Tender For Construction Of New Anganwadi Building In Neepathurai Irular Colonu @ Neepathurai Panchayat
Tender Value
Ref. Documents
Estimated cost
Bid Submission
01 Sep 2026
16 days left
EMD
17350
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Tiruvannamalai → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of New Anganwadi Building In Neepathurai Irular Colonu @ Neepathurai Panchayat
BOQ
| Sl. No. | Item Description |
| 1 | Construction of Anganwadi Building in ADC Colony @ Elangunni Panachayat |
| 2 | Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,For Foundation |
| 3 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, |
| 4 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification |
| 5 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. |
| 6 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. |
| 7 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers |
| 8 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers |
| 9 | Supplying and erecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.95 cm x 60 cm and 10 guage stilfaned welded with mild steel angle |
| 10 | Cwentering Below GL |
| 11 | Above GL |
| 12 | Supply and fabrication of steel including cost and conveyance and all labour charges etc, |
| 13 | Weathering coarse concrete using 20mm size broken brick jelly with in pure slaked lime over the RCC Roof in the proportion of 32 : 12 1/2 by volume laid in layer beating the concrete with the wooden batters etc as per standard specifications . |
| 14 | Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm |
| 15 | Plastering with cement mortar 1:5, 12mm thick including cost and conveyance and all labour charges etc. |
| 16 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. |
| 17 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and including cost and conveyance and all labour charges etc,. |
| 18 | Paving the Floor with scratch proof vertified tiles of size 600x600x8mm laid in CM 1;2,10mm thick and pointing with white cement 0.40kg per sqm mixed with colouring pigment to siut the colour of the tiles including cost and conveyance of all materials to site and all labour charges etc complete |
| 19 | Paving the floor with pre-polished concrete anti-skid step tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) |
| 20 | Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever necessary, laying in position and pointing with white cement mixed with colouring pigment at the rate of 0.3 Kg. / sq.m. etc., complete complying with standard specification. works) |
| 21 | Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers. |
| 22 | Towards the cost of steel door of size 0.9 mx2.40 m including all charges etc. |
| 23 | Towards the cost of steel door of size 0.75mx1.5 m including all charges etc. |
| 24 | Towards the cost of steel door of size 1.1mx2.40 m including all charges etc. |
| 25 | Towards the cost of steel ventilator of size 0.9x0.45 m including all charges etc. |
| 26 | Towards the cost of steel Window of size 1.80mx1.60 m including all charges etc. |
| 27 | Provision for Lock & Key |
| 28 | Towards cost and fixing of RCC Jolly of size 0.90x0.45m including cost and conveyance and labour for fixing etc |
| 29 | Painting two coat with approved quality of distemper with colour over one coat of white cement for primier coat for the base including preparing surface and all materials cost labour etc |
| 30 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 31 | Painting two coats using Ist quality readymix enamel paint of approved colour over new iron work including cost and conveyance and all labour charges etc. |
| 32 | Provision for electrification arrangements with service connection |
| 33 | LIGHT POINT SD 20 |
| 34 | FAN POINT SD 20 |
| 35 | FAN point SD110 |
| 36 | Plug point (SD38) |
| 37 | CFL lamp (SD80) |
| 38 | TUBE Light Fittings ( SD 88 ) |
| 39 | DPI swtich of 500 V (SD142) |
| 40 | G I Pipe (SD69) |
| 41 | Service Wire (SD64) |
| 42 | Bulk head fitting (SD83) |
| 43 | Meter Board -TG-M0463 |
| 44 | 1000 Liter PVC Tank |
| 45 | Cost & Supply For Baby W.C including cost and conveyance of all materials to work site and labor charges etc complete. |
| 46 | Cost & Supply For E. W.C with 10lit Flish tank including cost and conveyance of all materials to work site and labor charges etc complete. |
| 47 | Cost & Supply For Flat Black Urinal Trap including cost and conveyance of all materials to work site and labor charges etc complete. |
| 48 | 'Supplying and fixing in position best quality and approved make Indian made white / colour glazed earthernware wash hand basin of size 550 x 400mm (with pedestal / without pedestal) with a pair of cast iron brackets, including cost 15mm dia brass CP pillar tap, 32mm dia \\"B\\" class GI waste pipe with rubber plug and chain, 15mm dia GM wheel valve, 15mm brass nipple, 15mm dia nylone connection, 32mm dia CP brass waste coupling including fixing of wash basin using CI brackets on to the wall in position with TW plugs and screws, rubber washers, white lead and giving necessary water supply connection and painting the brackets with two coat of painting over a priming coat of anti-corrosive paint including testing for leakages etc., complete complying with standard specification and as directed by the departmental officers. (The wash hand basin and specials should be got approved by the Executive Engineer before use on works). |
| 49 | Cost & Supply of Cudappah Slab including cost and conveyance of all materials to work site and labor charges etc complete. |
| 50 | Provision of painting cartoons in hall and toilet & Letters, Pictures & Board, etc. |
| 51 | Provision for Supplying and fabricating and fixing SS Hand Rail |
| 52 | Provision for Name board |
| 53 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Aug 07, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 01, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 16 daysSep 01, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 16 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender