Bids Are invited for Work Related To Uninterrupted Power Supply Damaged Electricity Lines Due Natural Disaster
Tender Overview
Project Description
Bids Are invited for Work Related To Uninterrupted Power Supply Damaged Electricity Lines Due Natural Disaster Carriage Of Following Pcc Stp Poles 8.5 11 13 Mtr - Carriage Of Following Poles From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading And Unloading At The Respective Ends Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour T P Carrier Etc Required For Proper Completion Of Work. (Dist. O To 50 Kms.). Pcc Stp Poles 8.5 11 13 Mtr. , Carriage Of Line Material - Carriage Of Line Material Viz Lt Cable, Conductor Gi Earth Wire, Barbed Wire, Cross Arm, Angle, Channel, Insulator, Various Cl S, Xlpe Cable, Cable, Stone Pad And Other Line Material From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading And Unloading At The Respective End, Also Including The Work Of Dragging Etc, And Also Including The Cost Of Labour, T P Carrier Etc. Required For Proper Completion Of Work. (Dist. 0 10 50 Km) , Erection Of Pcc And Stp Poles 8.5, 11 And 13 Mtr - Erection Of Single Support Including Complete H.T And L.T Fittings With Drilling And Cutting As Per Resspo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T And P And Carrier Etc Required For Proper Completion Of Work , Erection Of Double Poles 8.5, 11 And 13 Mtr - Erection Of Double And Section Pole On Following Poles Including Including Complete H.T And L.T Fittings With Drilling And Cutting And The Work Of Complete Line As Per Resspo Norms Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T And P And Carrier Etc Required For Proper Completion Of Work , Installation And Fixing Of 11 Kv Tpmo. - Erection Of Double And Section Pole On Following Poles Including Including Complete H.T And L.T Fittings With Drilling & Cutting And The Work Of Complete Line As Per Resspo Norms Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T And P And Carrier Etc Required For Proper Completion Of Work , Erection And Grouting Of Stay Set - Erection And Grouting Of Stay Set Including The Work Of Nozzling Etc As Per Resspo Manual And Also Including The Cost Of Arrangement Of All Grouting Material, Labour, T And P Etc Required For Proper Completion Of Work , Providing And Fixing Of Insulator - Providing And Fixing Of Stay Insulator , Laying Of Acsr Weasal, Rabbit And Dog Conductor. - Laying, Sagging, Stringing, Binding And Jumpering Etc Of Line Conductor On The Newly Erected Pole As Per Resspo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T And P Carrier Etc Required For Proper Completion Of Work , Erection Of Abc Conductor - Abc Conductor 3X50+1X35+1X16 Sqmm And 3X95+1X70+1X16 Sqmm And 3X120+1X95+1X16 Sqmm And 1X16+1X25 Sqmm , Grouting Of Pcc And Stp Poles , Making Of Plinth - Making The Plinth Of Steel Poles , Carriage And Installation Of 25 Kva Transformer - Carriage And Installation From Site To Store And Store To Site Following Capacity Transformer Including The Work Of Its Loading And Unloading, Dragging Etc And Also Including The Cost Of Labour And T And P Etc Required For Proper Completion Earthing And Jumphering Of Work , Carriage And Installation Of 63 Kva Transformer - Carriage And Installation From Site To Store And Store To Site Following Capacity Transformer Including The Work Of Its Loading And Unloading, Dragging Etc And Also Including The Cost Of Labour And T And P Etc Required For Proper Completion Earthing And Jumphering Of Work , Carriage And Installation Of 100 Kva Transformer - Carriage And Installation From Site To Store And Store To Site Following Capacity Transformer Including The Work Of Its Loading And Unloading, Dragging Etc And Also Including The Cost Of Labour And T And P Etc Required For Proper Completion Earthing And Jumphering Of Work , 11Kv Vcb Including Complete Overhauling Repair - Complete Repairing Of Different Make 11Kv Vcb Including Complete Overhauling Repair Replacement Of Defective And Damaged Minor Spare That Are Tripping Coils Tripping Plate And Nut Bolt With Complete Wiring T P Etc. For Proper Completion Of Work The Repairs Circuit Breaker Will Be Tested On Load. The Spare Taken Out From Circuit Breaker At The Time Of Repair Shall Be Return To Je Concerned Who Will Be Liable To Hand Over Such Scrape To Store Aligarh.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Carriage of following PCC STP poles 8.5 11 13 Mtr | Carriage of following poles from Store centre or from any other place to the respective site of work through the Kachha Pacca road Including the work of its loading and unloading at the respective ends also including the work of dragging etc. and also including the cost of labour T P carrier etc required for proper completion of work. (Dist. O to 50 Kms.). PCC STP poles 8.5 11 13 Mtr. |
| 2 | Carriage of line material | Carriage of line material viz LT Cable, Conductor Gi earth wire, Barbed wire, Cross Arm, Angle, Channel, Insulator, various Clamps, XLPE cable, Cable, Stone pad and other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading and unloading at the respective end, also including the work of dragging etc, and also including the cost of labour, T P carrier etc. required for proper completion of work. (Dist. 0 10 50 Km) |
| 3 | Erection of PCC and STP poles 8.5, 11 and 13 Mtr | Erection of single support including complete H.T and L.T fittings with drilling and cutting as per RESSPO manual and as per direction of Engineer incharge including the cost of labour, T and P and carrier etc required for proper completion of work |
| 4 | Erection of Double poles 8.5, 11 and 13 Mtr | Erection of double and Section pole on following poles including including complete H.T and L.T fittings with drilling and cutting and the work of complete line as per RESSPO norms manual and as per direction of Engineer Incharge including the cost of labour, T and P and carrier etc required for proper completion of work |
| 5 | Installation and fixing of 11 KV TPMO. | Erection of double and Section pole on following poles including including complete H.T and L.T fittings with drilling & cutting and the work of complete line as per RESSPO norms manual and as per direction of Engineer Incharge including the cost of labour, T and P and carrier etc required for proper completion of work |
| 6 | Erection and Grouting of stay set | Erection and Grouting of stay set including the work of nozzling etc as per RESSPO manual and also including the cost of arrangement of all grouting material, labour, T and P etc required for proper completion of work |
| 7 | Providing and fixing of insulator | Providing and fixing of stay insulator |
| 8 | Laying of ACSR Weasal, Rabbit and Dog Conductor. | Laying, sagging, stringing, binding and jumpering etc of line conductor on the newly erected pole as per RESSPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T and P carrier etc required for proper completion of work |
| 9 | Erection of ABC Conductor | ABC Conductor 3x50+1x35+1x16 Sqmm and 3x95+1x70+1x16 Sqmm and 3x120+1x95+1x16 Sqmm and 1x16+1x25 Sqmm |
| 10 | Grouting of PCC and STP poles | Grouting of PCC and STP poles 8.5, 11 and 13 Mtr Long as per RESSPO norms |
| 11 | Making of plinth | Making the plinth of Steel poles |
| 12 | Carriage and Installation of 25 KVA Transformer | Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work |
| 13 | Carriage and Installation of 63 KVA Transformer | Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work |
| 14 | Carriage and Installation of 100 KVA Transformer | Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work |
| 15 | 11KV VCB Including complete overhauling repair | Complete Repairing of Different make 11KV VCB Including complete overhauling repair replacement of defective and damaged minor spare that are tripping coils tripping plate and nut bolt with complete wiring T P etc. for proper completion of work the repairs circuit breaker will be tested on load. The spare taken out from circuit breaker at the time of repair shall be return to JE concerned who will be liable to hand over such scrape to store Aligarh. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
TodayBid Opening Date
Technical bids will be opened and evaluated.
TodayTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender