Power Government Departments Closing in 0 days TDR #56918506

Bids Are invited for Work Related To Uninterrupted Power Supply Damaged Electricity Lines Due Natural Disaster

Issued by Government Departments · Aligarh, Uttar Pradesh
Tender Value
5 Lakhs
Estimated cost
Bid Submission
24 Aug 2026
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Aligarh → Uttar Pradesh
EMD Exemption
Not Available
Quantity
2277

Project Description

Bids Are invited for Work Related To Uninterrupted Power Supply Damaged Electricity Lines Due Natural Disaster Carriage Of Following Pcc Stp Poles 8.5 11 13 Mtr - Carriage Of Following Poles From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading And Unloading At The Respective Ends Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour T P Carrier Etc Required For Proper Completion Of Work. (Dist. O To 50 Kms.). Pcc Stp Poles 8.5 11 13 Mtr. , Carriage Of Line Material - Carriage Of Line Material Viz Lt Cable, Conductor Gi Earth Wire, Barbed Wire, Cross Arm, Angle, Channel, Insulator, Various Cl S, Xlpe Cable, Cable, Stone Pad And Other Line Material From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading And Unloading At The Respective End, Also Including The Work Of Dragging Etc, And Also Including The Cost Of Labour, T P Carrier Etc. Required For Proper Completion Of Work. (Dist. 0 10 50 Km) , Erection Of Pcc And Stp Poles 8.5, 11 And 13 Mtr - Erection Of Single Support Including Complete H.T And L.T Fittings With Drilling And Cutting As Per Resspo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T And P And Carrier Etc Required For Proper Completion Of Work , Erection Of Double Poles 8.5, 11 And 13 Mtr - Erection Of Double And Section Pole On Following Poles Including Including Complete H.T And L.T Fittings With Drilling And Cutting And The Work Of Complete Line As Per Resspo Norms Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T And P And Carrier Etc Required For Proper Completion Of Work , Installation And Fixing Of 11 Kv Tpmo. - Erection Of Double And Section Pole On Following Poles Including Including Complete H.T And L.T Fittings With Drilling & Cutting And The Work Of Complete Line As Per Resspo Norms Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T And P And Carrier Etc Required For Proper Completion Of Work , Erection And Grouting Of Stay Set - Erection And Grouting Of Stay Set Including The Work Of Nozzling Etc As Per Resspo Manual And Also Including The Cost Of Arrangement Of All Grouting Material, Labour, T And P Etc Required For Proper Completion Of Work , Providing And Fixing Of Insulator - Providing And Fixing Of Stay Insulator , Laying Of Acsr Weasal, Rabbit And Dog Conductor. - Laying, Sagging, Stringing, Binding And Jumpering Etc Of Line Conductor On The Newly Erected Pole As Per Resspo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T And P Carrier Etc Required For Proper Completion Of Work , Erection Of Abc Conductor - Abc Conductor 3X50+1X35+1X16 Sqmm And 3X95+1X70+1X16 Sqmm And 3X120+1X95+1X16 Sqmm And 1X16+1X25 Sqmm , Grouting Of Pcc And Stp Poles , Making Of Plinth - Making The Plinth Of Steel Poles , Carriage And Installation Of 25 Kva Transformer - Carriage And Installation From Site To Store And Store To Site Following Capacity Transformer Including The Work Of Its Loading And Unloading, Dragging Etc And Also Including The Cost Of Labour And T And P Etc Required For Proper Completion Earthing And Jumphering Of Work , Carriage And Installation Of 63 Kva Transformer - Carriage And Installation From Site To Store And Store To Site Following Capacity Transformer Including The Work Of Its Loading And Unloading, Dragging Etc And Also Including The Cost Of Labour And T And P Etc Required For Proper Completion Earthing And Jumphering Of Work , Carriage And Installation Of 100 Kva Transformer - Carriage And Installation From Site To Store And Store To Site Following Capacity Transformer Including The Work Of Its Loading And Unloading, Dragging Etc And Also Including The Cost Of Labour And T And P Etc Required For Proper Completion Earthing And Jumphering Of Work , 11Kv Vcb Including Complete Overhauling Repair - Complete Repairing Of Different Make 11Kv Vcb Including Complete Overhauling Repair Replacement Of Defective And Damaged Minor Spare That Are Tripping Coils Tripping Plate And Nut Bolt With Complete Wiring T P Etc. For Proper Completion Of Work The Repairs Circuit Breaker Will Be Tested On Load. The Spare Taken Out From Circuit Breaker At The Time Of Repair Shall Be Return To Je Concerned Who Will Be Liable To Hand Over Such Scrape To Store Aligarh.

BOQ

Sl. No. Item TitleItem Description
1Carriage of following PCC STP poles 8.5 11 13 MtrCarriage of following poles from Store centre or from any other place to the respective site of work through the Kachha Pacca road Including the work of its loading and unloading at the respective ends also including the work of dragging etc. and also including the cost of labour T P carrier etc required for proper completion of work. (Dist. O to 50 Kms.). PCC STP poles 8.5 11 13 Mtr.
2Carriage of line materialCarriage of line material viz LT Cable, Conductor Gi earth wire, Barbed wire, Cross Arm, Angle, Channel, Insulator, various Clamps, XLPE cable, Cable, Stone pad and other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading and unloading at the respective end, also including the work of dragging etc, and also including the cost of labour, T P carrier etc. required for proper completion of work. (Dist. 0 10 50 Km)
3Erection of PCC and STP poles 8.5, 11 and 13 MtrErection of single support including complete H.T and L.T fittings with drilling and cutting as per RESSPO manual and as per direction of Engineer incharge including the cost of labour, T and P and carrier etc required for proper completion of work
4Erection of Double poles 8.5, 11 and 13 MtrErection of double and Section pole on following poles including including complete H.T and L.T fittings with drilling and cutting and the work of complete line as per RESSPO norms manual and as per direction of Engineer Incharge including the cost of labour, T and P and carrier etc required for proper completion of work
5Installation and fixing of 11 KV TPMO.Erection of double and Section pole on following poles including including complete H.T and L.T fittings with drilling & cutting and the work of complete line as per RESSPO norms manual and as per direction of Engineer Incharge including the cost of labour, T and P and carrier etc required for proper completion of work
6Erection and Grouting of stay setErection and Grouting of stay set including the work of nozzling etc as per RESSPO manual and also including the cost of arrangement of all grouting material, labour, T and P etc required for proper completion of work
7Providing and fixing of insulatorProviding and fixing of stay insulator
8Laying of ACSR Weasal, Rabbit and Dog Conductor.Laying, sagging, stringing, binding and jumpering etc of line conductor on the newly erected pole as per RESSPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T and P carrier etc required for proper completion of work
9Erection of ABC ConductorABC Conductor 3x50+1x35+1x16 Sqmm and 3x95+1x70+1x16 Sqmm and 3x120+1x95+1x16 Sqmm and 1x16+1x25 Sqmm
10Grouting of PCC and STP polesGrouting of PCC and STP poles 8.5, 11 and 13 Mtr Long as per RESSPO norms
11Making of plinthMaking the plinth of Steel poles
12Carriage and Installation of 25 KVA TransformerCarriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work
13Carriage and Installation of 63 KVA TransformerCarriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work
14Carriage and Installation of 100 KVA TransformerCarriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work
1511KV VCB Including complete overhauling repairComplete Repairing of Different make 11KV VCB Including complete overhauling repair replacement of defective and damaged minor spare that are tripping coils tripping plate and nut bolt with complete wiring T P etc. for proper completion of work the repairs circuit breaker will be tested on load. The spare taken out from circuit breaker at the time of repair shall be return to JE concerned who will be liable to hand over such scrape to store Aligarh.

AI Tender Summary

OUR REF NO 56918506
AUTHORITY Government Departments
TENDER VALUE 5 Lakhs
LAST DATE 24-08-2026
Authority
Authority Name Uttar Pradesh Power Corporation Limited
Work Description Bids Are invited for Work Related To Uninterrupted Power Supply Damaged Electricity Lines Due Natural Disaster Carriage Of Following Pcc Stp Poles 8.5 11 13 Mtr - Carriage Of Following Poles From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading And Unloading At The Respective Ends Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour T P Carrier Etc Required For Proper Completion Of Work. (Dist. O To 50 Kms.). Pcc Stp Poles 8.5 11 13 Mtr. , Carriage Of Line Material - Carriage Of Line Material Viz Lt Cable, Conductor Gi Earth Wire, Barbed Wire, Cross Arm, Angle, Channel, Insulator, Various Cl S, Xlpe Cable, Cable, Stone Pad And Other Line Material From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading And Unloading At The Respective End, Also Including The Work Of Dragging Etc, And Also Including The Cost Of Labour, T P Carrier Etc. Required For Proper Completion Of Work. (Dist. 0 10 50 Km) , Erection Of Pcc And Stp Poles 8.5, 11 And 13 Mtr - Erection Of Single Support Including Complete H.T And L.T Fittings With Drilling And Cutting As Per Resspo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T And P And Carrier Etc Required For Proper Completion Of Work , Erection Of Double Poles 8.5, 11 And 13 Mtr - Erection Of Double And Section Pole On Following Poles Including Including Complete H.T And L.T Fittings With Drilling And Cutting And The Work Of Complete Line As Per Resspo Norms Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T And P And Carrier Etc Required For Proper Completion Of Work , Installation And Fixing Of 11 Kv Tpmo. - Erection Of Double And Section Pole On Following Poles Including Including Complete H.T And L.T Fittings With Drilling & Cutting And The Work Of Complete Line As Per Resspo Norms Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T And P And Carrier Etc Required For Proper Completion Of Work , Erection And Grouting Of Stay Set - Erection And Grouting Of Stay Set Including The Work Of Nozzling Etc As Per Resspo Manual And Also Including The Cost Of Arrangement Of All Grouting Material, Labour, T And P Etc Required For Proper Completion Of Work , Providing And Fixing Of Insulator - Providing And Fixing Of Stay Insulator , Laying Of Acsr Weasal, Rabbit And Dog Conductor. - Laying, Sagging, Stringing, Binding And Jumpering Etc Of Line Conductor On The Newly Erected Pole As Per Resspo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T And P Carrier Etc Required For Proper Completion Of Work , Erection Of Abc Conductor - Abc Conductor 3X50+1X35+1X16 Sqmm And 3X95+1X70+1X16 Sqmm And 3X120+1X95+1X16 Sqmm And 1X16+1X25 Sqmm , Grouting Of Pcc And Stp Poles , Making Of Plinth - Making The Plinth Of Steel Poles , Carriage And Installation Of 25 Kva Transformer - Carriage And Installation From Site To Store And Store To Site Following Capacity Transformer Including The Work Of Its Loading And Unloading, Dragging Etc And Also Including The Cost Of Labour And T And P Etc Required For Proper Completion Earthing And Jumphering Of Work , Carriage And Installation Of 63 Kva Transformer - Carriage And Installation From Site To Store And Store To Site Following Capacity Transformer Including The Work Of Its Loading And Unloading, Dragging Etc And Also Including The Cost Of Labour And T And P Etc Required For Proper Completion Earthing And Jumphering Of Work , Carriage And Installation Of 100 Kva Transformer - Carriage And Installation From Site To Store And Store To Site Following Capacity Transformer Including The Work Of Its Loading And Unloading, Dragging Etc And Also Including The Cost Of Labour And T And P Etc Required For Proper Completion Earthing And Jumphering Of Work , 11Kv Vcb Including Complete Overhauling Repair - Complete Repairing Of Different Make 11Kv Vcb Including Complete Overhauling Repair Replacement Of Defective And Damaged Minor Spare That Are Tripping Coils Tripping Plate And Nut Bolt With Complete Wiring T P Etc. For Proper Completion Of Work The Repairs Circuit Breaker Will Be Tested On Load. The Spare Taken Out From Circuit Breaker At The Time Of Repair Shall Be Return To Je Concerned Who Will Be Liable To Hand Over Such Scrape To Store Aligarh.
Basic Detail
Tender No GEM/2026/B/7894620
Bidding Type Tender
Location
City Aligarh
State Uttar Pradesh
Key Dates
Publish Date 08 Aug 2026
Submission Date 24 Aug 2026
Open Date 24 Aug 2026
Finance
Tender Value 5 Lakhs
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
ecc3d68b-0231-4c20-9ce2-7546f716a679.pdf
9729645_Boq_1.xlsx
AkrabadATC_2abb0934-a8e1-4e0e-a9461786183972592_BUYEREDC2ALIGARH.pdf
akrabadboq_2026-08-08-14-39-04_7d7bb994e2937b09c6ec0c96ad34a760.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 08, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 24, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Today
Aug 24, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Today

Tender Documents

Download All (ZIP) ↓
pdf

ecc3d68b-0231-4c20-9ce2-7546f716a679.pdf

xlsx

9729645_Boq_1.xlsx

pdf

AkrabadATC_2abb0934-a8e1-4e0e-a9461786183972592_BUYEREDC2ALIGARH.pdf

pdf

akrabadboq_2026-08-08-14-39-04_7d7bb994e2937b09c6ec0c96ad34a760.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders