Tender For Construction Of New Chc Building (G+2) At Bhela Of Nuapada District.
Tender Overview
Project Description
Tender for Construction Of New Chc Building (G+2) At Bhela Of Nuapada District.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 10-Aug-2026 | 2ND CORRIGENDUM | Date | 24-Aug-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | CIVIL WORKEarth work in excavation of foundation in all kinds of soil within 50m initial lead and 1.50m initial lift including rough dressing breaking clods maximum 5cm to 7cm & laying in layers not exceeding 0.3m depth for the work complete including shoring, shuttering & dewatering (if required) with cost of all Labour, Labour cess ,Hire & Running charges of the water pumps, Sundries, T & P required for the work complete as directed by the Engineer- in- charge.Building Proper |
| 2 | Compound wall |
| 3 | Security room and Gate complex |
| 4 | Drainage |
| 5 | Filling in foundation trenches and plinth, with excavated earth including laying the earth in layers not exceeding 23.5 cm thick ramming & watering with all leads & lifts including cost of all labour,T&P completed as directed by the Engineer-in-charge. Building Proper Proper |
| 6 | Compound wall |
| 7 | Security room and Gate complex |
| 8 | Drainage |
| 9 | Supplying and filling in foundation and plinth with good quality river sand including watering, ramming with cost, conveyances, royalties of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.Building Proper |
| 10 | Compound wall |
| 11 | Internal road |
| 12 | Security room and Gate complex |
| 13 | Drainage |
| 14 | Providing & applying of pre constructional anti-termite treatment by drilling 12mm dia holes at distance of 30cm @ junction of wall & floor about 300mm apart deep enough to reach the soil below & chemical emulsion (IMIDACHLOPRIED 30.5SC mixed with 47.5ltr water) pumped these holes to soak the soil @ 1 ltr solution of each hole as per manufactures specification & the holes should be pluged the filling materials including cost of all materials, labour,conveyance, T&P , all taxes and hire charges of machinaries as per direction of Engineer-in-charge.(make-premise-BAYER,Paxton-FMC,ozie-KALYANI)Building Proper |
| 15 | Security room and Gate complex |
| 16 | Providing and laying plain cement concrete of proportion (1:3:6) in foundation and floors using 4 cm. size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, royalties of all materials and cost of all labours,labour cess, T&P etc complete as per the direction of the Engineer-in-charge.Building Proper |
| 17 | Compound wall |
| 18 | Security room and Gate complex |
| 19 | Drainage |
| 20 | Plain cement concrete (1:2:4) using 12mm size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering and laying concrete in layers, watering, curing etc. complete including cost, conveyance, royalties of all materials with labour,labour cess and T&P etc. required for the work complete as per the direction of the Engineer-in-charge. Ground Floor |
| 21 | Fly Ash brick masonry in cement mortar (1:6) in foundation & plinth using Fly Ash bricks of 23 x 11 x 8 cm size having a crushing strength of not less than 75 kg./sqcm with dimensional tolerance ± 2% including splays cutting circular moulding chamfering and corbelling and similar such type of works with all necessary projections watering and curing after immersing the bricks in water at least for six hours before use including cost, conveyance, and royalties of all materials with all labour,labour cess and T & P required for the work complete in all respect as per direction of Engineer-in-ChargeBuilding Proper |
| 22 | Compound wall |
| 23 | Security room and Gate complex |
| 24 | Fly Ash brick masonry in cement mortar (1:6) in super structure using Fly Ash bricks of 23 x 11 x 8 cm size having a crushing strength of not less than 75 kg./sqcm with dimensional tolerance ± 2% including splays cutting circular moulding chamfering and corbelling and similar such type of works with all necessary projections watering and curing after immersing the bricks in water at least for six hours before use including cost, conveyance, royalties and taxes of all materials with all labour,labour cess and T & P required for the work complete in all respect as per direction of Engineer-in-Charge.Building ProperGround Floor |
| 25 | First floor |
| 26 | Second floor |
| 27 | Terrace floor |
| 28 | Compound wall |
| 29 | Security room and Gate complex |
| 30 | Fly Ash brick masonry in cement mortar (1:4) in super structure using Fly Ash bricks of 23 x 11 x 8 cm size having a crushing strength of not less than 75 kg./sqcm with dimensional tolerance ± 2% including splays cutting circular moulding chamfering and corbelling and similar such type of works with all necessary projections watering and curing after immersing the bricks in water at least for six hours before use including cost, conveyance, royalties and taxes of all materials with all labour,labour cess and T & P required for the work complete in all respect as per direction of Engineer-in-Charge.Building ProperGround Floor |
| 31 | First floor |
| 32 | Second floor |
| 33 | Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 250 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. But excluding cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position.Building ProperFooting |
| 34 | Plinth Beam |
| 35 | Compound wallFooting |
| 36 | Plinth Beam |
| 37 | Security room and Gate complex Footing |
| 38 | Plinth Beam |
| 39 | R.C.C Column Ground Floor |
| 40 | First floor |
| 41 | Second floor |
| 42 | Terrace floor |
| 43 | Compound wall |
| 44 | Security room and Gate complex (GF) |
| 45 | Security room and Gate complex (FF) |
| 46 | R.C.C LintelGround Floor |
| 47 | First floor |
| 48 | Second floor |
| 49 | Terrace floor |
| 50 | Security room and Gate complex |
| 51 | R.C.C ChajjaGround Floor |
| 52 | First floor |
| 53 | Second floor |
| 54 | Terrace floor |
| 55 | R.C.C Roof BeamGround Floor |
| 56 | First floor |
| 57 | Second floor |
| 58 | Terrace floor |
| 59 | Compound wall |
| 60 | Security room and Gate complex (GF) |
| 61 | Security room and Gate complex (FF) |
| 62 | R.C.C SlabGround Floor |
| 63 | First floor |
| 64 | Second floor |
| 65 | Terrace floor |
| 66 | Security room and Gate complex (GF) |
| 67 | Security room and Gate complex (FF) |
| 68 | R.C.C Stair caseGround Floor |
| 69 | First floor |
| 70 | Second floor |
| 71 | RCC Wall |
| 72 | R.C.C. work of M-20 in following works using 12 mm. to 20 mm. (½” to ¾”) size (20 mm. not to exceed 25%) hard black crusher broken granite stone chips of approved quality from approved quarry including hoisting, lowering, laying and compacting concrete, watering curing, centering, shuttering and finishing the exposed surfaces smooth with cost, conveyance, royalties, taxes of all materials with all labour,labour cess and T & P required for the work etc. complete in all respect but excluding the cost and conveyance of M.S. rods or Tor steel and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending, binding and tying the grills and placing in proper position and as per the direction of the Engineer-in-charge. DrainageDrain Bottom slab |
| 73 | Drain wall |
| 74 | Supplying Cutting, straightening coiled or bent up M.S. Rod or tor steel of primary steel producers such as SAIL / Tiscon / RINL / JINDAL STEEL / SHYAM STEEL (grade Fe-500D) etc. including bending, binding, welding, wastage & over lapping and jointing if necessary and tying the grills and placing in position as required for R.C.C. Work and for providing fan hooks as required, hoisting, lowering, laying including cost, conveyances of M.S. Rod or tor steel and binding wires of 18 to 20 gauge and labour required for the work for bending, binding and tying the grills in all floors with labour cess etc. (payment will be made on standard weight of B.I.S. for M.S. Rods or tor steel only) etc. complete as per specification & direction of Engineer-in-charge..Building ProperGround Floor |
| 75 | First floor |
| 76 | Second floor |
| 77 | Terrace floor |
| 78 | Compound wall |
| 79 | Security room and Gate complexGround Floor |
| 80 | First floor |
| 81 | Drainage |
| 82 | Providing 12 mm thick cement plaster with cement mortar of mix (1:6) with screened and washed sharp sand for mortar and finished smooth to the rough surface of walls in all heights after racking out joints including watering and curing, rounding of corners, providing grooves where ever necessary with cost, conveyance, royalties of all materials with cost of all labour,labour cess, T&P, and scaffolding required for the work etc. complete in all respect as directed by the Engineer in charge. Building ProperGround Floor |
| 83 | First floor |
| 84 | Second floor |
| 85 | Terrace floor |
| 86 | Compound wall |
| 87 | Security room and Gate complex (GF) |
| 88 | Security room and Gate complex (FF) |
| 89 | Providing 16 mm thick cement plaster with cement mortar of mix (1:6) with screened and washed sharp sand for mortar and finished smooth to the rough surface of walls in all heights after racking out joints including watering and curing, rounding of corners, providing grooves where ever necessary with cost, conveyance, royalties of all materials with cost of all labour,labour cess, T&P, and scaffolding required for the work etc. complete in all respect as directed by the Engineer in charge. Building ProperGround Floor |
| 90 | First floor |
| 91 | Second floor |
| 92 | Terrace floor |
| 93 | Compound wall |
| 94 | Security room and Gate complex |
| 95 | Providing 6 mm thick cement plaster with cement mortar of mix (1:4) with screened and washed sharp sand for mortar and finished smooth to R.C.C. work after closed deep chipping & slurry treatment including watering and curing, rounding of corners, providing grooves where ever necessary with cost, conveyance, royalties of all materials with cost of all labour,labour cess, T&P, and scaffolding required for the work etc. complete in all respect as directed by the Engineer in charge.Building ProperGround Floor |
| 96 | First floor |
| 97 | Second floor |
| 98 | Terrace floor |
| 99 | Compound wall |
| 100 | Security room and Gate complex |
| 101 | Fixing granite tiles of approved dimension area above 0.4 sqm (20mm thick) in floor, treads of steps and landing on 20mm thick bed of cement mortar (1:4) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing and polishing etc. complete with cost, conveyance, royalties of all materials complete in all respects as per direction of Engineer-in-Charge.Building ProperGround Floor |
| 102 | First floor |
| 103 | Second floor |
| 104 | Fixing granite tiles of approved dimension area above 0.1 up to 0.4 sqm (10mm thick) in Dados, treads of steps and landing on 12mm thick cement mortar (1:3) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing and polishing etc. complete with cost, conveyance, royalties and taxes of all materials complete in all respects as per direction of Engineer-in-Charge.Building ProperGround Floor |
| 105 | First floor |
| 106 | Second floor |
| 107 | Providing full body matt finish vitrified tile flooring using vitrified tiles having thickness of min 10mm conforming to IS 13755 of 1200x600 (homogeneous) of premium quality (JOHNSON / SOMANY/ KAJARIA/ RAK) in floors, treads on steps and landings on 20mm thick bed of cement mortar of mix (1:4) laid in proper slope and gradient with screened and washed sharp sand for mortar and fixing with neat white cement slurry,grouting the joints with neat white cement slurry mixed with required quantities of pigments of approved make to match the shades of the vitrified tile if required , watering and curing for 21 days, including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour,Labour cess , sundries, T&P required for the work, complete in all respect as per specification and direction of Engineer-in-charge.Building ProperGround Floor |
| 108 | First floor |
| 109 | Second floor |
| 110 | Providing, fitting, fixing vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mm x 600mm Plain (Ivory) of approved make (JOHNSON / SOMANY/ KAJARIA/ RAK) as directed by Engineer-in-charge in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing and polishing etc. complete with cost, conveyance, royalties of all materials all labour,labour cess complete in all respects as directed by the Engineer in charge.Building ProperGround Floor |
| 111 | First floor |
| 112 | Second floor |
| 113 | Supplying, fitting and fixing full body vetrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mm x 600mm Plain (Ivory) of approved make (JOHNSON / SOMANY/ KAJARIA/ RAK) in floors on 20mm thick bed of C.M. (1:4)(1cement:4course sand) and filling the joint with white cement mixed with pigment to match the shades of the tileincluding cost of all materials, labour, labour cess, T&P etc. required for the work complete in all respect as directed by the Engineer in charge.Building ProperSecond floor |
| 114 | Security room and Gate complex |
| 115 | Fixing of Ceramic wall tiles of premium grade having thickness 6.50mm to 7.00mm confirming to IS 13753 of size 60cm x 30cm special plain / printed series in dados skirting & riser of steps on 12mm thick cement plaster 1:3 joined with neat cement slurry mixed with pigments to match the shade of the tiles, including rubbing & polishing etc. complete including cost, conveyance, royalties of all materials, labour with T&P complete in all respects as per direction of Engineer-in-Charge.(make-Somany,Johnson,RAK,Kajaria) Building ProperGround Floor |
| 116 | First floor |
| 117 | Second floor |
| 118 | Security room and Gate complex |
| 119 | Providing and laying antimicrobial 2mm thick homogeneous PVC vinyl flooring RQ Restorable Quality (single layer of PVC) with Weight 2950g/m2, PUR (Polyurethane reinforced), RQ Abrasion group T:<4.00 mm,residual indentation approx.0.04 mm,castor wheel test qualified, dimensional stability 30.04%, static electrical charge < 2 kv, good resistance of scratch, slip chemical and fire, IMO Marine 0575 certified, doesn't favor in growth of fungi & bacteria. 100% recyclable. VOC emissions after 28 days of installations (lower than < 10ug/m3). The sheets at the corners and floor wall junctions shall be laid with PVC cove to avoid sharp joints as per direction of Engineer-In-Charge. The joints shall be made joints seamless with PVC weld rod. Rates inclusive of Corner Coves and welding. First Floor |
| 120 | Second floor Please Enable Macros to View BoQ information |
| 121 | Second floor Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 1 dayBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender