Public Administrative Department Local Bodies Closing in 9 days TDR #56888334

Tender For Construction Of Girls Hostel Building Under Kgbv Type-Iii , Mandosil, Paikmal Block

Issued by Local Bodies · Bargarh, Odisha
Tender Value
85.26 Lakhs
Estimated cost
Bid Submission
20 Aug 2026
9 days left
EMD
85262
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Bargarh → Odisha
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Construction Of Girls Hostel Building Under Kgbv Type-Iii , Mandosil, Paikmal Block

BOQ

Name of Work:- Construction of Girls Hostel Building under KGBV Type-III , Mandosil, Paikmal Block
Sl. No. Item Description
1E/W excavation of foundation in hard soil within initial lead of 50.0m and initial lift of 1.50m including rough dressing and levelling the bed of foundation etc all complete.
2Filling of foundation and plinth with sand well watered and rammed including all cost.
3Cement Concrete (1:3:6) using 4 cm size hbhg metal including all cost.
4R.C.C. work in M-20 grade concrete using 20 mm and down graded size cbhg chips including all cost.(RCC COLUMN BASE,FOOTING,FOUNDATION
5Plinth Band Ground Floor
6RCC Column and Beam Ground Floor
7RCC Column and Beam First Floor
8RCC Lintel Ground Floor
9RCC Lintel First Floor
10Chhajja
11First Floor Window
12Ground Floor Roof Slab
13First Floor Roof Slab
14Fly ash Brick work in C.M.(1:6) for F&P including all cost. 1st Footing
15Fly ash Brick work in C.M.(1:6) for super structure including all cost. Ground floor
16Fly ash Brick work in C.M.(1:6) for super structure including all cost. First Floor
1716mm thick C.P. in CM(1:6) over the brick masonary including all cost.(Interior surface) Ground Floor
1816mm thick C.P. in CM(1:6) over the brick masonary including all cost.(Interior surface) First Floor
1912mm thick C.P. in CM(1:6) over the brick masonary including all cost.(Exterior surface) Ground Floor
2012mm thick C.P. in CM(1:6) over the brick masonary including all cost.(Exterior surface) First Floor
2120mm thick Grading C.P with C:M (1:4) over roof slab including all cost complete First Floor
22Supplying Fixing Vetrified tiles (600mmx600mm) with C:M (1:1) mixed With polishing ,Rubbing all cost complete Kitchen
23Supplying Fixing Vetrified tiles (600mmx600mm) with C:M (1:1) mixed With polishing ,Rubbing all cost complete First Floor
24Fixing tiles in dados skirting and risers of steps on12mm thick cement plaster (1:3) joined with neat cement slurry mixed with pigments to match the shades of the tilesGround Floor
25Fixing tiles in dados skirting and risers of steps on12mm thick cement plaster (1:3) joined with neat cement slurry mixed with pigments to match the shades of the tilesFirst Floor
26upplying and Fixing 300mm x300mm ceramic tiles with 25mm thick bed with C:M (1:1) with all cost complete Ground Floor
27upplying and Fixing 300mm x300mm ceramic tiles with 25mm thick bed with C:M (1:1) with all cost complete First Floor
28Supplying & Fixing Tiles 300mmx300mm in dados with 12mm thick C.P with C:M (1:6) with all cost Ground Floor
29Supplying & Fixing Tiles 300mmx300mm in dados with 12mm thick C.P with C:M (1:6) with all cost First Floor
3020mm thick Cealing plaster with C:M (1:4) Room Ceiling Ground Floor
3120mm thick Cealing plaster with C:M (1:4) Room Ceiling First Floor
32Supplying ,Fitting and placing HYSD bar rainforcement with all cost complete Ground Floor
33Supplying ,Fitting and placing HYSD bar rainforcement with all cost complete First Floor
34Labour cost for fitting and fixing cost of MS Door, Window, Grill with all cost complete Ground FloorDoor
35Labour cost for fitting and fixing cost of MS Door, Window, Grill with all cost complete Ground Floor3.5 Kg/Sqft
36Labour cost for fitting and fixing cost of MS Door, Window, Grill with all cost complete Ground Floor3.Window
37Labour cost for fitting and fixing cost of MS Door, Window, Grill with all cost complete Ground Floor4 Kg/Sqft
38Labour cost for fitting and fixing cost of MS Door, Window, Grill with all cost complete Ground FloorVent
39Labour cost for fitting and fixing cost of MS Door, Window, Grill with all cost complete Ground Floor15.00 Kg/Sqm
40Labour cost for fitting and fixing cost of MS Door, Window, Grill with all cost complete First FloorDoor
41Labour cost for fitting and fixing cost of MS Door, Window, Grill with all cost complete First Floor3.5 Kg/Sqft
42Labour cost for fitting and fixing cost of MS Door, Window, Grill with all cost complete First FloorWindow
43Labour cost for fitting and fixing cost of MS Door, Window, Grill with all cost complete First Floor4.00 Kg/Sqft
44Labour cost for fitting and fixing cost of MS Door, Window, Grill with all cost complete First FloorVent
45Labour cost for fitting and fixing cost of MS Door, Window, Grill with all cost complete First Floor15.00 Kg / Sqm
46Painting two coat with approved paint on Iron / Wood Work Ground Floor
47Painting two coat with approved paint on Iron / Wood Work First Floor
48Finishing wall surface with Acrylic wall putty of approved make and finished smooth and even surface to received painting including cost of scaffholding staging charges with cost of all materials taxes Ground Floor
49Finishing wall surface with Acrylic wall putty of approved make and finished smooth and even surface to received painting including cost of scaffholding staging charges with cost of all materials taxes First Floor
50Priming 1 coat with any approved primer on wall Ground Floor
51Priming 1 coat with any approved primer on wall First Floor
52Finishing of wall with plastic emulsion paint of approved shade on new workGround Floor
53Finishing of wall with plastic emulsion paint of approved shade on new workFirst Floor
54Wall painting 2 coat with weather coat paint of approved shed of new work inc all costGround Floor
55Wall painting 2 coat with weather coat paint of approved shed of new work inc all costFirst Floor
56Cost of Display Board
57Provision for Railing of Stair, unforeseen items
58Provision for electrical fittings
59Provision for water supply and sanitary Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56888334
AUTHORITY Local Bodies
TENDER VALUE 85.26 Lakhs
LAST DATE 20-08-2026
Authority
Authority Name Zilla Parishad
Work Description Tender for Construction Of Girls Hostel Building Under Kgbv Type-Iii , Mandosil, Paikmal Block
Basic Detail
Tender No PKL-BLK-03/2026-27
Bidding Type Tender
Location
City Bargarh
State Odisha
Key Dates
Publish Date 07 Aug 2026
Submission Date 20 Aug 2026
Open Date 21 Aug 2026
Finance
Tender Value 85.26 Lakhs
Tender Fee 10000
EMD 85262
Exemption Available
Document List
BOQ_605029.xls
DTCN.pdf
f03d52e5-7731-44ce-8152-d5136fe537d6.html
Tendernotice_1 (11).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 07, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 20, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 9 days
Aug 21, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 10 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_605029.xls

pdf

DTCN.pdf

html

f03d52e5-7731-44ce-8152-d5136fe537d6.html

pdf

Tendernotice_1 (11).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders