Tender For Construction Of Lining/ Bed Treatment/ Retaining Walls And Crate Protection Works On Weak And Vulnerable Spots From Rd 3000 To 7000 Fts On Supply Channel, Rd 0 Mtr, Rd 6000 Mtr, On Karpora Canal Rd 0 To 1600 Fts Including Wadipora Chek Khu
Tender Overview
Project Description
Tender for Construction Of Lining/ Bed Treatment/ Retaining Walls And Crate Protection Works On Weak And Vulnerable Spots From Rd 3000 To 7000 Fts On Supply Channel, Rd 0 Mtr, Rd 6000 Mtr, On Karpora Canal Rd 0 To 1600 Fts Including Wadipora Chek Khul Branch Of Kralcheck Khul Minor Of Khanchi Canal In Village Kralcheck And Bifurcation Cum Lining Wall At Tumchinowpora
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 21-Aug-2026 | Corrigendum | Fee | 29-Aug-2026 |
| 2 | 29-Aug-2026 | Extension | Date | 01-Sep-2026 |
| 3 | 21-Aug-2026 | Corrigendum | Fee | 01-Sep-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed byEngineer-in-Charge. All kinds of soil : |
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : |
| 3 | Dumping of stones. in Horizontal on level |
| 4 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 5 | Supply of Stones (nallah) nominal size 225 mm |
| 6 | Supply of crates mesh (including mechanical transport) |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 9 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 10 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 11 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 12 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. |
| 13 | Suspended floors, roofs, landings, balconies and access platforms. |
| 14 | Edges of slabs and breaks in floors and wallsUnder 20cm wide |
| 15 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) |
| 16 | 1 : 6 ( 1 cement : 6 fine sand) |
| 17 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth. |
| 18 | Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5mrespectively ) Wet |
| 19 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar |
| 20 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 21 | Collection/ Extraction of stone boulders/ supply of stone boulders including all sorts of carriages, all leads and lifts upto actual site of work. Complete job |
| 22 | Carriage of Materials from source upto road site by Mechnical transport including cost of loading unloading and stacking Soling Stone avg. lead 08 km |
| 23 | Stone soling from av lead 10km |
| 24 | 40 mm stone Aggregate avg. lead of 45 kms |
| 25 | 40 mm stone Aggregate avg. lead of 05 kms |
| 26 | 40 mm stone Aggregate avg. lead of 03 kms |
| 27 | 20 mm stone Aggregate avg. lead of 45 kms |
| 28 | 20 mm stone Aggregate avg. lead of 05 kms |
| 29 | 20 mm stone Aggregate avg. lead of 03 kms |
| 30 | Sand avg. lead of 35 kms . |
| 31 | Sand avg. lead of 12 kms . |
| 32 | Sand avg. lead of 08 kms . |
| 33 | Sand avg. lead of 30 kms . |
| 34 | Steel from av lead 08 km |
| 35 | Cement from av lead 08 km |
| 36 | Cement from av lead 01 km |
| 37 | Cement from av lead 03 km |
| 38 | Extra carriage of Materials from road site to site of work by Mannual labour Including loading unloading and stacking Avg. Lead 50 mtr. Soling stone |
| 39 | 40mm stone agg |
| 40 | 20mm stone agg |
| 41 | Cement |
| 42 | Extra carriage of Materials from road site to site of work by Mannual labour Including loading unloading and stacking Avg. Lead 100 mtr. Soling stone |
| 43 | 40 mm stone agg |
| 44 | 20mm stone agg |
| 45 | cement |
| 46 | Extra carriage of Materials from road site to site of work by Mannual labour Including loading unloading and stacking Avg. Lead 200 mtr. Soling stone |
| 47 | 40mm stone agg |
| 48 | 20mm stone agg |
| 49 | Cement |
| 50 | Steel |
| 51 | Crate mesh |
| 52 | Extra carriage of crate mesh from road site to site of work by ponies including loading unloading and stacking |
| 53 | Providing and Fixing of ACP Boards with computerized printing of size (3'x4') |
| 54 | Printing of Geo Tagged Photograps pre-post and during execution. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
TodayTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender