Bids Are invited for Operation And Maintenance Of Electrical Systems/Electrical Installations - 2481599 - Routine/Breakdown Maintenance Of 11Kv Switchgear Of 33/11Kv Substation At Atp Anpara , Over Hauling Of 11Kv Switch Gear/11 Kv Ocb (As Per Scope
Tender Overview
Project Description
Bids Are invited for Operation And Maintenance Of Electrical Systems/Electrical Installations - 2481599 - Routine/Breakdown Maintenance Of 11Kv Switchgear Of 33/11Kv Substation At Atp Anpara , Over Hauling Of 11Kv Switch Gear/11 Kv Ocb (As Per Scope Of Work) , Taking Out The 11Kv Ocb Switch Gear Panel & Drain Out T / F Oil From Tank Safely By Opening Of Plate Of Ocb , Cleaning The Internal Part Of 11Kv Ocb Along With Fix & Moving Contacts , Assembling & Fixing Of All Dismantled Part Of 11Kv Ocb, Its Original Position Complete With Gasket, Bolts Nuts. , Top Up T/F Oil & Complete Centrifuging Up To 50 Kv On 2.5Mm Gap,3/2 Minute No Break , Cleaning & Changing Of Bus Bar Spouts& Fixed Contacts After Opening Bus Cover , Changing Of T/F Oil From 11 Kv Pt After Centrifuging , Cleaning The Bush Panels Internally & Externally With The Help Of Cotton Cloth & Blower , Over Hauling Of Cg Make Vaccum Circuit Breakers , Servicing & Cleaning Of 11Kv Bus , Replacement Of Damaged Cable (As Per Scope Of Work) , Xlpe / 11/ 6.6 Kv Cable Of Different Sizes , 3C/(3X1/2)C Lt Cable Of Different Sizes , 2Cx 10 Mm2 To 3Cx 50 Mm2 Lt Pvc Cable , Laying Of 11Kv Ht Pvc Underground Cable Up To 400 Sqmm(As Per Scope Of Work) , Salvaging Of The Cable , Laying Of The Cable , Laying Of Lt Pvc Underground Cable Of Different Sizes , (Part-C) Supply & Replacement Of The Following Parts Of Ss Make 11 Kv Ocb (As Per Scope Of Work) , Contact Bar , R8/ 1 Arching Chamber , Acp Stack With Allen Cap Screw , Oil Seal Housing , R8/1 Ocb Housing With Gasket , Tripping Coil For Ocb , 11 Kv Ocb Male Contact Finger , Female Contact Of 11 Kv Ocb , Arching Main Contact Finger- Female , Resistance 1 Ohm,100W , 11Kv Bush Spout Femalecontact Silver Ss Make , Excavation Of Soil From The Yard & Lumping At One Place (01X01x0.15)Mtr Cube , Excavation Of Aggregate Mixed Withash, Separating/Filtering Aggregate From Ash And Continous Spreading In Yard (01X01x0.15) , Disposal Of Complete Ash And Soil Collected During Excavation Mentioned On S.No 19 &20 , Replacement Of Damaged Worn Out Service Cable. , Replacement Of Damaged Electrical Wiring And All The Damaged Electrical Fixtures In New Allotted Quarters / Shifted Quarters Of Atp Colony, Anpara. , Replacement Of All The Required Electrical Fixtures For Complete New Electrical Wiring In Type-I Quarters Of Atp Colony, Anpara , Replacement Of All The Required Electrical Fixtures For Complete New Electrical Wiring In Type-Ii Quarters Of Atp Colony, Anpara , Replacement Of All The Required Electrical Fixtures For Complete New Electrical Wiring In Type-Iii Quarters Of Atp Colony, Anpara. , Replacement Of All The Required Electrical Fixtures For Complete New Electrical Wiring In Type-Iv Quarters Of Atp Colony, Anpara. , Replacement Of All The Required Electrical Fixtures For Complete New Electrical Wiring In Rooms Ofone Room Field Hostel Of Atp Colony, Anpara. , Replacement Of All The Required Electrical Fixtures For Complete New Electrical Wiring In Rooms In Two Room Field Hostel Of Atp Colony, Anpara
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Routine/breakdown maintenance of 11KV switchgear of 33/11KV Substation at ATP Anpara | Routine/breakdown maintenance of 11KV switchgear of 33/11KV Substation at ATP Anpara |
| 2 | OVER HAULING OF 11KV SWITCH GEAR/11 KV OCB (As per scope of work) | OVER HAULING OF 11KV SWITCH GEAR/11 KV OCB (As per scope of work) |
| 3 | Taking out the 11KV OCB switch gear panel & drain out T / F Oil from tank safely by opening of plate of OCB | Taking out the 11KV OCB switch gear panel & drain out T / F Oil from tank safely by opening of plate of OCB |
| 4 | Cleaning the internal part of 11KV OCB along with fix & moving contacts | Cleaning the internal part of 11KV OCB along with fix & moving contacts |
| 5 | Assembling & fixing of all dismantled part of 11KV OCB, its original position complete with gasket, bolts nuts. | Assembling & fixing of all dismantled part of 11KV OCB, its original position complete with gasket, bolts nuts. |
| 6 | Top up T/F Oil & complete Centrifuging up to 50 KV on 2.5mm gap,3/2 minute no break | Top up T/F Oil & complete Centrifuging up to 50 KV on 2.5mm gap,3/2 minute no break |
| 7 | Cleaning & changing of bus bar spouts& fixed contacts after opening bus cover | Cleaning & changing of bus bar spouts& fixed contacts after opening bus cover |
| 8 | Changing of T/F Oil from 11 KV PT after centrifuging | Changing of T/F Oil from 11 KV PT after centrifuging |
| 9 | Cleaning the Bush panels internally & externally with the help of cotton cloth & blower | Cleaning the Bush panels internally & externally with the help of cotton cloth & blower |
| 10 | Over Hauling of CG Make Vaccum Circuit Breakers | Over Hauling of CG Make Vaccum Circuit Breakers |
| 11 | Servicing & Cleaning of 11KV BUS | Servicing & Cleaning of 11KV BUS |
| 12 | Replacement of damaged cable (As per scope of work) | Replacement of damaged cable (As per scope of work) |
| 13 | XLPE / 11/ 6.6 KV Cable of different sizes | XLPE / 11/ 6.6 KV Cable of different sizes |
| 14 | 3C/(3x1/2)C LT Cable of different sizes | 3C/(3x1/2)C LT Cable of different sizes |
| 15 | 2CX 10 MM2 TO 3CX 50 MM2 LT PVC Cable | 2CX 10 MM2 TO 3CX 50 MM2 LT PVC Cable |
| 16 | Laying of 11KV HT PVC Underground cable up to 400 sqmm(As per scope of work) | Laying of 11KV HT PVC Underground cable up to 400 sqmm(As per scope of work) |
| 17 | Salvaging of the cable | Salvaging of the cable |
| 18 | Laying of the cable | Laying of the cable |
| 19 | Laying of LT PVC Underground cable of different sizes | Laying of LT PVC Underground cable of different sizes |
| 20 | (PART-C) SUPPLY & REPLACEMENT OF THE FOLLOWING PARTS OF SS MAKE 11 KV OCB (As per scope of work) | (PART-C) SUPPLY & REPLACEMENT OF THE FOLLOWING PARTS OF SS MAKE 11 KV OCB (As per scope of work) |
| 21 | Contact bar | Contact bar |
| 22 | R8/ 1 Arching chamber | R8/ 1 Arching chamber |
| 23 | ACP Stack with Allen cap screw | ACP Stack with Allen cap screw |
| 24 | Oil seal housing | Oil seal housing |
| 25 | R8/1 OCB housing with gasket | R8/1 OCB housing with gasket |
| 26 | Tripping coil for OCB | Tripping coil for OCB |
| 27 | 11 KV OCB male contact finger | 11 KV OCB male contact finger |
| 28 | Female contact of 11 KV OCB | Female contact of 11 KV OCB |
| 29 | arching main contact finger- female | arching main contact finger- female |
| 30 | resistance 1 ohm,100W | resistance 1 ohm,100W |
| 31 | 11KV bush spout femalecontact silver SS make | 11KV bush spout femalecontact silver SS make |
| 32 | Excavation of Soil from the yard & lumping at one place (01X01X0.15)mtr cube | Excavation of Soil from the yard & lumping at one place (01X01X0.15)mtr cube |
| 33 | Excavation of aggregate mixed withAsh, separating/filtering aggregate from Ash and continous spreading in yard (01X01X0.15) | Excavation of aggregate mixed withAsh, separating/filtering aggregate from Ash and continous spreading in yard (01X01X0.15) |
| 34 | Disposal of complete ash and soil collected during excavation mentioned on S.No 19 &20 | Disposal of complete ash and soil collected during excavation mentioned on S.No 19 &20 |
| 35 | Replacement of damaged worn out service cable. | Replacement of damaged worn out service cable. |
| 36 | Replacement of damaged electrical wiring and all the damaged electrical fixtures in new allotted quarters / shifted quarters of ATP Colony, Anpara. | Replacement of damaged electrical wiring and all the damaged electrical fixtures in new allotted quarters / shifted quarters of ATP Colony, Anpara. |
| 37 | Replacement of all the required electrical fixtures for Complete new electrical wiring in Type-I Quarters of ATP Colony, Anpara | Replacement of all the required electrical fixtures for Complete new electrical wiring in Type-I Quarters of ATP Colony, Anpara |
| 38 | Replacement of all the required electrical fixtures for Complete new electrical wiring in Type-II Quarters of ATP Colony, Anpara | Replacement of all the required electrical fixtures for Complete new electrical wiring in Type-II Quarters of ATP Colony, Anpara |
| 39 | Replacement of all the required electrical fixtures for Complete new electrical wiring in Type-III Quarters of ATP Colony, Anpara. | Replacement of all the required electrical fixtures for Complete new electrical wiring in Type-III Quarters of ATP Colony, Anpara. |
| 40 | Replacement of all the required electrical fixtures for Complete new electrical wiring in Type-IV Quarters of ATP Colony, Anpara. | Replacement of all the required electrical fixtures for Complete new electrical wiring in Type-IV Quarters of ATP Colony, Anpara. |
| 41 | Replacement of all the required electrical fixtures for Complete new electrical wiring in Rooms ofOne room field hostel of ATP Colony, Anpara. | Replacement of all the required electrical fixtures for Complete new electrical wiring in Rooms ofOne room field hostel of ATP Colony, Anpara. |
| 42 | Replacement of all the required electrical fixtures for Complete new electrical wiring in Rooms in Two room field hostel of ATP Colony, Anpara | Replacement of all the required electrical fixtures for Complete new electrical wiring in Rooms in Two room field hostel of ATP Colony, Anpara |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 12 daysBid Opening Date
Technical bids will be opened and evaluated.