Tender For For The Work Of Installation Of A 05 Mva Power Transformer At The 33/11 Kv Vishunpura Substation For The New District Jail, Padrauna, Kushinagar, Along With The Construction Of An 11 Kv Feeder Line From The 33/11 Kv Vishunpura Substation T
Tender Overview
Project Description
Tender for For The Work Of Installation Of A 05 Mva Power Transformer At The 33/11 Kv Vishunpura Substation For The New District Jail, Padrauna, Kushinagar, Along With The Construction Of An 11 Kv Feeder Line From The 33/11 Kv Vishunpura Substation To The New District Jail, Padrauna On The Deposit Scheme Under The Electricity Secondary Works Division, Gorakhpur On The Full Turnkey Basis.
BOQ
| Sl. No. | Item Description |
| 1 | Part A (Materials Provided by contractor) |
| 2 | 5 MVA Power Transformer 33/11 KV |
| 3 | 33KV SINGLE T/F Control Panel |
| 4 | 33 KV VCB 800A, 750 MVA with Steel Structure |
| 5 | 33 KV C.T 400/200/1A |
| 6 | Structure of 33 KV CT |
| 7 | 33 KV LA |
| 8 | Structure of 33 KV LA |
| 9 | 33 KV Fuse Set |
| 10 | Structure of 33KV Fuse set |
| 11 | 33 KV Bus Isolator |
| 12 | Structure of 33 KV Bus Isolator |
| 13 | 33 KV Post Insulator |
| 14 | Structure of 33 KV Post Insulator |
| 15 | 90 Ib, Rail pieces (44.64 Kg/M) |
| 16 | ACSR Dog Conductor |
| 17 | 11 KV XLPE Cable 3×185 mm2 |
| 18 | 11 KV VCB 600/300/5A , 350 MVA I/C |
| 19 | 11 KV VCB 200/100/5A Outgoing |
| 20 | 11 KV Bus Coupler |
| 21 | 11 KV cable jointing kit 3×185 mm outdoor |
| 22 | 11 KV cable jointing kit 3×185 mm Indoor |
| 23 | 24-volt Battery and battery charger |
| 24 | Armoured Copper Control Cable 2×2.5 mm2 |
| 25 | Armoured Copper Control Cable 4×2.5 mm2 |
| 26 | P.G Clamp for Dog |
| 27 | Structure For cable support with cable holding clamp |
| 28 | \\"L\\" Type Structure for Neutral |
| 29 | Rubber Mat |
| 30 | M.S. Nut & Bolt Various size with washer |
| 31 | PCC POLE 11 Mtr |
| 32 | PCC POLE 8.5 Mtr |
| 33 | HDPE Pipe 6'' dia |
| 34 | ACSR ‘Weasel’ Conductor for 11KV Line |
| 35 | 11 KV X-arm |
| 36 | X-arm clamp |
| 37 | ‘F’ Bracket with Bolts and Nuts |
| 38 | 11 KV Polymer Pin Insulators |
| 39 | Danger Board with Clamps. |
| 40 | Barbed wire |
| 41 | Bolts, Nuts, & Washers |
| 42 | Earthing of Pole by M S Earthing Rod 20 x 2500 mm and 6 SWG earthing wire etc |
| 43 | Top Channel 100x50x6 mm, 2400 mm long |
| 44 | Clamp for Top channel, dropper angle, GI Pipe & Cable with nut and bolt |
| 45 | Complete Stay Set |
| 46 | Disc Fitting for T&C 45 KN |
| 47 | Disc Insulator T&C 45 KN |
| 48 | PG Clamp for weasel |
| 49 | Bracing set 4.3 x 4.3 Mtr Angle Iron 65x65x6 mm with holding clamp |
| 50 | 11 KV E Bracket |
| 51 | 11 KV T-off Channel |
| 52 | T-off Channel holding clamp with Bolts and Nuts |
| 53 | 11KV Dropper angle |
| 54 | MS Guarding Angle |
| 55 | GI Wire 6 SWG |
| 56 | Gi Wire 8 SWG |
| 57 | Holding Clamp for Guarding Angle |
| 58 | 3Ph-4W 11 kv smart meter (AMI Compatible) |
| 59 | 11 KV CT PT METERING POLE MOUNTED UNIT |
| 60 | 11KV Pilfer proof metering cubical |
| 61 | 11 KV Cable Jointing Kit 3x185 mm² outdoor Straight Through |
| 62 | PART – B- WORKErection, grouting & painting (Except VCB structure) of following fabricated structures as per RESSPO Drawing. |
| 63 | 33 KV Bus Isolator structure |
| 64 | 33 KV L.A. structure |
| 65 | 33 KV Post insulator structure |
| 66 | 33 KV fuse set structure |
| 67 | 33KV C.T. structure |
| 68 | 33 KV VCB Structure |
| 69 | Insttalation, mounting & fitting of equipment on erected structures as per RESSPO Drawing. |
| 70 | 33 KV Bus isolator complete |
| 71 | 33 KV L.A. |
| 72 | 33 KV Post insulator complete |
| 73 | 33 KV fuse set |
| 74 | 33KV C.T. |
| 75 | 33 KV VCB |
| 76 | Construction of power transformer plinth for 05 MVA transformer of size 3.5 x 3.5 x 0.5 mtr or as per site requirement. including cost of all material as per requirement. (As per UPPCL Drawing) |
| 77 | Transformer body earthing complete including cost of G.I. strip, G.I. pipe 1.5” dia 60’ long and other earthing materials. (delta type) (As per UPPCL Drawing) |
| 78 | Neutral earthing of 5 MVA transformer completes including cost of G.I. strip, G.I. pipe 1.5” dia 60’ long and other earthing materials. (delta type) (As per UPPCL Drawing) |
| 79 | Indoor Equipment earthing (11 kv pannels) including cost of G.I. strip, G.I. pipe 1.5” dia 60’ long and other earthing materials. (delta type) both delta earthing will be connected with 32mm round bar (As per UPPCL Drawing) |
| 80 | Separate earthing of Indoor Equipment (33 kv control pannel) including cost of G.I. strip, G.I. pipe 1.5” dia 60’ long and other earthing materials. (delta type) |
| 81 | Special earthing of LA including cost of G.I. strip, G.I. pipe 1.5” dia 40’ long and other earthing materials. (delta type) |
| 82 | Providing and Making of Outdor Earthing (Eartmat) for 5 MVA PowerTransformer as per UPPCL Norms. |
| 83 | Laying of 11 KV “XLPE” cable 3 x 185mm2 including digging of pits of size 0.5 x 0.5 mtr. covering of cable with sand and 1st class bricks around and top of the cable or laying in cable trench and covering with brick and sand, as per site requirement. (As per UPPCL Drawing) |
| 84 | Providing and erection of GI Pipe Earthing Complete for Cable jointing Kit with materials upto water Level (30') |
| 85 | Providing & grouting of Neutral stand with all required materials. |
| 86 | Providing & Grouting of cable stand and fastening cable by clamp with nuts and bolts mounting of cable at cable stand and connection of jumpers. |
| 87 | Jointing charges of 11 KV “XLPE” C/J kit 3 x185/300 mm2 indoor/outdoor/Straight. |
| 88 | Making of control cable trench with cover and hanger by providing all required materials. as per UPPCL Norms. |
| 89 | Construction of SSO's approached road 1.5 Mtr. wide in Switchyard by laying dry sand and interlocking bricks The work include proper plastering top & side of road and leveling & dressing of earth beneath the brick work on edge. |
| 90 | Copper control cable laying from switchyard to control room for 33 KV panel, CT, VCB, 5 MVA t/F in trench and making connection complete or as per Supervision Authority. |
| 91 | Size 2 x 2.5 mm2 |
| 92 | Size 4 x 2.5 mm2 |
| 93 | Shifting of 33/11 KV switchgear to control room and placing in control room with grouting of bolts and mounting of switchgear panels properly. |
| 94 | Electrical connection of 33/11 KV switchgear panel and fitting of Bus Bar. |
| 95 | Installation of 33 KV control panel for “VCB” with complete earthing and connection of battery and battery charger/inverter in control room and making all protection equipment connection. |
| 96 | Installation of 24 V Battery & Battery Charge/ Inverter with cabinet |
| 97 | Construction of Fire Wall between Transformers with all required material. (As per UPPCL Drawing) |
| 98 | Testing & commissioning charges of Substation. |
| 99 | Erection of Sectional T-Off, Single pole structure on 8.5 Mtr PCC Pole including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40mm brick ballast), back filling of earth, proper ramming & fitting of all accessories for Single circuit ( 11 KV T-off Channel, T-off Channel holding clamp with Bolts and Nuts, composite polymer pin, insulator, danger board with clamp, barbed wire earthing, etc. complete). |
| 100 | Erection of Single pole structure on 8.5 Mtr PCC Pole including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40mm brick ballast), back filling of earth, proper ramming & fitting of all accessories for Single circuit (‘V' type cross arm 100 x 50 x 6 mm, M.S. Channel (7.9 Kg./M) clamps with bolt and nut, composite polymer pin, insulator, danger board with clamp, barbed wire earthing, etc. complete). |
| 101 | Erection of Double pole structure on 8.5 Mtr PCC Pole including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast), back filling of earth, proper ramming & fitting of all accessories ((M.S. angle iron 65 x 65 x 6 mm bracing with clamps, 100x50mmX2240 mm with clamps, danger board with clamp, barbed wire earthing, etc. complete)) . |
| 102 | Erection of Sectional T-Off, Single pole structure on 11 Mtr PCC Pole including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40mm brick ballast), back filling of earth, proper ramming & fitting of all accessories for Single circuit ( 11 KV T-off Channel, T-off Channel holding clamp with Bolts and Nuts, composite polymer pin, insulator, danger board with clamp, barbed wire earthing, etc. complete). |
| 103 | Erection of Single pole structure on 11mtr PCC Pole including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40mm brick ballast), back filling of earth, proper ramming & fitting of all accessories for double circuit ( 'V' type cross arm 100 x 50 x 6 mm, M.S. Channel (7.9 Kg./M) clamps with bolt and nut, composite polymer pin, insulator, danger board with clamp, Alluminium paint, red oxide paint, barbed wire earthing, etc. complete). |
| 104 | Erection of Double pole structure on 11Mtr PCC Pole including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast), back filling of earth, proper ramming & fitting of all accessories (M.S. angle iron 65 x 65 x 6 mm bracing with clamps, top channel with clamps, danger board with clamp, barbed wire earthing, etc. complete). |
| 105 | Erection of double pole structure for one side O/H & one sidecable rising on 8.5 mtr PCC Pole including all works of evocation of pit, pole erection, making plinth for poles, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast), back filling of earth, proper ramming & fitting of all accessories (M S Channel 100x50 mm 2400 mm Long with clamps, 100x50mmX2240 mm with clamps, danger board with clamp, barbed wire earthing, etc. complete). |
| 106 | Erection of double pole structure for cable rising only, on 8.5 mtr PCC Pole including all works of evocation of pit, pole erection, making plinth for poles, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast), back filling of earth, proper ramming & fitting of all accessories (M S Channel 100x50 mm 2400 mm Long with clamps, 100x50mmX2240 mm with clamps, danger board with clamp, barbed wire earthing, etc. complete). |
| 107 | Erection of double pole structure for one side O/H & one sidecable rising on 11 mtr PCC Pole including all works of evocation of pit, pole erection, making plinth for poles, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast), back filling of earth, proper ramming & fitting of all accessories (M S Channel 100x50 mm 2400 mm Long with clamps, 100x50mmX2240 mm with clamps, danger board with clamp, barbed wire earthing, etc. complete). |
| 108 | Grouting of stay rods (16 x 1800) mm including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing. |
| 109 | Guarding between two poles like single poles, double poles, four poles, etc. to guard LT, 11 KV Line telephone and river crossing, road crossing etc. with G.I. wire no. 6 SWG and G.I. wire no. 8 SWG, cutting, fabrication and fixing of guarding channel 75 x 40 x 3010 mm with clamps nut & bolts etc. as per drawing. |
| 110 | Laying, spreading, lifting and final sagging of 3 phases of ACSR weasel conductor in accordance with profile and sag chart including binding, Jumpering and fixing of P.G. Clamp as per requirement in 03 Nos. conductor in parallel. |
| 111 | Laying of 11 KV 3x185 mm² ‘XLPE’ cable of double circuit by digging pit & making trench in Proper size (1.2M depth x1M wide) below ground level by fixing bricks(4½˝)on both side of trench wall and 9˝ brick work at the centre of the trench along the cable. Fixing brick slab on top after filling sand around both the cable including cost of bricks/ as per site requirement HDD Method by drilling machine can be used. |
| 112 | Laying of 11 KV 3x185 mm² cable(D/C) with HDPE Pipe, by HDD(Trenchless) Method. |
| 113 | Laying of 11 KV ‘XLPE’ cable in air after providing 6” dia GI pipe 3 m long & Looping work Complete. |
| 114 | Labour charges for inserting of MS Pipe, rising of 11 KV cable, Clamping on MS Pipe & cable and jumpering complete work. |
| 115 | Chopping of branches of trees of eucalyptus, Neem, Keekar and other kind of trees along the route of the line and disposal of the same at suitable place. (Including existing line) |
| 116 | Road restoration charges for Footpath side of RCC road in case of manual digging. |
| 117 | Installation, connection & testing of CT/PT unit, PPMC & TVM with complete earting and all work. |
| 118 | Painting of Sub-Station structure & Equipment Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender