panel From Location• Shifting Of Cdp Panel From Location• Removal Of All Valves From Panel Of Charging Distribution, Drain• Cleaning Of Valves• Replacement Of All O-Rings Of Valves.• Fitment Of Valves To Panel• Pneumatic Testing Of All Valves At 250 Bar• Pneumatic Testing Of Cdp Panel At 250 Bar For 05 Minutes• Shifting Of Panel To Onboard & Fitment.• Trials Of Cdp Panel Post Fitment In The System With The Boats Hp Air System. , Services For Emergency Hp Air Blowing - Inspection Of (Dw02004) Discharge Control Switchboard Cross Connection Line As Per Jic Dw – 09-D-004• Degutting Of Cdp Panel From Location• Shifting Of Cdp Panel From Location• Removal Of All Valves From Panel Of Charging Distribution, Drain• Cleaning Of Valves• Replacement Of All O-Rings Of Valves.• Fitment Of Valves To Panel• Pneumatic Testing Of All Valves At 250 Bar• Pneumatic Testing Of Cdp Panel At 250 Bar For 05 Minutes• Shifting Of Panel To Onboard & Fitment.• Trials Of Cdp Panel Post Fitment In The System With The Boats Hp Air System. , Services For Emergency Hp Air Blowing -Inspection Of (Dw01200, Dw01300) Aft & Fwd Group Charging Panel As Per Jic Dw – 08-D-001• Degutting Of Cdp Panel From Location•Shifting Of Cdp Panel From Location•Removal Of All Valves From Panel Of Charging Distribution, Drain•Cleaning Of Valves•Replacement Of All O-Rings Of Valves.•Fitment Of Valves To Panel•Pneumatic Testing Of All Valves At 250 Bar•Pneumatic Testing Of Cdp Panel At 250 Bar For 05 Minutes•Shifting Of Panel To Onboard & Fitment.•Trials Of Cdp Panel Post Fitment In The System With The Boats Hp Air System. , Services For Emergency Hp Air Blowing - Inspection Of (Dw2000), Dw01300) Aft & Fwd Group Charging Panel As Per Jic Dw – 08-D-001• Degutting Of Cdp Panel From Location•Shifting Of Cdp Panel From Location•Removal Of All Valves From Panel Of Charging Distribution, Drain•Cleaning Of Valves•Replacement Of All O-Rings Of Valves.•Fitment Of Valves To Panel•Pneumatic Testing Of All Valves At 250 Bar•Pneumatic Testing Of Cdp Panel At 250 Bar For 05 Minutes•Shifting Of Panel To Onboard & Fitment.•Trials Of Cdp Panel Post Fitment In The System With The Boats Hp Air System , Services For Emergency Hp Air Blowing - Inspection Of Distribution Cross Connection Line Dy01041, Dy01042, Dy01043, Dy01044 As Per Jic Dy-09-D-004•Degutting Of Valves From Location Shifting Of Valves From Location•Cleaning Of Valves Replacement Of All O-Rings, Seats Of Valves.•Fitment Of Valves•Pneumatic Testing Of All Valves At 250 Bar•Pneumatic Testing Of Valves At 250 Bar For 05 Minutes•Shifting Of Valves To Onboard & Fitment.•Trials Of Valves Post Fitment In The System With The Boats Hp Air Systems. , Services For Emergency Hp Air Blowing - Inspection Of Nrv Dy00109, Dy00209, Dy00906 And Dy00912 As Per Jic Dy-09-D-008•Degutting Of Valves From Location•Shifting Of Valves From Location•Cleaning Of Valves•Replacement Of All O-Rings, Seats Of Valves.•Fitment Of Valves•Pneumatic Testing Of All Valves At 250 Bar•Pneumatic Testing Of Valves At 250 Bar For 05 Minutes•Shifting Of Valves To Onboard & Fitment.•Trials Of Valves Post Fitment In The System With The Boats Hp. Air System , Services For Emergency Hp Air Blowing - Inspection Of Distribution Cross Connection Line Dy01041, Dy01011, Dy02013, Dy02014 As Per Jic Dy-09-D-004•Degutting Of Valves From Location•Shifting Of Valves From Location•Cleaning Of Valves•Replacement Of All O-Rings, Seats Of Valves.•Fitment Of Valves.•Pneumatic Testing Of All Valves At 250 Bar•Pneumatic Testing Of Valves At 250 Bar For 05 Minutes•Shifting Of Valves To Onboard & Fitment.•Trials Of Valves Post Fitment In The System With The Boats Hp Air System , Services For Sea Water Circuit - Carryout Water Tightness Test Of The Nrv (Em00044) As Per Jic Em-04-D-010•Degutting Of Valves From Location•Shifting Of Valves From Location•Cleaning Of Valves•Replacement Of All O-Rings, Seats Of Valves.•Fitment Of Valve•Shifting Of Valve To Onboard & Fitment.•Hydraulic Trials Of Valve At 52 Bar Post Fitment In The System With The Boats Hp Air System. , Services For Sea Water Circuit - General Inspection Of Dm00033 Sea Chest Blow Valve As Per Jic Dm-19-D-002.•Degutting Of Valves From Location•Shifting Of Valves From Location•Cleaning Of Valves•Replacement Of All O-Rings, Seats Of Valves.•Fitment Of Valves•Pneumatic Testing Of All Valves At 250 Bar•Pneumatic Testing Of Valves At 250 Bar For 05 Minutes•Shifting Of Valves To Onboard & Fitment.•Trials Of Valves Post Fitment In The System With The Boats Hp Air System , Services For Sea Water Circuit - Inspection Of Nrv Em00009, Em00010 And Em00011 As Per Jic Em-04-D-006.•Degutting Of Valves From Location•Shifting Of Valves From Location•Cleaning Of Valves•Replacement Of All O-Rings, Seats Of Valves.•Fitment Of Valves•Pneumatic Testing Of All Valves At 250 Bar•Pneumatic Testing Of Valves At 250 Bar For 05 Minutes•Shifting Of Valves To Onboard & Fitment.•Trials Of Valves Post Fitment In The System With The Boats Hp Air System , Services For Sea Water Circuit - Carryout Water Tightness Test Of The Nrv (En00130) As Per Jic En-06-D-010•Degutting Of Valves From Location•Shifting Of Valves From Location•Cleaning Of Valves•Replacement Of All O-Rings, Seats Of Valves.•Fitment Of Valve Shifting Of Valve To Onboard & Fitment.•Hydraulic Trials Of Valve At 52 Bar Post Fitment In The System With The Boats Hp Air System , Services For Sea Water Circuit - Inspection Of Nrv Pump Discharge En00020 And En00021 As Per Jic En-06-D-005.•Degutting Of Valves From Location•Shifting Of Valves From Location•Cleaning Of Valves•Replacement Of All O-Rings, Seats Of Valves.•Fitment Of Valves•Pneumatic Testing Of All Valves At 250 Bar•Neumatic Testing Of Valves At 250 Bar For 05 Minutes•Shifting Of Valves To Onboard & Fitment.•Trials Of Valves Post Fitment In The System With The Boats Hp Air System
Basic Detail
Tender No GEM/2026/B/7750940
Bidding Type Tender
Location
City Mumbai
State Maharashtra
Key Dates
Publish Date 10 Aug 2026
Submission Date 20 Aug 2026
Open Date 20 Aug 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 6.48 Lakhs
Exemption Not Available
Document List
cedde944-81f6-4120-8dfc-14d9a38d6532.pdf
1785752506.xlsx
1785752510.pdf
1785752513.pdf
FINAL_f4f5840e-95b7-44cb-86bc1785754127784_COM_FM.pdf
SafetyClau_c985c5b5-2db7-4427-a2461785752642152_COM_FM.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 10, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 20, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 6 days
Aug 20, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 6 days

Tender Documents

Download All (ZIP) ↓
pdf

cedde944-81f6-4120-8dfc-14d9a38d6532.pdf

xlsx

1785752506.xlsx

pdf

1785752510.pdf

pdf

1785752513.pdf

pdf

FINAL_f4f5840e-95b7-44cb-86bc1785754127784_COM_FM.pdf

pdf

SafetyClau_c985c5b5-2db7-4427-a2461785752642152_COM_FM.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders