Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard Ins Teg, Naval Dockyard, Mumbai; Installation, Integration And Commissioning Of Refrigeration Plant Onboard Ins Teg; Service Provider - Shif
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard Ins Teg, Naval Dockyard, Mumbai; Installation, Integration And Commissioning Of Refrigeration Plant Onboard Ins Teg; Service Provider - Shifting Of The Refrigeration Plant Along With The Control Panel And Product Cooler To The Designated Ship Compartment , Installation Of Product Coolers In Their Respective Rooms , Connection Of Refrigerant Piping To The Product Coolers. (Refrigerant Piping Supply By Jc) , Installation Of The Control Panel On Its Designated Structure , Termination Of All Cabling Related To Instrumentation , Pressure Testing Of The Refrigeration Plant Using Nitrogen (Nշ) , Vacuum Testing Of The System , Charging Of Oil And Refrigerant (1St Charge Jc Scope) , Commissioning (Kick-Start) And Successful Trail Run (Stw) Of The Refrigeration Plant
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Shifting of the refrigeration plant along with the control panel and product cooler to the designated ship compartment | Shifting of the refrigeration plant along with the control panel and product cooler to the designated ship compartment |
| 2 | Installation of product coolers in their respective rooms | Installation of product coolers in their respective rooms |
| 3 | Connection of refrigerant piping to the product coolers. (Refrigerant piping supply by JC) | Connection of refrigerant piping to the product coolers. (Refrigerant piping supply by JC) |
| 4 | Installation of the control panel on its designated structure | Installation of the control panel on its designated structure |
| 5 | Termination of all cabling related to instrumentation | Termination of all cabling related to instrumentation |
| 6 | Pressure testing of the refrigeration plant using nitrogen (Nշ) | Pressure testing of the refrigeration plant using nitrogen (Nշ) |
| 7 | Vacuum testing of the system | Vacuum testing of the system |
| 8 | Charging of oil and refrigerant (1st charge JC scope) | Charging of oil and refrigerant (1st charge JC scope) |
| 9 | Commissioning (kick-start) and successful trail run (STW) of the refrigeration plant | Commissioning (kick-start) and successful trail run (STW) of the refrigeration plant |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 7 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender