Tender For General-Kip(Rb) Rectification Work -Of Karunagappally Branch Canal Wells (6 No:S) From Ch. 5240 M To Ch. 5510 M In Vallikunnam Panchayath In Mavelikkara Taluk-General Civil Work
Tender Value
8.47 Lakhs
Estimated cost
Bid Submission
19 Aug 2026
9 days left
EMD
21183
Bank guarantee accepted
Document Fee
1870
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kollam → Kerala
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for General-Kip(Rb) Rectification Work -Of Karunagappally Branch Canal Wells (6 No:S) From Ch. 5240 M To Ch. 5510 M In Vallikunnam Panchayath In Mavelikkara Taluk-General Civil Work
BOQ
| Sl. No. | Item Description |
| 1 | Rectification of Karunagappally branch Canal Wells |
| 2 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared |
| 3 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. |
| 4 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil |
| 5 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . |
| 6 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining |
| 7 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 8 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 9 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |
| 10 | Rectification of syphon pipe between wells |
| 11 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared |
| 12 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil |
| 13 | OD19051/2026-2027:Engaging coolie for sealing pipe joints |
| 14 | 22.25.1:Providing and applying crystalline mortar by mixing in the ratio of 4.5 : 1 (4.5 partscrystalline mortar : 1 part water) for the treatment of faulty construction joints, cracks,tie rod holes and spalled & honeycombed surface of RCC underground structureslike basement, water tanks, bridge deck etc. to ensure water tightness. The crystalliemortar shall conform to the EN 1504-3 having compressive strength Class R4 (?45MPa) and adhesive bond strength Class R3 (?1.5 MPa). The work shall be carried outall complete as per specification and the direction of the engineer-in-charge. Theproduct performance shall carry guarantee for 10 years against any leakage.For sealing cracks and faulty construction joints, routed out/making U-shape groove size 25x25mm and then primed the area with integral crystalline slurry @0.05kg/running meter and while the surface is tacky filled the groove upto surface with crystalline mortar @1.50kg/running meter. Once crystalline mortar is touch dry then finally applied two coats of integral crystalline slurry @0.05kg/running meter per coat. |
| 15 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 16 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform |
| 17 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3graded stone aggregate 20 mm nominal size derived from natural sources) |
| 18 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 19 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 20 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Aug 07, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 19, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysAug 20, 2026
Bid Opening Date
Technical bids will be opened and evaluated.