Tender For Repair/ Maintenance Of Overhauling Of 25 Kva, 62.5 Kva, 30 Kva, 10 Kva Dg Set At No 4 Maintenance Group Assam Rifles (South) At Maram.
Tender Value
2.99 Lakhs
Estimated cost
Bid Submission
24 Aug 2026
12 days left
EMD
6000
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Senapati → Manipur
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Repair/ Maintenance Of Overhauling Of 25 Kva, 62.5 Kva, 30 Kva, 10 Kva Dg Set At No 4 Maintenance Group Assam Rifles (South) At Maram.
BOQ
| Sl. No. | Item Description |
| 1 | SCHEDULE ‘A’ PART-I Overhauling of 25 KVA DG Set |
| 2 | Piston with piston ring |
| 3 | Gas kit |
| 4 | Replacement of nozzle |
| 5 | Replacement of oil filter |
| 6 | Replacement of fuel filter |
| 7 | Replacement of air filter |
| 8 | Replacement of engine oil |
| 9 | Replacement of coolant |
| 10 | Cleaning of Radiator & installation |
| 11 | Labour charge including testing of the engine after major overhauling |
| 12 | Overhauling of 62.5 KVA DG Set |
| 13 | Replacement of nozzle |
| 14 | Gas kit |
| 15 | Replacement of fuel filter |
| 16 | Replacement of air filter |
| 17 | Replacement of engine oil |
| 18 | Replacement of coolant |
| 19 | Cleaning of Radiator & installation |
| 20 | Replacement of fan belt of Radiator fan and water pump |
| 21 | Replacement of FIP |
| 22 | Labour charge including testing of the engine after major overhauling |
| 23 | Overhauling of head and replacement of worn out parts |
| 24 | Overhauling of 30 KVA DG Set |
| 25 | Replacement of oil filter |
| 26 | Replacement of fuel filter |
| 27 | Replacement of air filter |
| 28 | Replacement of engine oil |
| 29 | Replacement of coolant |
| 30 | Replacement of MCCB |
| 31 | Replacement of piston set |
| 32 | Cleaning of Radiator & installation |
| 33 | Replacement of fan belt of Radiator fan and water pump |
| 34 | Liner Set |
| 35 | Replacement of connection rod |
| 36 | Labour charge including testing of the engine after major overhauling |
| 37 | Overhauling of 10 KVA DG Set |
| 38 | Piston with piston ring |
| 39 | Gas kit |
| 40 | Replacement of 250 Amp MCCB |
| 41 | Replacement of oil filter |
| 42 | Replacement of fuel filter |
| 43 | Replacement of air filter |
| 44 | Replacement of fan belt of Radiator fan and water pump |
| 45 | Replacement of engine oil |
| 46 | Replacement of coolant |
| 47 | Cleaning of Radiator & installation |
| 48 | Labour charge including testing of the engine after major overhauling Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Aug 10, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 24, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 12 daysAug 25, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 13 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender