Power Government Departments Closing in 1 days TDR #56930244

Bids Are invited for Custom Bid For Services - Increasing Capacity Of Distribution Transformers And Installation Work Of New Distribution Transformers On Semi-Turnkey Basis In Business Plan 2026- 27 Under The Area Of Edd, Kiraoli, Agra - Henlay Type

Issued by Government Departments · Agra, Uttar Pradesh
Tender Value
40.46 Lakhs
Estimated cost
Bid Submission
25 Aug 2026
1 days left
EMD
40500
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Agra → Uttar Pradesh
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Custom Bid For Services - Increasing Capacity Of Distribution Transformers And Installation Work Of New Distribution Transformers On Semi-Turnkey Basis In Business Plan 2026- 27 Under The Area Of Edd, Kiraoli, Agra - Henlay Type Tail Less Unit Protection Cubical Panel 500A, 650V For 250 Kva Dt , Copper L-Piece 50X225x10 Mm , Copper L-Piece 62X225x12 Mm , Al. Lug Long 400 Sqmm , Al. Lug Long 240 Sqmm , Alu. Lug 70 Sqmm , Cl For Distribution Box , Earth Wire Cl , Suspension Cl , Dead End Cl , Pg Cl , Cl For Piercing Connector , Lt Piercing Connector 50 Sqmm , Lt Piercing Connector 95 Sqmm , Lt Pvc Armed Cable 4X16 Sqmm , Danger Board , Barbed Wire , J Hook , Lt Incoming Pannel With Metering Equipment , Lt Pole Cl With Nut & Bolt , Dp Cl For 11 Kv , Eye Hook , Number Plate , Stone Pad , Ms Base Angle For Tf , Eye Bolts For Service Cables , Top Channel , Dropper Channel , Ms T-Off Channel , Lt 4 Core Mcb With Box , F-Cl , Cross Arm Cl , Holding Cl , Nut & Bolts , Gaurding Angle , Cl For Gaurding Angle , Cl For Lt T-Off With Nut & Bolt , Tf Cl , Alu. Paint , Red Oxide Paint , Carriage Of 16 Kva T/F From Store Center Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-70Kms.) , Carriage Of 25 Kva T/F From Store Center Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-70Kms.) , Carriage Of 63 Kva T/F From Store Center Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-70Kms.) , Carriage Of 100 Kva T/F From Store Center Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-70Kms.) , Carriage Of 250 Kva T/F From Store Center Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-70Kms.) , Carriage Of Pcc Pole 8.5 Mtr. Long. From Store Center Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-70Kms.) , Carriage Of St Pole 11 Mtr Long. From Store Center Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) , Cartiage Of Lt Xlpe Cable 1X400 Sqmm (200 Mtr.), Lt Xlpe Cable 1X240 Sqmm (2676 Mtr.), Lt Xlpe Cable 3.5X400 Sqmm (15 Mtr.), Alu. Cable 1X16 Sqmm (32 Mtr.), Lt Xlpe Cable Alu. 1X120 Sqmm (30 Mtr.), Lt Pvc Cable 3.5X150 Sqmm (154 Mtr.), Lt Pvc Cable 3.5X400 Sqmm (240 Mtr.) From Store Center Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-50Kms.) , Cartiage Of Line Material From Store Center Agra To Work Of Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-70Kms.) Line Material Viz. Tpmo (10), 11 Kv Fuse Set (15), Lt Fuse Set (5), Distribution Box (61), 11 Kv V Type X Arm (07), Stay Complete (60), 11 Kv Disc Insulator With Fitting (63), 11 Kv Pin Insulator With Pin & Nut (82), Earthing Complete (82), Weasol Conductor (1734), T Complete (2), Lt Abc 3X120 Sqmm (603 Mtr.), Lt Abc 3X95 Sqmm (439 Mtr.), Lt Abc 3X50 Sqmm (2590 Mtr.), Lt Abc 1X25 Sqmm (120 Mtr.), Gaurding Wire (66 Kg.) And Other Line Material, If Required In Estimate/Package. , Mounting Of 16 Kva T/F On Single/Double Pole In Proper Alignment Direction & Making Ht/Lt Connection As Per Site Requirment And Respo Norms. , Mounting Of 25 Kva T/F On Double Pole In Proper Alignment Direction & Making Ht/Lt Connection As Per Site Requirment And Respo Norms. , Mounting Of 63 Kva T/F On Double Pole In Proper Alignment Direction & Making Ht/Lt Connection As Per Site Requirment And Respo Norms. , Mounting Of 100 Kva T/F On Double Pole In Proper Alignment Direction & Making Ht/Lt Connection As Per Site Requirment And Respo Norms. , Installation Of 250 Kva T/F On Plinth In Proper Alignment Direction & Making Ht/Lt Connection As Per Site Requirment And Respo Norms. , Erection And Grouting Of Single Pole 8.5 Mtr. Long Pcc Poles In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Required Accessories As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Of Double Pole 8.5 Mtr. Long Pcc Pole In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Required Accessories As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Of Single Pole 11 Mtr. Long St Poles In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Required Accessories As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Of Double Pole 11 Mtr. Long St Pole In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Required Accessories As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Laying Sagging Stringing And Binding And Jumpering Of Lt Abc 1X25 Sqmm At 11 Kv/Lt Line As Per Respo Norms It Includes The Cost Of Labour, T & P Carrier Etc Required For Proper Completion Of Work. , Laying Sagging Stringing And Binding And Jumpering Of Lt Abc 3X50 Sqmm At 11 Kv/Lt Line As Per Respo Norms It Includes The Cost Of Labour, T & P Carrier Etc Required For Proper Completion Of Work. , Laying Sagging Stringing And Binding And Jumpering Of Lt Abc 3X95 Sqmm At 11 Kv/Lt Line As Per Respo Norms It Includes The Cost Of Labour, T & P Carrier Etc Required For Proper Completion Of Work. , Laying Sagging Stringing And Binding And Jumpering Of Lt Abc 3X120 Sqmm At 11 Kv/Lt Line As Per Respo Norms It Includes The Cost Of Labour, T & P Carrier Etc Required For Proper Completion Of Work. , Laying Of Lt Xlpe Alu. Cable 3.5X400 Sqmm As Per Respo Norms And Direction By Superivising Engineer. , Laying Of Lt Pvc Alu. Cable 3.5X150 Sqmm As Per Respo Norms And Direction By Superivising Engineer. , Laying Of Lt Pvc Cable 3.5X400 Sqmm As Per Respo Norms And Direction By Superivising Engineer. , Laying Of Lt Xlpe Cable 1X400 Sqmm As Per Respo Norms And Direction By Superivising Engineer. , Laying Of Lt Xlpe Cable 1X240 Sqmm As Per Respo Norms And Direction By Superivising Engineer. , Laying Of Alu. Cable 1X16 Sqmm As Per Respo Norms And Direction By Superivising Engineer. , Laying Of Lt Xlpe Alu. Cable 1X120 Sqmm As Per Respo Norms And Direction By Superivising Engineer. , Laying & Connecting Of Lt Pvc Armed Cable 4X16 Sqmm As Per Respo Norms And Direction By Superivising Engineer. , Erection And Grouting Of Stay Complete Ratio 1:2:4 (Cement, Sand And Bricks Balast) As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. Grouting Material I.E. Cement, Sand, Brick Ballast/Stone Ballast Etc. Shall Be Arranged By The Contractor At His Own Cost. , Fixing Of Earthing Complete As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Laying Sagging Stringing Binding And Jumpering Of Acsr Weasel Conductor At 11 Kv/Lt Line As Per Respo Norms It Includes The Cost Of Labour, T & P Carrier Etc Required For Proper Completion Of Work. , Installation Of 11 Kv Fuse Set As Per Respo Norms , Installation Of Distribution Box As Per Respo Norms , Fixing Of Tpmo With Polymer Insulator As Per Site Requirment And Respo Norms. , Construction Of Plinth For 250 Kva Transformer Of Size 5X5x4 Above The Ground Lable And 1 Feet Below The Ground. At The Bottom There Shall Be Cc Pad Of Brick Ballast Of Size 5X5x3 Thick In Ratio 1:3:6 [Cement, Sand And Brick Ballast]. The First Class Brick Wall Work Shall Be 9 Thick In Ratio 1:4 [Cement And Sand]. The Hollow Portion Among The Wall Shall Be Filled Up With The Brick Ballast. On The Top Of The Wall Of Plint There Shall Be Rcc Work In Ratio 1:3:6 [Cement, Sand And Grit Stone] By Using 12 Mm Dai Ms Bar At Distance Of 9. There Shall Be Plastering All Over The Plinth 12 Mm Thick In Ratio 1:4 [Cement And Sand] Above The Ground Level. Proper Watering And Curing Of The Plinth Shall Be Carried Out As Per Direction Of Supervising Engineer. , Fencing Of 250 Kva T/Fs As Per Following Specification -Fabrication Of 50X50x6 Mm Size Ms Angle Frame Of Size 3000X2400mm With 450 Mm Long Angle For Grouting The Frame And Fixing Of 2X1.5, 10 Swg Welded Wire Mesh With Ms Strip Of 24X5mm Size All Round The Frame And Drilling 9 Mm Holes Insides Of Frames At As Distance Of 300Mm For Jointing Of Frame With The Help Of Boslts And Nuts Including Cost Of Material. The Width Of Panal May Vary As Per Site Conditions, Grouting And Fixing Of Angle Iron Frames In Ratio 1:2:4 (Cement, Coarse Sand And Stone Ballast ) In The Pocket Of 150X150x150mm All Round The Plinth And Bolting Of Frames With 25X8 Mm Size Bolts And Nuts, Making Main Gate In Front Of The Plinth Of Size 3000X2400 Mm By Making Two Leaves Of Size 3000X1200mm Size And Grouting The Same In Ratio And Method Mentioned At Item (B) Above Fixing With Hinges With Dandlas For Locking System & Painting Of Entire Wire Mesh Angle Iron Etc. With Bus Green Super Enamelled Pain In Two Coats On The Primer Two Coats Of Red Oxide. , Earthing Of 250 Kva Distribution Transformer By Maintenance Free Earthing Electrods (Chemical) By Digging Pits 6 Dia 3Mtr. Deep Including Inserting Pipe In Pipe Technology Concept Involve Two Mild Steel Pipes One Inserted Inside The Other Of Size ;- 1. Inner Pip Dia Meter 50 Mm. 2. Outer Pipe Dia Meter 100 Mm. Length Of The Both Pipe Shall Be 3000 Mm. The M.S.Pipe Shall Be Isi Mark Of Class B As Per Is 1239. Thickness Of The Pipe Shall Be 12 Swg. The Empty Space In The Pipe Shall Be Filled With The Specially Developed Crystalline Material Conductiv Mixture Such As Copper And Aluminimum Powder.Conductive Carbon And Bonding Material Etc. Mixed In Diffrent Proportions. Conductive Mixture Contents Shall Be 70 % Carbon Powder & 30% Metal Powder Preferably Pure Copper Or Aluminum Material Along With The Required Quantity Of Bonding Materials. Granule Size Of The Carbon & Metal Powder Shall Be 100 Mesh. The Mixture If Forced (Pressurized) Inside The Earth Electrode In Empty Space Of Inner Pipe & In Empty Space Between The Inner & Outer Pipe Of The Earth Electrode, In Paste Form And After Soldification Of The Same The Bottom End Cap As Well As Top End Cap Is Provided. The Mixture Shall Be Pressed By Machine In The Pipe. Precaution Shall Be Taken Has To Have No Air Gap Inside The Pipe While Pressing. The Back Fill Compound (Earth Enhancment Material ) Shall Be Superior Conductive Material That Improves Earthing Effectiveness Especially In Areas Of Poor Conductivity Such As Rocky Ground, Sandy Soil & Areas Of Moisture Varation. It May Contain Conductive Cement (20%) Graphite Carbon Powder(50%), Hydrous Aluminum Siliacate (10%), Sodium Montmorillonite (20%) Etc. It Shall Be Placed Around Earth Electrode In The Earth Pit To Improve The Conductive Of Earth Electrode & Ground Contact Area. Mild Steel Electro Galavanized Flat 50X6 Mm Shall Welded To Earth Electrode Pips & Connected With Trasnformer Neutral And Body As Below With The Hlep Of Steel Nut & Bolt Or Through Welding As Per Requirment Of Site, To Gi Pipe And Filling Of Chemical Mixutre Around The Gi Pipe Upto 3 Mtr. Including Making Of Chamber & Connecting The Top Of The Inserted Pipe With Transformer Body & Neutral Through M.S.Flat 50X6mm With The Help Of Nut & Bolt Or Through Welding And Making A Main Hole Of Size 2×2 And Covering The Same By A Stone Pad For The Purpose Of Poring Water For Moisture. , Concreting Of Stay , Guarding Of Ht Line By Laying, Stringing, Sagging And Binding Of 2 Nos. Parallel Gi Wire 6/8 Swg Including Fabrication And Fixing Of Guarding Angle With Holding Cl S And Fabrication And Fixing Of X-Guards (Tillis) Of Gi Wire At Distance Of 3 Mtr. Including The Cost Of Arrangement Of Abour, T&P Etc.Required For Proper Completion Of Work. , Surface Preparation For Painting On St Poles Including Cleaning, Sanding And Single Coat Of Red Oxide Paint As Per Respo Norms And Direction By Supervising Engineer. , Surface Preparation For Painting On St Poles Including Cleaning, Sanding And Double Coat Of Alu. Paint As Per Respo Norms And Direction By Supervising Engineer. , Dismentling & Removal Of 10 Kva T/F-(01 Nos.) & 16 Kva T/F (02 Nos) And Receive Back To Store Center Agra (Apprx 00-70 Km) , Dismentling & Removal Of 100 Kva T/F And Receive Back To Store Center Agra (Apprx 00-70 Km)

BOQ

Sl. No. Item TitleItem Description
1Henlay type Tail less Unit protection cubical panel 500A, 650V for 250 KVA DTHenlay type Tail less Unit protection cubical panel 500A, 650V for 250 KVA DT
2Copper L-Piece 50x225x10 MMCopper L-Piece 50x225x10 MM
3Copper L-Piece 62x225x12 MMCopper L-Piece 62x225x12 MM
4Al. Lug long 400 SQMMAl. Lug long 400 SQMM
5Al. Lug long 240 SQMMAl. Lug long 240 SQMM
6Alu. Lug 70 sqmmAlu. Lug 70 sqmm
7Clamp for Distribution BoxClamp for Distribution Box
8Earth Wire ClampEarth Wire Clamp
9Suspension clampSuspension clamp
10Dead End ClampDead End Clamp
11PG ClampPG Clamp
12Clamp for Piercing ConnectorClamp for Piercing Connector
13LT Piercing Connector 50 SQMMLT Piercing Connector 50 SQMM
14LT Piercing Connector 95 SQMMLT Piercing Connector 95 SQMM
15LT PVC Armed Cable 4x16 sqmmLT PVC Armed Cable 4x16 sqmm
16Danger BoardDanger Board
17Barbed WireBarbed Wire
18J HookJ Hook
19LT Incoming Pannel with metering equipmentLT Incoming Pannel with metering equipment
20LT Pole Clamp with nut & boltLT Pole Clamp with nut & bolt
21DP Clamp for 11 KVDP Clamp for 11 KV
22Eye HookEye Hook
23Number PlateNumber Plate
24Stone PadStone Pad
25MS Base Angle for TFMS Base Angle for TF
26Eye Bolts for service cablesEye Bolts for service cables
27Top ChannelTop Channel
28Dropper ChannelDropper Channel
29MS T-Off ChannelMS T-Off Channel
30LT 4 core MCB with boxLT 4 core MCB with box
31F-ClampF-Clamp
32Cross Arm ClampCross Arm Clamp
33Holding ClampHolding Clamp
34Nut & BoltsNut & Bolts
35Gaurding AngleGaurding Angle
36Clamp for Gaurding angleClamp for Gaurding angle
37Clamp for LT T-off with nut & boltClamp for LT T-off with nut & bolt
38TF ClampTF Clamp
39Alu. PaintAlu. Paint
40Red Oxide PaintRed Oxide Paint
41Carriage of 16 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)Carriage of 16 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)
42Carriage of 25 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)Carriage of 25 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)
43Carriage of 63 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)Carriage of 63 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)
44Carriage of 100 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)Carriage of 100 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)
45Carriage of 250 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)Carriage of 250 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)
46Carriage of PCC Pole 8.5 Mtr. Long. from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)Carriage of PCC Pole 8.5 Mtr. Long. from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)
47Carriage of ST Pole 11 Mtr Long. from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.)Carriage of ST Pole 11 Mtr Long. from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.)
48Cartiage of LT XLPE Cable 1x400 sqmm (200 Mtr.), LT XLPE Cable 1x240 sqmm (2676 Mtr.), LT XLPE Cable 3.5x400 sqmm (15 Mtr.), Alu. Cable 1x16 sqmm (32 Mtr.), LT XLPE Cable Alu. 1x120 sqmm (30 Mtr.), LT PVC Cable 3.5x150 sqmm (154 Mtr.), LT PVC Cable 3.5x400 sqmm (240 Mtr.) from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)Cartiage of LT XLPE Cable 1x400 sqmm (200 Mtr.), LT XLPE Cable 1x240 sqmm (2676 Mtr.), LT XLPE Cable 3.5x400 sqmm (15 Mtr.), Alu. Cable 1x16 sqmm (32 Mtr.), LT XLPE Cable Alu. 1x120 sqmm (30 Mtr.), LT PVC Cable 3.5x150 sqmm (154 Mtr.), LT PVC Cable 3.5x400 sqmm (240 Mtr.) from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)
49Cartiage of Line Material from Store Center Agra to work of site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) Line material viz. TPMO (10), 11 KV Fuse set (15), LT Fuse Set (5), Distribution Box (61), 11 KV V Type X Arm (07), Stay Complete (60), 11 KV Disc Insulator with fitting (63), 11 KV Pin Insulator with Pin & Nut (82), Earthing Complete (82), Weasol Conductor (1734), T Complete (2), LT ABC 3x120 sqmm (603 Mtr.), LT ABC 3x95 sqmm (439 Mtr.), LT ABC 3x50 sqmm (2590 Mtr.), LT ABC 1x25 sqmm (120 Mtr.), Gaurding wire (66 Kg.) and other line material, if required in Estimate/Package.Cartiage of Line Material from Store Center Agra to work of site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) Line material viz. TPMO (10), 11 KV Fuse set (15), LT Fuse Set (5), Distribution Box (61), 11 KV V Type X Arm (07), Stay Complete (60), 11 KV Disc Insulator with fitting (63), 11 KV Pin Insulator with Pin & Nut (82), Earthing Complete (82), Weasol Conductor (1734), T Complete (2), LT ABC 3x120 sqmm (603 Mtr.), LT ABC 3x95 sqmm (439 Mtr.), LT ABC 3x50 sqmm (2590 Mtr.), LT ABC 1x25 sqmm (120 Mtr.), Gaurding wire (66 Kg.) and other line material, if required in Estimate/Package.
50Mounting of 16 KVA T/F on single/double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.Mounting of 16 KVA T/F on single/double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.
51Mounting of 25 KVA T/F on double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.Mounting of 25 KVA T/F on double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.
52Mounting of 63 KVA T/F on double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.Mounting of 63 KVA T/F on double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.
53Mounting of 100 KVA T/F on double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.Mounting of 100 KVA T/F on double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.
54Installation of 250 KVA T/F on Plinth in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.Installation of 250 KVA T/F on Plinth in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.
55Erection and grouting of Single Pole 8.5 Mtr. long PCC poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all required accessories as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting of Single Pole 8.5 Mtr. long PCC poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all required accessories as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
56Erection and grouting of Double Pole 8.5 Mtr. long PCC Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all required accessories as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting of Double Pole 8.5 Mtr. long PCC Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all required accessories as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
57Erection and grouting of Single Pole 11 Mtr. long ST poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all required accessories as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting of Single Pole 11 Mtr. long ST poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all required accessories as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
58Erection and grouting of Double Pole 11 Mtr. long ST Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all required accessories as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting of Double Pole 11 Mtr. long ST Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all required accessories as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
59Laying sagging stringing and binding and jumpering of LT ABC 1x25 sqmm at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.Laying sagging stringing and binding and jumpering of LT ABC 1x25 sqmm at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.
60Laying sagging stringing and binding and jumpering of LT ABC 3x50 sqmm at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.Laying sagging stringing and binding and jumpering of LT ABC 3x50 sqmm at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.
61Laying sagging stringing and binding and jumpering of LT ABC 3x95 sqmm at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.Laying sagging stringing and binding and jumpering of LT ABC 3x95 sqmm at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.
62Laying sagging stringing and binding and jumpering of LT ABC 3x120 sqmm at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.Laying sagging stringing and binding and jumpering of LT ABC 3x120 sqmm at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.
63Laying of LT XLPE Alu. Cable 3.5x400 sqmm as per RESPO Norms and direction by superivising Engineer.Laying of LT XLPE Alu. Cable 3.5x400 sqmm as per RESPO Norms and direction by superivising Engineer.
64Laying of LT PVC Alu. Cable 3.5x150 sqmm as per RESPO Norms and direction by superivising Engineer.Laying of LT PVC Alu. Cable 3.5x150 sqmm as per RESPO Norms and direction by superivising Engineer.
65Laying of LT PVC Cable 3.5x400 sqmm as per RESPO Norms and direction by superivising Engineer.Laying of LT PVC Cable 3.5x400 sqmm as per RESPO Norms and direction by superivising Engineer.
66Laying of LT XLPE Cable 1x400 sqmm as per RESPO Norms and direction by superivising Engineer.Laying of LT XLPE Cable 1x400 sqmm as per RESPO Norms and direction by superivising Engineer.
67Laying of LT XLPE Cable 1x240 sqmm as per RESPO Norms and direction by superivising Engineer.Laying of LT XLPE Cable 1x240 sqmm as per RESPO Norms and direction by superivising Engineer.
68Laying of Alu. Cable 1x16 sqmm as per RESPO Norms and direction by superivising Engineer.Laying of Alu. Cable 1x16 sqmm as per RESPO Norms and direction by superivising Engineer.
69Laying of LT XLPE Alu. Cable 1x120 sqmm as per RESPO Norms and direction by superivising Engineer.Laying of LT XLPE Alu. Cable 1x120 sqmm as per RESPO Norms and direction by superivising Engineer.
70Laying & Connecting of LT PVC Armed Cable 4x16 sqmm as per RESPO Norms and direction by superivising Engineer.Laying & Connecting of LT PVC Armed Cable 4x16 sqmm as per RESPO Norms and direction by superivising Engineer.
71Erection and grouting of stay complete ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.Erection and grouting of stay complete ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
72Fixing of earthing Complete as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.Fixing of earthing Complete as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
73Laying sagging stringing binding and jumpering of ACSR Weasel Conductor at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.Laying sagging stringing binding and jumpering of ACSR Weasel Conductor at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.
74Installation of 11 KV Fuse set as per RESPO NORMSInstallation of 11 KV Fuse set as per RESPO NORMS
75Installation of Distribution Box as per RESPO NORMSInstallation of Distribution Box as per RESPO NORMS
76Fixing of TPMO with Polymer insulator as per Site requirment and RESPO Norms.Fixing of TPMO with Polymer insulator as per Site requirment and RESPO Norms.
77Construction of plinth for 250 KVA Transformer of size 5’x5’x4’ above the ground lable and 1 feet below the ground. At the bottom there shall be CC pad of brick ballast of size 5x5’x3” thick in ratio 1:3:6 [Cement, sand and brick ballast]. The first class brick wall work shall be 9” thick in ratio 1:4 [Cement and sand]. The hollow portion among the wall shall be filled up with the brick ballast. On the top of the wall of plint there shall be RCC work in ratio 1:3:6 [Cement, Sand and grit stone] by using 12 mm dai MS bar at distance of 9’’. There shall be plastering all over the plinth 12 mm thick in ratio 1:4 [Cement and sand] above the ground level. Proper watering and curing of the plinth shall be carried out as per direction of supervising engineer.Construction of plinth for 250 KVA Transformer of size 5’x5’x4’ above the ground lable and 1 feet below the ground. At the bottom there shall be CC pad of brick ballast of size 5x5’x3” thick in ratio 1:3:6 [Cement, sand and brick ballast]. The first class brick wall work shall be 9” thick in ratio 1:4 [Cement and sand]. The hollow portion among the wall shall be filled up with the brick ballast. On the top of the wall of plint there shall be RCC work in ratio 1:3:6 [Cement, Sand and grit stone] by using 12 mm dai MS bar at distance of 9’’. There shall be plastering all over the plinth 12 mm thick in ratio 1:4 [Cement and sand] above the ground level. Proper watering and curing of the plinth shall be carried out as per direction of supervising engineer.
78Fencing of 250 KVA T/Fs as per following specification -Fabrication of 50x50x6 mm size MS Angle frame of size 3000x2400mm with 450 mm long angle for grouting the frame and fixing of 2\\"x1.5\\", 10 SWG welded wire mesh with MS strip of 24x5mm size all round the frame and drilling 9 mm holes insides of frames at as distance of 300mm for jointing of frame with the help of boslts and nuts including cost of material. The width of panal may vary as per site conditions, Grouting and fixing of angle iron frames in ratio 1:2:4 (cement, coarse sand and stone ballast ) in the pocket of 150x150x150mm all round the plinth and bolting of frames with 25x8 mm size bolts and nuts, Making main gate in front of the plinth of size 3000x2400 mm by making two leaves of size 3000x1200mm size and grouting the same in ratio and method mentioned at item (b) above fixing with hinges with dandlas for locking system & Painting of entire wire mesh angle iron etc. with Bus Green super enamelled pain in two coats on the primer two coats of Red oxide.Fencing of 250 KVA T/Fs as per following specification -Fabrication of 50x50x6 mm size MS Angle frame of size 3000x2400mm with 450 mm long angle for grouting the frame and fixing of 2\\"x1.5\\", 10 SWG welded wire mesh with MS strip of 24x5mm size all round the frame and drilling 9 mm holes insides of frames at as distance of 300mm for jointing of frame with the help of boslts and nuts including cost of material. The width of panal may vary as per site conditions, Grouting and fixing of angle iron frames in ratio 1:2:4 (cement, coarse sand and stone ballast ) in the pocket of 150x150x150mm all round the plinth and bolting of frames with 25x8 mm size bolts and nuts, Making main gate in front of the plinth of size 3000x2400 mm by making two leaves of size 3000x1200mm size and grouting the same in ratio and method mentioned at item (b) above fixing with hinges with dandlas for locking system & Painting of entire wire mesh angle iron etc. with Bus Green super enamelled pain in two coats on the primer two coats of Red oxide.
79Earthing of 250 KVA distribution transformer by maintenance free Earthing Electrods (Chemical) by digging pits 6\\" dia 3mtr. deep including inserting pipe in pipe technology concept involve two mild steel pipes one inserted inside the other of size ;- 1. Inner pip dia meter 50 Mm. 2. outer pipe dia meter 100 mm. length of the both pipe shall be 3000 mm. The M.S.pipe shall be ISI mark of class B as per IS 1239. Thickness of the pipe shall be 12 swg. The empty space in the pipe shall be filled with the specially developed crystalline material conductiv mixture such as copper and aluminimum powder.conductive carbon and bonding material etc. mixed in diffrent proportions. Conductive mixture contents shall be 70 % carbon powder & 30% metal powder preferably pure copper or aluminum material along with the required quantity of bonding materials. Granule size of the carbon & metal powder shall be 100 mesh. The mixture if forced (pressurized) inside the earth electrode in empty space of inner pipe & in empty space between the inner & outer pipe of the earth electrode, in paste form and after soldification of the same the bottom end cap as well as top end cap is provided. The mixture shall be pressed by machine in the pipe. Precaution shall be taken has to have no air gap inside the pipe while pressing. The back fill compound (earth enhancment material ) shall be superior conductive material that improves earthing effectiveness especially in areas of poor conductivity such as rocky ground, sandy soil & areas of moisture varation. It may contain conductive cement (20%) graphite carbon powder(50%), hydrous aluminum siliacate (10%), Sodium montmorillonite (20%) etc. it shall be placed around earth electrode in the earth pit to improve the conductive of earth electrode & ground contact area. Mild steel electro galavanized Flat 50x6 mm shall welded to earth electrode pips & connected with Trasnformer neutral and body as below with the hlep of steel nut & bolt or through welding as per requirment of site, to GI pipe and filling of chemical mixutre around the GI pipe upto 3 mtr. including making of chamber & connecting the top of the inserted pipe with transformer body & neutral through M.S.flat 50x6mm with the help of nut & bolt or through welding and making a main hole of size 2'×2' and covering the same by a stone pad for the purpose of poring water for moisture.Earthing of 250 KVA distribution transformer by maintenance free Earthing Electrods (Chemical) by digging pits 6\\" dia 3mtr. deep including inserting pipe in pipe technology concept involve two mild steel pipes one inserted inside the other of size ;- 1. Inner pip dia meter 50 Mm. 2. outer pipe dia meter 100 mm. length of the both pipe shall be 3000 mm. The M.S.pipe shall be ISI mark of class B as per IS 1239. Thickness of the pipe shall be 12 swg. The empty space in the pipe shall be filled with the specially developed crystalline material conductiv mixture such as copper and aluminimum powder.conductive carbon and bonding material etc. mixed in diffrent proportions. Conductive mixture contents shall be 70 % carbon powder & 30% metal powder preferably pure copper or aluminum material along with the required quantity of bonding materials. Granule size of the carbon & metal powder shall be 100 mesh. The mixture if forced (pressurized) inside the earth electrode in empty space of inner pipe & in empty space between the inner & outer pipe of the earth electrode, in paste form and after soldification of the same the bottom end cap as well as top end cap is provided. The mixture shall be pressed by machine in the pipe. Precaution shall be taken has to have no air gap inside the pipe while pressing. The back fill compound (earth enhancment material ) shall be superior conductive material that improves earthing effectiveness especially in areas of poor conductivity such as rocky ground, sandy soil & areas of moisture varation. It may contain conductive cement (20%) graphite carbon powder(50%), hydrous aluminum siliacate (10%), Sodium montmorillonite (20%) etc. it shall be placed around earth electrode in the earth pit to improve the conductive of earth electrode & ground contact area. Mild steel electro galavanized Flat 50x6 mm shall welded to earth electrode pips & connected with Trasnformer neutral and body as below with the hlep of steel nut & bolt or through welding as per requirment of site, to GI pipe and filling of chemical mixutre around the GI pipe upto 3 mtr. including making of chamber & connecting the top of the inserted pipe with transformer body & neutral through M.S.flat 50x6mm with the help of nut & bolt or through welding and making a main hole of size 2'×2' and covering the same by a stone pad for the purpose of poring water for moisture.
80Concreting of StayConcreting of Stay
81Guarding of HT line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6/8 SWG including fabrication and fixing of guarding angle with holding clamps and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. including the cost of arrangement of abour, T&P etc.required for proper completion of work.Guarding of HT line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6/8 SWG including fabrication and fixing of guarding angle with holding clamps and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. including the cost of arrangement of abour, T&P etc.required for proper completion of work.
82Surface Preparation for Painting on ST Poles including cleaning, sanding and single coat of Red Oxide Paint as per RESPO norms and direction by supervising engineer.Surface Preparation for Painting on ST Poles including cleaning, sanding and single coat of Red Oxide Paint as per RESPO norms and direction by supervising engineer.
83Surface Preparation for Painting on ST Poles including cleaning, sanding and double coat of Alu. Paint as per RESPO norms and direction by supervising engineer.Surface Preparation for Painting on ST Poles including cleaning, sanding and double coat of Alu. Paint as per RESPO norms and direction by supervising engineer.
84Dismentling & Removal of 10 KVA T/F-(01 Nos.) & 16 KVA T/F (02 Nos) and receive back to store center agra (Apprx 00-70 KM)Dismentling & Removal of 10 KVA T/F-(01 Nos.) & 16 KVA T/F (02 Nos) and receive back to store center agra (Apprx 00-70 KM)
85Dismentling & Removal of 100 KVA T/F and receive back to store center agra (Apprx 00-70 KM)Dismentling & Removal of 100 KVA T/F and receive back to store center agra (Apprx 00-70 KM)

AI Tender Summary

OUR REF NO 56930244
AUTHORITY Government Departments
TENDER VALUE 40.46 Lakhs
LAST DATE 25-08-2026
Authority
Authority Name Uttar Pradesh Power Corporation Limited
Work Description Bids Are invited for Custom Bid For Services - Increasing Capacity Of Distribution Transformers And Installation Work Of New Distribution Transformers On Semi-Turnkey Basis In Business Plan 2026- 27 Under The Area Of Edd, Kiraoli, Agra - Henlay Type Tail Less Unit Protection Cubical Panel 500A, 650V For 250 Kva Dt , Copper L-Piece 50X225x10 Mm , Copper L-Piece 62X225x12 Mm , Al. Lug Long 400 Sqmm , Al. Lug Long 240 Sqmm , Alu. Lug 70 Sqmm , Cl For Distribution Box , Earth Wire Cl , Suspension Cl , Dead End Cl , Pg Cl , Cl For Piercing Connector , Lt Piercing Connector 50 Sqmm , Lt Piercing Connector 95 Sqmm , Lt Pvc Armed Cable 4X16 Sqmm , Danger Board , Barbed Wire , J Hook , Lt Incoming Pannel With Metering Equipment , Lt Pole Cl With Nut & Bolt , Dp Cl For 11 Kv , Eye Hook , Number Plate , Stone Pad , Ms Base Angle For Tf , Eye Bolts For Service Cables , Top Channel , Dropper Channel , Ms T-Off Channel , Lt 4 Core Mcb With Box , F-Cl , Cross Arm Cl , Holding Cl , Nut & Bolts , Gaurding Angle , Cl For Gaurding Angle , Cl For Lt T-Off With Nut & Bolt , Tf Cl , Alu. Paint , Red Oxide Paint , Carriage Of 16 Kva T/F From Store Center Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-70Kms.) , Carriage Of 25 Kva T/F From Store Center Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-70Kms.) , Carriage Of 63 Kva T/F From Store Center Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-70Kms.) , Carriage Of 100 Kva T/F From Store Center Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-70Kms.) , Carriage Of 250 Kva T/F From Store Center Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-70Kms.) , Carriage Of Pcc Pole 8.5 Mtr. Long. From Store Center Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-70Kms.) , Carriage Of St Pole 11 Mtr Long. From Store Center Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) , Cartiage Of Lt Xlpe Cable 1X400 Sqmm (200 Mtr.), Lt Xlpe Cable 1X240 Sqmm (2676 Mtr.), Lt Xlpe Cable 3.5X400 Sqmm (15 Mtr.), Alu. Cable 1X16 Sqmm (32 Mtr.), Lt Xlpe Cable Alu. 1X120 Sqmm (30 Mtr.), Lt Pvc Cable 3.5X150 Sqmm (154 Mtr.), Lt Pvc Cable 3.5X400 Sqmm (240 Mtr.) From Store Center Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-50Kms.) , Cartiage Of Line Material From Store Center Agra To Work Of Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-70Kms.) Line Material Viz. Tpmo (10), 11 Kv Fuse Set (15), Lt Fuse Set (5), Distribution Box (61), 11 Kv V Type X Arm (07), Stay Complete (60), 11 Kv Disc Insulator With Fitting (63), 11 Kv Pin Insulator With Pin & Nut (82), Earthing Complete (82), Weasol Conductor (1734), T Complete (2), Lt Abc 3X120 Sqmm (603 Mtr.), Lt Abc 3X95 Sqmm (439 Mtr.), Lt Abc 3X50 Sqmm (2590 Mtr.), Lt Abc 1X25 Sqmm (120 Mtr.), Gaurding Wire (66 Kg.) And Other Line Material, If Required In Estimate/Package. , Mounting Of 16 Kva T/F On Single/Double Pole In Proper Alignment Direction & Making Ht/Lt Connection As Per Site Requirment And Respo Norms. , Mounting Of 25 Kva T/F On Double Pole In Proper Alignment Direction & Making Ht/Lt Connection As Per Site Requirment And Respo Norms. , Mounting Of 63 Kva T/F On Double Pole In Proper Alignment Direction & Making Ht/Lt Connection As Per Site Requirment And Respo Norms. , Mounting Of 100 Kva T/F On Double Pole In Proper Alignment Direction & Making Ht/Lt Connection As Per Site Requirment And Respo Norms. , Installation Of 250 Kva T/F On Plinth In Proper Alignment Direction & Making Ht/Lt Connection As Per Site Requirment And Respo Norms. , Erection And Grouting Of Single Pole 8.5 Mtr. Long Pcc Poles In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Required Accessories As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Of Double Pole 8.5 Mtr. Long Pcc Pole In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Required Accessories As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Of Single Pole 11 Mtr. Long St Poles In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Required Accessories As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Of Double Pole 11 Mtr. Long St Pole In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Required Accessories As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Laying Sagging Stringing And Binding And Jumpering Of Lt Abc 1X25 Sqmm At 11 Kv/Lt Line As Per Respo Norms It Includes The Cost Of Labour, T & P Carrier Etc Required For Proper Completion Of Work. , Laying Sagging Stringing And Binding And Jumpering Of Lt Abc 3X50 Sqmm At 11 Kv/Lt Line As Per Respo Norms It Includes The Cost Of Labour, T & P Carrier Etc Required For Proper Completion Of Work. , Laying Sagging Stringing And Binding And Jumpering Of Lt Abc 3X95 Sqmm At 11 Kv/Lt Line As Per Respo Norms It Includes The Cost Of Labour, T & P Carrier Etc Required For Proper Completion Of Work. , Laying Sagging Stringing And Binding And Jumpering Of Lt Abc 3X120 Sqmm At 11 Kv/Lt Line As Per Respo Norms It Includes The Cost Of Labour, T & P Carrier Etc Required For Proper Completion Of Work. , Laying Of Lt Xlpe Alu. Cable 3.5X400 Sqmm As Per Respo Norms And Direction By Superivising Engineer. , Laying Of Lt Pvc Alu. Cable 3.5X150 Sqmm As Per Respo Norms And Direction By Superivising Engineer. , Laying Of Lt Pvc Cable 3.5X400 Sqmm As Per Respo Norms And Direction By Superivising Engineer. , Laying Of Lt Xlpe Cable 1X400 Sqmm As Per Respo Norms And Direction By Superivising Engineer. , Laying Of Lt Xlpe Cable 1X240 Sqmm As Per Respo Norms And Direction By Superivising Engineer. , Laying Of Alu. Cable 1X16 Sqmm As Per Respo Norms And Direction By Superivising Engineer. , Laying Of Lt Xlpe Alu. Cable 1X120 Sqmm As Per Respo Norms And Direction By Superivising Engineer. , Laying & Connecting Of Lt Pvc Armed Cable 4X16 Sqmm As Per Respo Norms And Direction By Superivising Engineer. , Erection And Grouting Of Stay Complete Ratio 1:2:4 (Cement, Sand And Bricks Balast) As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. Grouting Material I.E. Cement, Sand, Brick Ballast/Stone Ballast Etc. Shall Be Arranged By The Contractor At His Own Cost. , Fixing Of Earthing Complete As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Laying Sagging Stringing Binding And Jumpering Of Acsr Weasel Conductor At 11 Kv/Lt Line As Per Respo Norms It Includes The Cost Of Labour, T & P Carrier Etc Required For Proper Completion Of Work. , Installation Of 11 Kv Fuse Set As Per Respo Norms , Installation Of Distribution Box As Per Respo Norms , Fixing Of Tpmo With Polymer Insulator As Per Site Requirment And Respo Norms. , Construction Of Plinth For 250 Kva Transformer Of Size 5X5x4 Above The Ground Lable And 1 Feet Below The Ground. At The Bottom There Shall Be Cc Pad Of Brick Ballast Of Size 5X5x3 Thick In Ratio 1:3:6 [Cement, Sand And Brick Ballast]. The First Class Brick Wall Work Shall Be 9 Thick In Ratio 1:4 [Cement And Sand]. The Hollow Portion Among The Wall Shall Be Filled Up With The Brick Ballast. On The Top Of The Wall Of Plint There Shall Be Rcc Work In Ratio 1:3:6 [Cement, Sand And Grit Stone] By Using 12 Mm Dai Ms Bar At Distance Of 9. There Shall Be Plastering All Over The Plinth 12 Mm Thick In Ratio 1:4 [Cement And Sand] Above The Ground Level. Proper Watering And Curing Of The Plinth Shall Be Carried Out As Per Direction Of Supervising Engineer. , Fencing Of 250 Kva T/Fs As Per Following Specification -Fabrication Of 50X50x6 Mm Size Ms Angle Frame Of Size 3000X2400mm With 450 Mm Long Angle For Grouting The Frame And Fixing Of 2X1.5, 10 Swg Welded Wire Mesh With Ms Strip Of 24X5mm Size All Round The Frame And Drilling 9 Mm Holes Insides Of Frames At As Distance Of 300Mm For Jointing Of Frame With The Help Of Boslts And Nuts Including Cost Of Material. The Width Of Panal May Vary As Per Site Conditions, Grouting And Fixing Of Angle Iron Frames In Ratio 1:2:4 (Cement, Coarse Sand And Stone Ballast ) In The Pocket Of 150X150x150mm All Round The Plinth And Bolting Of Frames With 25X8 Mm Size Bolts And Nuts, Making Main Gate In Front Of The Plinth Of Size 3000X2400 Mm By Making Two Leaves Of Size 3000X1200mm Size And Grouting The Same In Ratio And Method Mentioned At Item (B) Above Fixing With Hinges With Dandlas For Locking System & Painting Of Entire Wire Mesh Angle Iron Etc. With Bus Green Super Enamelled Pain In Two Coats On The Primer Two Coats Of Red Oxide. , Earthing Of 250 Kva Distribution Transformer By Maintenance Free Earthing Electrods (Chemical) By Digging Pits 6 Dia 3Mtr. Deep Including Inserting Pipe In Pipe Technology Concept Involve Two Mild Steel Pipes One Inserted Inside The Other Of Size ;- 1. Inner Pip Dia Meter 50 Mm. 2. Outer Pipe Dia Meter 100 Mm. Length Of The Both Pipe Shall Be 3000 Mm. The M.S.Pipe Shall Be Isi Mark Of Class B As Per Is 1239. Thickness Of The Pipe Shall Be 12 Swg. The Empty Space In The Pipe Shall Be Filled With The Specially Developed Crystalline Material Conductiv Mixture Such As Copper And Aluminimum Powder.Conductive Carbon And Bonding Material Etc. Mixed In Diffrent Proportions. Conductive Mixture Contents Shall Be 70 % Carbon Powder & 30% Metal Powder Preferably Pure Copper Or Aluminum Material Along With The Required Quantity Of Bonding Materials. Granule Size Of The Carbon & Metal Powder Shall Be 100 Mesh. The Mixture If Forced (Pressurized) Inside The Earth Electrode In Empty Space Of Inner Pipe & In Empty Space Between The Inner & Outer Pipe Of The Earth Electrode, In Paste Form And After Soldification Of The Same The Bottom End Cap As Well As Top End Cap Is Provided. The Mixture Shall Be Pressed By Machine In The Pipe. Precaution Shall Be Taken Has To Have No Air Gap Inside The Pipe While Pressing. The Back Fill Compound (Earth Enhancment Material ) Shall Be Superior Conductive Material That Improves Earthing Effectiveness Especially In Areas Of Poor Conductivity Such As Rocky Ground, Sandy Soil & Areas Of Moisture Varation. It May Contain Conductive Cement (20%) Graphite Carbon Powder(50%), Hydrous Aluminum Siliacate (10%), Sodium Montmorillonite (20%) Etc. It Shall Be Placed Around Earth Electrode In The Earth Pit To Improve The Conductive Of Earth Electrode & Ground Contact Area. Mild Steel Electro Galavanized Flat 50X6 Mm Shall Welded To Earth Electrode Pips & Connected With Trasnformer Neutral And Body As Below With The Hlep Of Steel Nut & Bolt Or Through Welding As Per Requirment Of Site, To Gi Pipe And Filling Of Chemical Mixutre Around The Gi Pipe Upto 3 Mtr. Including Making Of Chamber & Connecting The Top Of The Inserted Pipe With Transformer Body & Neutral Through M.S.Flat 50X6mm With The Help Of Nut & Bolt Or Through Welding And Making A Main Hole Of Size 2×2 And Covering The Same By A Stone Pad For The Purpose Of Poring Water For Moisture. , Concreting Of Stay , Guarding Of Ht Line By Laying, Stringing, Sagging And Binding Of 2 Nos. Parallel Gi Wire 6/8 Swg Including Fabrication And Fixing Of Guarding Angle With Holding Cl S And Fabrication And Fixing Of X-Guards (Tillis) Of Gi Wire At Distance Of 3 Mtr. Including The Cost Of Arrangement Of Abour, T&P Etc.Required For Proper Completion Of Work. , Surface Preparation For Painting On St Poles Including Cleaning, Sanding And Single Coat Of Red Oxide Paint As Per Respo Norms And Direction By Supervising Engineer. , Surface Preparation For Painting On St Poles Including Cleaning, Sanding And Double Coat Of Alu. Paint As Per Respo Norms And Direction By Supervising Engineer. , Dismentling & Removal Of 10 Kva T/F-(01 Nos.) & 16 Kva T/F (02 Nos) And Receive Back To Store Center Agra (Apprx 00-70 Km) , Dismentling & Removal Of 100 Kva T/F And Receive Back To Store Center Agra (Apprx 00-70 Km)
Basic Detail
Tender No GEM/2026/B/7890023
Bidding Type Tender
Location
City Agra
State Uttar Pradesh
Key Dates
Publish Date 10 Aug 2026
Submission Date 25 Aug 2026
Open Date 25 Aug 2026
Finance
Tender Value 40.46 Lakhs
Tender Fee Ref. Documents
EMD 40500
Exemption Not Available
Document List
a7703ecf-4477-46de-ad98-c6c470c864df.pdf
1786091384.xlsx
1786091477.pdf
1786091480.pdf
1786091486.pdf
1786091492.pdf
1786091580.pdf
1786091609.pdf
1786091621.pdf
ATC_19b317a4-631c-450d-be441786092670819_EDC1AGRABUYER.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 10, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 25, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 1 day
Aug 25, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 1 day

Tender Documents

Download All (ZIP) ↓
pdf

a7703ecf-4477-46de-ad98-c6c470c864df.pdf

xlsx

1786091384.xlsx

pdf

1786091477.pdf

pdf

1786091480.pdf

pdf

1786091486.pdf

pdf

1786091492.pdf

pdf

1786091580.pdf

pdf

1786091609.pdf

pdf

1786091621.pdf

pdf

ATC_19b317a4-631c-450d-be441786092670819_EDC1AGRABUYER.pdf