Tender For Nabard-Ridf Tranche Xxx - Renovation Of Matsyafed Ice & Freezing Plant (Mifp),Ernakulam-Upgradation Of Cold Storage, Blast Freezer, Ante Room & Allied Works
Tender Value
2.37 Crore
Estimated cost
Bid Submission
01 Sep 2026
22 days left
EMD
1 Lakhs
Bank guarantee accepted
Document Fee
8270
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Ernakulam → Kerala
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Nabard-Ridf Tranche Xxx - Renovation Of Matsyafed Ice & Freezing Plant (Mifp),Ernakulam-Upgradation Of Cold Storage, Blast Freezer, Ante Room & Allied Works
BOQ
| Sl. No. | Item Description |
| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Matsyafed Head Office, Kamaleswaram, Thiruvananthapuram Work Name : NABARD-RIDF Tranche XXX - Renovation of Matsyafed Ice & Freezing Plant (MIFP),Ernakulam-Upgradation of Cold Storage, Blast Freezer, Ante Room & Allied Works Contract No: Bidder Name : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Item.No. Item Description Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes TOTAL AMOUNT Without Taxes TOTAL AMOUNT In Words |
| 2 | Cold Storages |
| 3 | 15.13.1Taking out doors, windows and clerestory window shutters (steel or wood ) includingstacking within 50 metres lead:Of area 3 sq. metres and below |
| 4 | OD103855/2026-2027Dismantling thermocole of size up to 250mm from walls, ceilings, and floors, asdirected by the officials. etc complete. |
| 5 | OD103854/2026-2027Disposal of thermocole removed from walls, ceilings, and floors, and disposing ofthese debris at the municipal dumping yard as directed by the officials. |
| 6 | 15.58Demolishing R.C.C. work by mechanical means and stockpiling at designatedlocations and disposal of dismantled materials up to a lead of 1 kilometre, stackingserviceable and unserviceable material separately including cutting reinforcement bars. |
| 7 | 15.7.4Demolishing brick work manually / by mechanical means including stacking ofserviceable material and disposal of unserviceable material within 50 metres lead asper direction of Engineer-in-Charge.In cement mortar |
| 8 | 50.6.1.2Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x20cmor nearest available size confirming to IS 2185 part I of 1979 for super structure up tofloor two level thickness 20cm and above in: CM 1:6 ( 1 cement: 6 coarse sand) etccomplete. |
| 9 | OD95135/2025-2026Supplying and fixing Insulated sliding doors of size 1.500m x 2.200m of thickness120mm puff insulated covered with S.S sheet 0.5 mm thickness on both sides runningaluminium rails locking systems heater channel at the bottom guide for stoping toprails with wheels aluminium door frame 120 mm x 50 mm etc complete as directed bythe officers of Matsyafed. |
| 10 | OD95096/2025-2026 Supplying and fixing 150 mm Puff insulated Double side panels one side S.S 0.5mm (S.S 304 2B) and other side PCGI of 0.6mm thickness (65micron coating thicknessand 450gsm zinc coated) panel with calmlock (PUF density 40-42kg/m3) on wallsand ceiling including all cost of materials and labour etc. complete as directed by theofficers of Matsyafed. for cold storage walls and ceiling.[ Manufacturer's materialsdata sheet, galvanising thickness testing certificate from the third party(authorisedapproved agencies) to be submitted before commencement of the work ] |
| 11 | 4.1.8Providing and laying in position cement concrete of specified grade excluding the costof centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarsesand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mmnominal size derived from natural sources) |
| 12 | OD320634/2025-2026Supplying and fixing 150 mm Expanded Polystyrene slabs of density 24kg/m3including all cost of materials and labour as specified, as directed by the officers ofMatsyafed. for floor of cold store. |
| 13 | OD346710/2025-2026Supplying and laying tarfelt over the thermocole slabs including all cost of materialsand labour etc. complete as directed by the officers of Matsyafed. |
| 14 | 5.9.5Centering and shuttering including strutting, etc. and removal of form for:Lintels,beams, plinth beams, girders bressumers and cantilevers |
| 15 | 5.22A.6Steel reinforcement for R.C.C work including straightening, cutting, bending, placingin position and binding all complete above plinth level.Thermo - Mechanically Treatedbars of grade Fe-500D or more |
| 16 | 5.3Reinforced cement concrete work in beams, suspended floors, roofs, having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills,staircases and spiral stair cases up to floor five level excluding the cost of centering,shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (ZoneIII) derived from natural sources: 3 graded stone aggregate 20 mm nominal sizederived from natural sources). |
| 17 | OD32234/2026-2027Supplying and applying bituminous primer over plastered surface including all cost ofmaterials andlabour etc. complete as directed by the officers of Matsyafed. |
| 18 | Blast Freezer |
| 19 | 15.13.1Taking out doors, windows and clerestory window shutters (steel or wood ) includingstacking within 50 metres lead:Of area 3 sq. metres and below |
| 20 | OD103877/2026-2027Dismantling thermocole of size up to 250mm from walls, ceilings, and floors, asdirected by the officials. etc complete. |
| 21 | OD103876/2026-2027Disposal of thermocole removed from walls, ceilings, and floors, and disposing ofthese debris at the municipal dumping yard as directed by the officials. |
| 22 | 15.58Demolishing R.C.C. work by mechanical means and stockpiling at designatedlocations and disposal of dismantled materials up to a lead of 1 kilometre, stackingserviceable and unserviceable material separately including cutting reinforcement bars. |
| 23 | OD95329/2025-2026Supplying and fixing Insulated Hinged doors of size 1.200m x 2.100m of thickness150mm puff insulated covered with S.S sheet 0.5mm thickness on both sides finishedwith necessary hinges, locking systems heater with wheels aluminium door frame 120mm x 50 mm etc. complete as directed by the officers of Matsyafed. |
| 24 | OD95327/2025-2026Supplying and fixing 200 mm Puff insulated Double sided S.S 0.5mm (S.S 304 2B )panel with camlock (PUF density 40-42kg/m3) on walls and ceiling including allcost of materials and labour etc. complete as directed by the officers of Matsyafed. forBlast freezer walls and ceiling. |
| 25 | OD95283/2025-2026Supplying and fixing 250 mm Expanded Polystyrene slabs of density 24kg/m3including all cost of materials and labour as specified, etc. complete as directed by theofficers of Matsyafed. For floor of Blast Freezer. |
| 26 | OD95287/2025-2026Supplying and laying tarfelt over the thermocole slabs including all cost of materialsand labour etc.complete as directed by the officers of Matsyafed. |
| 27 | 5.9.5Centering and shuttering including strutting, etc. and removal of form for:Lintels,beams, plinth beams, girders bressumers and cantilevers |
| 28 | 5.22.6Steel reinforcement for R.C.C work including straightening, cutting, bending, placingin position and binding all complete upto plinth levelThermo - Mechanically Treatedbars of grade Fe-500D or more |
| 29 | 5.3Reinforced cement concrete work in beams, suspended floors, roofs, having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills,staircases and spiral stair cases up to floor five level excluding the cost of centering,shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (ZoneIII) derived from natural sources: 3 graded stone aggregate 20 mm nominal sizederived from natural sources). |
| 30 | OD95286/2025-2026Supplying and applying bituminous primer over plastered surface including all cost ofmaterials andlabour etc. complete as directed by the officers of Matsyafed. |
| 31 | 10.2Structural steel work riveted, bolted or welded in built up sections, trusses and framedwork, including cutting, hoisting, fixing in position and applying a priming coat ofapproved steel primer all complete. |
| 32 | OD95331/2025-2026Supplying and laying 4 mm thick Aluminium chequred sheet in floor includingriveting etc. complete to provide a uniform surface including all cost of materials andlabour etc. complete. as directed by the officers of Matsyafed. |
| 33 | Ante Room |
| 34 | 15.13.1Taking out doors, windows and clerestory window shutters (steel or wood ) includingstacking within 50 metres lead:Of area 3 sq. metres and below |
| 35 | OD103891/2026-2027Dismantling thermocole of size up to 250mm from walls, ceilings, and floors, asdirected by the officials. etc complete. |
| 36 | OD103890/2026-2027Disposal of thermocole removed from walls, ceilings, and floors, and disposing ofthese debris at the municipal dumping yard as directed by the officials. |
| 37 | OD95376/2025-2026Supplying and fixing 80 mm Puff insulated Double side PCGI of 0.6mm thickness(65micron coating thickness and 450gsm zinc coated) panel with camlock (PUFdensity 40-42kg/m3) on walls and ceiling including all cost of materials and labouretc. complete as directed by the officers of Matsyafed. for Ante-Room walls andceiling & partition walls. [ Manufacturer's materials data sheet, galvanising thicknesstesting certificate from the third party(authorised approved agencies) to be submittedbefore commencement of the work ] |
| 38 | OD102858/2025-2026Supplying and fixing Insulated sliding doors of size 1.500m x 2.200m of thickness80mm puff insulated covered with S.S sheet 0.5 mm thickness on both sides runningaluminium rails locking systems heater channel at the bottom guide for stoping toprails with wheels aluminium door frame 120 mm x 50 mm etc complete as directed bythe officers of Matsyafed. |
| 39 | OD32977/2026-2027Supplying and fixing 100 mm Expanded Polystyrene slabs of density 24kg/m3including all cost of materials and labour as specified,etc. complete as directed by theofficers of Matsyafed. for floor of Ante-Room. |
| 40 | OD33019/2026-2027Supplying and laying tarfelt over the thermocole slabs including all cost of materialsand labour etc. complete as directed by the officers of Matsyafed. |
| 41 | 5.9.5Centering and shuttering including strutting, etc. and removal of form for:Lintels,beams, plinth beams, girders bressumers and cantilevers |
| 42 | 5.22A.6Steel reinforcement for R.C.C work including straightening, cutting, bending, placingin position and binding all complete above plinth level.Thermo - Mechanically Treatedbars of grade Fe-500D or more |
| 43 | 5.3Reinforced cement concrete work in beams, suspended floors, roofs, having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills,staircases and spiral stair cases up to floor five level excluding the cost of centering,shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (ZoneIII) derived from natural sources: 3 graded stone aggregate 20 mm nominal sizederived from natural sources). |
| 44 | OD33020/2026-2027Supplying and applying bituminous primer over plastered surface including all cost ofmaterials andlabour etc. complete as directed by the officers of Matsyafed. |
| 45 | False Ceiling |
| 46 | OD347902/2025-2026Providing and fixing stainless steel sheets for false ceiling works using approvedquality stainless steel sheets of required thickness (minimum 0.5 mm or as approvedby the Engineer-in-charge), fixed in proper alignment and level. The work includesproviding and fixing suitable supporting framework consisting of stainless steel / MSrods, hangers, brackets, and necessary supporting members anchored to the roof slabusing approved fasteners. The rods shall be properly spaced, aligned, and secured toensure rigidity and stability of the ceiling system. All joints shall be properly finishedand made neat. Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Aug 07, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 01, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 22 daysSep 03, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 24 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender