Defence Statutory Bodies & Commissions/Committees Closing in 17 days TDR #56925576

Tender For Special Repair/Replacement Of Old Unserviceable Electric Meters Etc At Af Stn Balijan Under Ge(Af) Chabua

Issued by Statutory Bodies & Commissions/Committees · Dibrugarh, Assam
Tender Value
27.26 Lakhs
Estimated cost
Bid Submission
29 Aug 2026
17 days left
EMD
54520
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Dibrugarh → Assam
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Special Repair/Replacement Of Old Unserviceable Electric Meters Etc At Af Stn Balijan Under Ge(Af) Chabua

BOQ

Name of Work:- SPECIAL REPAIR/REPLACEMENT OF OLD UNSERVICEABLE ELECTRIC METERS ETC AT AF STN BALIJAN UNDER GE(AF) CHABUA
Sl. No. Item Description
1Disconnecting the power supply from existing unsv energy meters by carefully opening connection from terminal and depositing into MES stores for safe custody complete all as specified and directed.
2Disconnecting the power supply from existing corroded meter boxex by carefully and depositing into stores for schedule of credit complete all as specified and directed.
3Supply, installatin, testing and commissioning of Single phase cellular as per IS 16444, Smart meter with the following specifications:(i) AC Single Phase Two Wire, Tamper Proof, static Meter of Class 1.0, 240 V, 50 Hz, 10-60A anti-tamper features,(ii) Meter Should support the following data: 15 min instantaneous dat for voltage, current , power factor , power, cumulative energy and frequency, single phase, dual mode supoort (Prepaid/postpaid), tamper proof, static smart watthour (energy) meter suitable for AC Single phase, two wire, 240V, SOH2, 10A-60A, accuracy class 1.0, microprocessor and LED based circuitry conforming to 1S 13779, 1515884, IS 16444 and IS 15959 or latest in a suitable size tamper proof, hinge type, transparent polycarbonate enclosure box with advanced protection feature having IP54 or better protection against environmental conditions with proper sealing arrangement, The smart meter should have five (5) years warrantyMeter should have the following features.1) Meter should support 'tamper' events and 'power outage' detection and reporting to HES (Head End System) using communication module2) The advanced metering system should have mobile applications supporting Android and iOS which shows all electric parameters and alerts, Consumer will able to check consumption details along with transaction details.3) Meter should transfer the billing and tamper data for bill generation, data analysis and energy accounting to HES using communication module GPRS. The cellular (GPRS) should support fall back operation to 2G. 4) Meter should support at least 30 minutes instantaneous data for voltage, current, power factor, power, cumulative Energies & frequency and should also support at least 30 minutes energy and maximum demand load profile. 5) Meter should have Bidirectional communication module to accommodate cellular communication technology for remote connection/disconnection.6) Meter should support mode switching i.e. from postpaid to prepaid and vice versa via HES/billing software. 7) The meter manufacturer should provide all the meter integration support.
4Supply, Installation, Testing, Commissioning of AC three phase, dual mode support (prepaid/postpaid), tamper proof, static smart watthour (energy) meter suitable for AC three phase, four wire, 3X 240v, 50H2, 10-100A, accuracy class 1.0, microprocessor and LED based circuitry conforming to 1513779, 1515884, 1516444 and IS 15959 or latest in a suitable size tamper proof, hinge type, transparent polycarbonate enclosure box with advanced protection feature having IP54 or better protection against environmental conditions with proper sealing arrangement. The smart meter should have five (5)years warranty, Meter should have the following features.1) Meter should support 'tamper' events and 'power outage' detection and reporting to HES (Head End System) using communication module.2) The advanced metering system should have mobile applications supporting Android and iOS which shows all electric parameters and alerts. Consumer will able to check consumption details along with transaction details.3) Meter should transfer the billing and tamper data for bill generation, data analysis and energy accounting to HES using communication module GPRS. The cellular (GPRS) should support fall back operation to 2G.4) Meter should support at least 30 minutes instantaneous data for voltage, current, power factor, power, cumulative energies & frequency and should also support at least 30 minutes energy and maximum demand load profile.5) Meter should have Bidirectional communication module to accommodate cellular communication technology for remote connection/disconnection.6) Meter should support mode switching i.e. from postpaid to prepaid and vice versa via HES/billing software.7) The meter manufacturer should provide all the meter integration support.
5Web Based SoftwareSupply and confirguration of the Web based Software per meter with foolowing moules (i) Meter Data Management MouldeThe meter data management module woud be responsible for collecting the data from the concentrator and make the data available to the illing system. The meter data management system would capture and provide the following data:(a) 15 min instantaneous data from all the meters for seven parameters-cumulative Energy, cumulative Apparent Energy(as applicable), Power, Current, Voltage, Power Factor and Frequency.(b) Monthly billing survey data for cum energy and max demand(ii) Billing Module, The billing moudle would collect the data froom the meter data management module calculate the energy consumption, calculate billing determiant and make energy data/billing data available to admin and end users. The billing module would include functionalities for tariff setup, bill format setup, bill adjustment, occupation billing and vacation billing. The system would be setp as postpaid billing systme, it would allow postpaid and prepaid functionality as required . Make: Innologix/Transverse/Mega calibre or Equivlent/Lauritz Knudsen (iii) Occupation and Vacation ModuleThe system would support occupation/vacation and billing reports. The software would be collecting data from DCU. The Software Would provide access to staff as well as the occupant for the data.(iv) Web site: There would e a dedicated website for the admin team to view all the data and information. The designated users in MES would have the admin access to the application. The MES staff would also have the access of the key information on an android mobiles app (for admin use).(v) Custmer Portal The system would include customer portal for the resident/occupant to log in and view their own energy / biling data. There would e android and iOS mobile apps for the user to monitor its own data and balance on regular basis. (vi) Energy Accounting MoudleThe Systme would include features of energy accounting. The system would be able to account for total energy block wise, facility wise and would also allow calcuations of unaccounted energy in cae total energy meter is also available.(vii) Communicatin ModuleThe system would provide communication of energy data and bills via print, email and sms methods.(viii) Meter Master DataThe system would support meter master data repository. The system would support meter replacement process.(ix) Excel Export The system would support export of metering billing data in excel fromat. (x) Custmer Care Module- the software would include a customer care moudule where the user would be log in any complaints. The service provider would monitor the complaints and carry out the necessary activities for the complaints resolution. (xi) Meter Installation Module- The sftware would include an app based meter installation module where the meter intallation or changes can be captured on the app itself and the readings wmay be demonstrated to the user if required on the app itself.(xii) Activities communicatin- The software support communication of the various activities such as occupation, vacation, meter change. persnal detail change etc. With the user as well as the department on email.Note:(a) The software would be hosted on MEITY (Ministry of Information Technology) approved GCC (Government Community Cloud)
6S& F 2 core x 4 sqmm PVC insulated Copper conductor complete all as specified and directed.
7S& F 4 core x 6 sqmm PVC insulated Copper conductor complete all as specified and directed.
84 Years AMC Charges Should be paid from day 1 Go-Live:(a) Sim Charges. The contractor would ensure supply of appropiate SIMs to ensure necessary single availability. The Contractor would change the sim or sim provider as required. In case of network issues, the contracotr woul liasion with telecom serivce providers for necessary resoultion.(b) Recurring SMS Charges . The SMS would be issued for the payments alerts, low balance alerts and disconnection/connection alerts.(c) Software AMC. This would include necessary upgradations in the software such as support to the chrome browser changes, android version changes, iOS version changes. These Changes happen on frequent basis and the software would support all the changes. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56925576
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 27.26 Lakhs
LAST DATE 29-08-2026
Authority
Authority Name Military Engineer Services
Work Description Tender for Special Repair/Replacement Of Old Unserviceable Electric Meters Etc At Af Stn Balijan Under Ge(Af) Chabua
Basic Detail
Tender No 810
Bidding Type Tender
Location
City Dibrugarh
State Assam
Key Dates
Publish Date 10 Aug 2026
Submission Date 29 Aug 2026
Open Date 05 Sep 2026
Finance
Tender Value 27.26 Lakhs
Tender Fee 500
EMD 54520
Exemption Available
Document List
39561634-169b-4c28-a8c6-f01dc596bbe0.html
BOQ_877965.xls
generalpage.pdf
Tendernotice_1 (7).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 10, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 29, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 17 days
Sep 05, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 24 days

Tender Documents

Download All (ZIP) ↓
html

39561634-169b-4c28-a8c6-f01dc596bbe0.html

xls

BOQ_877965.xls

pdf

generalpage.pdf

pdf

Tendernotice_1 (7).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders