Rural Development Government Departments Closing in 10 days TDR #56894380

Tender For Construction And 5 Year Maintenance Works Of District- Kanpur Nagar Under flood damage repair Group Upfdr- 207Name Of Road:- Gangupur Pihani Hilalpur Kharamau To Araul Makanpur Road,(Ch.0.00-4.00Km) Pkg No Up 4193Name Of Road:- Ghat Ur Kus

Issued by Government Departments · Sultanpur, Uttar Pradesh
Tender Value
8.28 Crore
Estimated cost
Bid Submission
20 Aug 2026
10 days left
EMD
17 Lakhs
Bank guarantee accepted
Document Fee
6000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Sultanpur → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Construction And 5 Year Maintenance Works Of District- Kanpur Nagar Under flood damage repair Group Upfdr- 207Name Of Road:- Gangupur Pihani Hilalpur Kharamau To Araul Makanpur Road,(Ch.0.00-4.00Km) Pkg No Up 4193Name Of Road:- Ghat Ur Kusmanda Devi To Gucchhupur Faridpur Vai Banhari,(Ch.0.00-5.300Km) Pkg No Up 4195

BOQ

Name of Work:- Construction and 5 year Maintenance Works of District- Kanpur Nagar Under FDR Group UPFDR- 207Name of Road:- Gangupur Pihani Hilalpur Kharamau To Araul Makanpur road,(ch.0.00-4.00km) Pkg No UP 4193Name of Road:- Ghat ur Kusmanda Devi To Gucchhupur Faridpur vai Banhari,(ch.0.00-5.300km) Pkg No UP 4195
Sl. No. Item Description
1Name of Road:- Gangupur Pihani Hilalpur Kharamau To Araul Makanpur road,(ch.0.00-4.00km) Pkg No UP 4193
2Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. Non thorny jungle) ( By Mechanical Means)
3Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 .
4Construction of Embankment with approved soil with a lift upto 1.5 m laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet requirement of table 300.1 and 300.2
5Construction of Embankment with approved soil with a lift upto 1.5 m and lead 1000 mts laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet requirement of table 300.1 and 300.2
6Construction of Subgrade and Earthen Shoulder with approved soil with all lifts and leads, laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet at least 100 % procter density complete to specification requirements
7Construction of Subgrade and Earthen Shoulder with approved soil with all lifts and leads 1000 mts, laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet at least 100 % procter density complete to specification requirements
8Stabilization of in-situ (existing pavement crust) or soil or otherwise sub base/ base course up to the required depth by cold in-situ recycling using cement and chemical additives/otherwise: Providing pulverizing, spreading, milling and mixing of chemical additives at the appropriate rate as per job mix design in accordance with IRC-SP-72-2015 , IRC-37-2012 & 2018 and IRC SP 89 (part II) 2018. Cementitious additive @ minimum 5-7% and CCS/CS additive should be spread on the existing pavement using a mobile truck mounted containerized cement/ additive spreader with micro processor controlled weighing and spreading system. The additive spreader shall have variable working width sufficient to cover whole pavement lane.The in-situ stabilization process shall be carried out by a mobile and self propelled stabilizer/reclaimer of working width of 2.4 m and with minimum engine HP of 440 kw with a variable working depth up to 50 cm.The resultant stabilized mix then would be profiled to the required grade, level and thickness using motor grader and the mix would be compacted using 20 tonne pad foot roller in combination with smooth wheel roller to achieve desired proctor density as per IRC 37-2012 & 2018 and complete in all respect and curing with water as required including all materials, labour and machinery etc. The entire in-situ process would be carried out in single pass with milling and pulverising of damaged asphalt pavement/soil/aggregates/soil-aggregate mixture to the desired depth and with simultaneous addition of additives and water with machine integrated spray bars fited on the wheeled self-propelled and vibratory pad foot roller to achieve the desired proctor density in all respects.The tandem roller be followed by Pneumatic Tyre Roller. The minimum unconfined compressive strength (UCS) of stabilized sub base/ base should be 4.5 to 7 MPa after 7 / 28 days of curing as per IRC-SP-72-2015 , IRC-37-2012 & 2018 . Also durability aspects (wet-dry cycles) of stabilized sub base should be satisfied as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018.The gradation mixes and materials should be as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The equipments to be used are binder spreader- water Tanker- Additive Truck- Recycler-Padfoot Roller(20T)+Single Drum Compactor-Grader- Tandom Roller-PT Roller (20 T)
9Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavater at OMC, and compacting with smooth wheeled roller to achieve the desired density as per clause 401(GSB Grade I)
10Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 kg/sqm using mechanical means as per Technical Specification Clause 502
11Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.275 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
12Providing and laying stress,Absorbing membrane interlayer (SAMI)/bitumen impregnated geeotextile layer after clearing of the road surface geotextile conforming to physical requirements of clause 703-3,laid over a tack coat of paving grade Bitumen 80-100 penetration, laid at the rate of 1.05kg per sqm over thoroughly cleaned and repaired surface to provide a water resistant membrane and crack retarding layer Paving fabric to be free of wrinkling and folding and to be laid before cooling of tack coat, brooming and rolling of surface with pneumatic roller to maximise paving fabric contact with pavement surface as per Technical Specification Clause 708 of MoRTH
13Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
14Construction of Panel concrete plain Cement concrete pavement, Thickness as per design, over a prepared subbasewith 43 grade cement or any other type as per Clause 1501.2.2 M 30 (Grade) coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate no exceeding 25mm, mixed in a concrete mixer of not less that 0.2 cum capacity and appropriate weigh batcher uusing approved mix design , laid in approved fixed side formwork ( Steel Channel, Laying and fixing of 125 micron thiock polythene film , wedges, steel plates including levelling th formwork as per Drawing ), Spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and fininshedin continous operation including provision of contraction and expansion, construction joints , applying debonding strips, primer, sealant , near approaches to bridge/culvert and construction joints, admixture as approved, curing of concrete slabs for 14 days. curing compound ( Where specified ) and water finishing to lines and grade as per drawing and Technical specification Clause 1501. PCc Grade M-30 Each Panesl ( 0.50 X0.50 ) thickness 125mm
15Laying brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing the same with three wheel road roller 80-100 kN as per Technical Specification Clause 412
16Providing and fixing of precast RCC Level Pillars in M15 ( 1:2.5:5 ) Nominal Mix having section .15X.15 M and Length 1.5 M which will be reused as Boundry/Guard Stones on curves including painting with specified colours after completion of work) as per drawing and technical specifications
17Providing and fixing of Reference Bench Mark / Temporary Bench Mark having section .0.35X.0.35 M and height 0.30 M above ground level in B/W 1:3 as per drawing and technical specifications
18Providing and fixing of Logo sign board A and B at starting point & Intermediate distance with a corrosion resitant 3mm thick aluminum composite panel (ACP) face to be fully covered with DM 5600 engineering grade prismatic/equivalent sheeting Type I as per IRC67:2012 with post of MS structure of square hollow section MS 75X75X6 mm and MS frame of 35X35X5 mm angle
19Providing and fixing of semi reflective curvature board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineering grade as per Clause 1701.3.9 of MORD for Rural Roads and approved drawing Clause 1701.2.2. (0.27 sqm area)
20Providing and fixing of semi reflective Village Sign board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineering grade as per Clause 1701.3.9 of MORD for Rural Roads and approved drawing Clause 1701.2.2. (0.27 sqm area)
21Providing and fixing of Maintenance information sign board with a corrosion resitant 3mm thick aluminum composite panel (ACP) face to be fully covered with DM 5600 engineering grade prismatic/equivalent sheeting Type I as per IRC67:2012 with post of MS structure of square hollow section MS 75X75X6 mm and MS frame of 35X35X5 mm angle
22Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703.Ordinary Kilometer Stone (Precast)
23Reinforced cement concrete M15 grade hectometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703.200 m Stone (Precast)
24Painting lines, dashes, arrows, etc. on roads with hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702
25Supply and Fixing of Pavement Maker (Cat Eye) Type X- ASTMD-4956-04 Avery denision /3-M (USA MAKE) consisting of ASA Plastic housing fitted with tightly adherent ploting compound. The housing shall contain prismatic to Glass covered prismatic reflecting face to reflect incident light
26Reinforced Cement Concrete M 25 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211 (Drain Cover)
27Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue/Foundation complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
28Providing concrete for plain/reinforced concrete M10 (1:3:6) in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
29Construction of Speed Breaker in full road way width in 3.70 Km longitudinal length with 100 mm thickness in midle 1.70 m length laid over previously laid bituminous surfacing course and previously laid base course on shoulders including zebra white epoxy painting in alternate pannel of size 50 cm x 50 cm in four rows along the edges.
30Providing & laying of Rubber Moulded Interlocking Concrete Block pavements having thickness 80 mm as per drawings and techinical Specification Clause 1504 (Laid over previously prepared subbase using 100mm thick GSB, excluding cost of GSB ) Prefer Zig Zag
31Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of side
32Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 (1: 3)
33Brick masonry work in cement mortar in sub structure complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 (1:4)
34Providing and laying filter media with granular crushed aggregates (63-45 mm size st. ballast)as per specification to a thickness of not less than 600 mm / 300 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing
35Plain/reinforced cement concrete in (1:2.5:5) substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 M-15
36Reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204. R.C.C grade M-20 (nominal mix)
37Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204. R.C.C grade M-25 (nominal mix)
38Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
39Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
40Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301
41Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 using Cement concrete blocks of size as per Table 1300.2 cast in cement concrete of grade M 15
42Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 (40 mm Brick Ballast)
43Backfilling behind abutment, wing wall and return wall using 40 mm brick ballast complete as per drawings & technical specification Clause 1204.3.8
44Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204
45Construction of Embankment with approved soil with a lift upto 1.5 m laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet requirement of table 300.1 and 300.2
46Plastering with cement mortar (1:4), 15mm thick on brickwork in substructure as per technical specification
47Painting two coats including prime coat with epoxy paint of approved brand on concrete/steel surfaces after through cleaning of surface to give an even shade as per drawing and Technical Specification Clause 1701
48Providing and fixing of precast RCC Guard Stone in M20 ( 1;2:4 ) Nominal Mix having section 0.25x0.25 M and Length 1.0 M fixed in M10 concrete of section 0.50x0.50 m in thickness 0.40 M as per drawing and technical specifications
49Fillling in foundation trenches using coarse sand/ screening as per drawing and technical specification Clause 305.3.9
50Laying Cement Concrete 450mm dia Pipe NP3 (burried conduits) on first class bedding of granular material in single row including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapet
51Providing and laying reinforced cement concrete 600mm dia pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry (1X600)
52Providing and laying reinforced cement concrete 1000mm dia pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry (1X1000)
53Brick masonry work in 1:3 cement mortar in substructure complete except pointing and plastering, as per drawing and technical specification MORD 602, 603, 604, 900, 1202 & 1204
54P.C.C grade M-20 (1:2:4) nominal mixProviding concrete for plain/reinforced cement concrete in substructure complete as per drawings and technical specification. MORD 802, 804, 805, 806, 807, 900, 1202 & 1204
55Name of Road:- Ghatampur Kusmanda Devi To Gucchhupur Faridpur vai Banhari,(ch.0.00-5.300km) Pkg No UP 4195
56Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. Non thorny jungle) ( By Mechanical Means)
57Construction of Embankment with approved soil with a lift upto 1.5 m laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet requirement of table 300.1 and 300.2
58Construction of Embankment with approved soil with a lift upto 1.5 m and lead 1000 mts laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet requirement of table 300.1 and 300.2
59Construction of Subgrade and Earthen Shoulder with approved soil with all lifts and leads, laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet at least 100 % procter density complete to specification requirements
60Construction of Subgrade and Earthen Shoulder with approved soil with all lifts and leads 1000 mts, laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet at least 100 % procter density complete to specification requirements
61Stabilization of in-situ (existing pavement crust) or soil or otherwise sub base/ base course up to the required depth by cold in-situ recycling using cement and chemical additives/otherwise: Providing pulverizing, spreading, milling and mixing of chemical additives at the appropriate rate as per job mix design in accordance with IRC-SP-72-2015 , IRC-37-2012 & 2018 and IRC SP 89 (part II) 2018. Cementitious additive @ minimum 5-7% and CCS/CS additive should be spread on the existing pavement using a mobile truck mounted containerized cement/ additive spreader with micro processor controlled weighing and spreading system. The additive spreader shall have variable working width sufficient to cover whole pavement lane.The in-situ stabilization process shall be carried out by a mobile and self propelled stabilizer/reclaimer of working width of 2.4 m and with minimum engine HP of 440 kw with a variable working depth up to 50 cm.The resultant stabilized mix then would be profiled to the required grade, level and thickness using motor grader and the mix would be compacted using 20 tonne pad foot roller in combination with smooth wheel roller to achieve desired proctor density as per IRC 37-2012 & 2018 and complete in all respect and curing with water as required including all materials, labour and machinery etc. The entire in-situ process would be carried out in single pass with milling and pulverising of damaged asphalt pavement/soil/aggregates/soil-aggregate mixture to the desired depth and with simultaneous addition of additives and water with machine integrated spray bars fited on the wheeled self-propelled and vibratory pad foot roller to achieve the desired proctor density in all respects.The tandem roller be followed by Pneumatic Tyre Roller. The minimum unconfined compressive strength (UCS) of stabilized sub base/ base should be 4.5 to 7 MPa after 7 / 28 days of curing as per IRC-SP-72-2015 , IRC-37-2012 & 2018 . Also durability aspects (wet-dry cycles) of stabilized sub base should be satisfied as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018.The gradation mixes and materials should be as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The equipments to be used are binder spreader- water Tanker- Additive Truck- Recycler-Padfoot Roller(20T)+Single Drum Compactor-Grader- Tandom Roller-PT Roller (20 T)
62Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavater at OMC, and compacting with smooth wheeled roller to achieve the desired density as per clause 401(GSB Grade I)
63Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 kg/sqm using mechanical means as per Technical Specification Clause 502
64Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.275 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
65Providing and laying stress,Absorbing membrane interlayer (SAMI)/bitumen impregnated geeotextile layer after clearing of the road surface geotextile conforming to physical requirements of clause 703-3,laid over a tack coat of paving grade Bitumen 80-100 penetration, laid at the rate of 1.05kg per sqm over thoroughly cleaned and repaired surface to provide a water resistant membrane and crack retarding layer Paving fabric to be free of wrinkling and folding and to be laid before cooling of tack coat, brooming and rolling of surface with pneumatic roller to maximise paving fabric contact with pavement surface as per Technical Specification Clause 708 of MoRTH
66Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
67Construction of Panel concrete plain Cement concrete pavement, Thickness as per design, over a prepared subbasewith 43 grade cement or any other type as per Clause 1501.2.2 M 30 (Grade) coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate no exceeding 25mm, mixed in a concrete mixer of not less that 0.2 cum capacity and appropriate weigh batcher uusing approved mix design , laid in approved fixed side formwork ( Steel Channel, Laying and fixing of 125 micron thiock polythene film , wedges, steel plates including levelling th formwork as per Drawing ), Spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and fininshedin continous operation including provision of contraction and expansion, construction joints , applying debonding strips, primer, sealant , near approaches to bridge/culvert and construction joints, admixture as approved, curing of concrete slabs for 14 days. curing compound ( Where specified ) and water finishing to lines and grade as per drawing and Technical specification Clause 1501. PCc Grade M-30 Each Panesl ( 0.50 X0.50 ) thickness 125mm
68Laying brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing the same with three wheel road roller 80-100 kN as per Technical Specification Clause 412
69Providing and fixing of precast RCC Level Pillars in M15 ( 1:2.5:5 ) Nominal Mix having section .15X.15 M and Length 1.5 M which will be reused as Boundry/Guard Stones on curves including painting with specified colours after completion of work) as per drawing and technical specifications
70Providing and fixing of Reference Bench Mark / Temporary Bench Mark having section .0.35X.0.35 M and height 0.30 M above ground level in B/W 1:3 as per drawing and technical specifications
71Providing and fixing of Logo sign board A and B at starting point & Intermediate distance with a corrosion resitant 3mm thick aluminum composite panel (ACP) face to be fully covered with DM 5600 engineering grade prismatic/equivalent sheeting Type I as per IRC67:2012 with post of MS structure of square hollow section MS 75X75X6 mm and MS frame of 35X35X5 mm angle
72Providing and fixing of semi reflective curvature board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineering grade as per Clause 1701.3.9 of MORD for Rural Roads and approved drawing Clause 1701.2.2. (0.27 sqm area)
73Providing and fixing of semi reflective Village Sign board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineering grade as per Clause 1701.3.9 of MORD for Rural Roads and approved drawing Clause 1701.2.2. (0.27 sqm area)
74Providing and fixing of Maintenance information sign board with a corrosion resitant 3mm thick aluminum composite panel (ACP) face to be fully covered with DM 5600 engineering grade prismatic/equivalent sheeting Type I as per IRC67:2012 with post of MS structure of square hollow section MS 75X75X6 mm and MS frame of 35X35X5 mm angle
75Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703.5th Kilometer Stone (Precast)
76Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703.Ordinary Kilometer Stone (Precast)
77Reinforced cement concrete M15 grade hectometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703.200 m Stone (Precast)
78Painting lines, dashes, arrows, etc. on roads with hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702
79Supply and Fixing of Pavement Maker (Cat Eye) Type X- ASTMD-4956-04 Avery denision /3-M (USA MAKE) consisting of ASA Plastic housing fitted with tightly adherent ploting compound. The housing shall contain prismatic to Glass covered prismatic reflecting face to reflect incident light
80Reinforced Cement Concrete M 25 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211 (Drain Cover)
81Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue/Foundation complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
82Construction of Speed Breaker in full road way width in 3.70 Km longitudinal length with 100 mm thickness in midle 1.70 m length laid over previously laid bituminous surfacing course and previously laid base course on shoulders including zebra white epoxy painting in alternate pannel of size 50 cm x 50 cm in four rows along the edges.
83Providing & laying of Rubber Moulded Interlocking Concrete Block pavements having thickness 80 mm as per drawings and techinical Specification Clause 1504 (Laid over previously prepared subbase using 100mm thick GSB, excluding cost of GSB ) Prefer Zig Zag
84Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of side
85Providing concrete for plain/reinforced concrete M10 (1:3:6) in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
86Brick masonry work in cement mortar in sub structure complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 (1:4)
87Plain/reinforced cement concrete in (1:2.5:5) substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 M-15
88Reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204. R.C.C grade M-20 (nominal mix)
89Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
90Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
91Backfilling behind abutment, wing wall and return wall using 40 mm brick ballast complete as per drawings & technical specification Clause 1204.3.8
92Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204
93Construction of Embankment with approved soil with a lift upto 1.5 m laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet requirement of table 300.1 and 300.2
94Plastering with cement mortar (1:4), 15mm thick on brickwork in substructure as per technical specification
95Painting two coats including prime coat with epoxy paint of approved brand on concrete/steel surfaces after through cleaning of surface to give an even shade as per drawing and Technical Specification Clause 1701
96Providing and fixing of precast RCC Guard Stone in M20 ( 1;2:4 ) Nominal Mix having section 0.25x0.25 M and Length 1.0 M fixed in M10 concrete of section 0.50x0.50 m in thickness 0.40 M as per drawing and technical specifications
97Fillling in foundation trenches using coarse sand/ screening as per drawing and technical specification Clause 305.3.9
98Providing and laying reinforced cement concrete 600mm dia pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry (1X600)
99Providing and laying reinforced cement concrete 1000mm dia pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry (1X1000)
100Brick masonry work in 1:3 cement mortar in substructure complete except pointing and plastering, as per drawing and technical specification MORD 602, 603, 604, 900, 1202 & 1204
101P.C.C grade M-20 (1:2:4) nominal mixProviding concrete for plain/reinforced cement concrete in substructure complete as per drawings and technical specification. MORD 802, 804, 805, 806, 807, 900, 1202 & 1204 Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56894380
AUTHORITY Government Departments
TENDER VALUE 8.28 Crore
LAST DATE 20-08-2026
Authority
Authority Name Uttar Pradesh Rural Road Development Agency
Work Description Tender for Construction And 5 Year Maintenance Works Of District- Kanpur Nagar Under flood damage repair Group Upfdr- 207Name Of Road:- Gangupur Pihani Hilalpur Kharamau To Araul Makanpur Road,(Ch.0.00-4.00Km) Pkg No Up 4193Name Of Road:- Ghat Ur Kusmanda Devi To Gucchhupur Faridpur Vai Banhari,(Ch.0.00-5.300Km) Pkg No Up 4195
Basic Detail
Tender No 1204/RED/TENDER/PMGSY-III /Kanpur Nagar/2026-27 Dt 28/07/2026
Bidding Type Tender
Location
City Sultanpur
State Uttar Pradesh
Key Dates
Publish Date 07 Aug 2026
Submission Date 20 Aug 2026
Open Date 20 Aug 2026
Finance
Tender Value 8.28 Crore
Tender Fee 6000
EMD 17 Lakhs
Exemption Not Available
Document List
BOQ_234283.xls
ecbd804b-4d56-4620-a0fc-4d909f5b9b49.html
FDR207_SBD.pdf
Tendernotice_1 (6).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 07, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 20, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 10 days
Aug 20, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 10 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_234283.xls

html

ecbd804b-4d56-4620-a0fc-4d909f5b9b49.html

pdf

FDR207_SBD.pdf

pdf

Tendernotice_1 (6).pdf