Tender For annual maintenance contract Of Ac Machines (Window Ac, Split Ac, Etc.) With Similar Equipments At Esi Hospital Manicktala & Esi Hospital Budge Budge
Tender Overview
Project Description
Tender for annual maintenance contract Of Ac Machines (Window Ac, Split Ac, Etc.) With Similar Equipments At Esi Hospital Manicktala & Esi Hospital Budge Budge , Dismantling And Re-Installation Of A.C. Machine:- , (I) Split A.C. , (Ii) Window A.C. , Providing New Copper Pipe Line (High Side & Low Side) With Insulation, Electrical Cable And Pvc Water Drain Out Line Including Fitting & Fixing Complete For Split A.C. Unit , Complete Overhauling Of The A.C. Unit By Chemical Solution Including Cleaning Of Cooling Coil, Condenser Coil, Housing, Runner, Fan, Etc. Oiling Of Motors, Checking And Rectification Of Electrical Connection/Contact. , Replacement Of Condenser Fan-Motor Of Split Ac/Window Ac/ Mortuary Cooler. , Complete Gas Charging Of The A.C. Unit After Cutting And Welding Of Copper Refrigerant Pipe Line With Flushing And Leak Testing By Nitrogen Gas Of The Entire Refrigeration System And Finally Vaccumizing Of The System. , Complete Repairing, Testing And Fitting Of Display Pcb Circuit Board Split Ac/ Window Ac. , Replacement Of Display Pcb Circuit Board. , Replacement Of Remote Of Split Ac/Window Ac , Replacement Of Metal (Aluminium) Capacitor):- , (I) 4 Mfd , (Ii) 6 Mfd , (Iii) 36 Mfd , (Iv) 45 Mfd , (V) 50 Mfd , Replacement Of Compressor (Rotary/Schroll) :- , (I) 1.0 Tr Rotary , (Ii) 1.5 Tr Rotary , (Iii) 2.0 Tr Rotary , (Iv) 5.5 Tr Scroll , Replacement Of Compressor (Inverter) :- , (I) 1.0 Tr Rotary , (Ii) 1.5 Tr Rotary , (Iii) 2.0 Tr Rotary , Repairing Of Reciprocating Compressor : , (I) 1.0 Tr Rotary , (Ii) 1.5 Tr Rotary , (Iii) 2.0 Tr Rotary , Replacement Of Blower Of Split Ac/Window Ac , Replacement Of Reciprocating Compressor : , (I) 1.0 Tr Rotary , (Ii) 1.5 Tr Rotary , (Iii) 2.0 Tr Rotary , Replacement Of Base Rubber Bush Set Of Compressor , Replacement Of Terminal Of Compressor , Replacement Of Condensor Housing Window Ac , Replacement Of Condensor Fan Split Ac/Window Ac/Mortuary Cooler , Replacement Of Blower Housing Of Window Ac , Replacement Of Grill Of Idu Of Split Ac , Replacement Of Condensor Housing Split Ac , Replacement Of Base Plate Of Window Ac , Replacement Of Copper U Bend Of Condensor Coil , Replacement Of Copper U Bend Of Cooling Coil , Replacement Of Condensor Fan , Replacement Of Blower Split Ac , Replacement Of Blower Window Ac , Repairing Of Condensor Fan-Motor , Repairing Of Blower-Motor , Repairing Of Display Board , Replacement Of Condensor/Blower- Motor Shaft , Replacement Of Condensor/Blower- Motor Bush/Bearing , Replacement Of Swing Motor , Replacement Of Angle Valve , Replacement Of Blower Motor Split Ac/Mortuary Cooler , Replacement Of Condensor Fan -Motor Of Split Ac / Window Ac/Mortuary Cooler , Replacement Of Copper Capllary Tube And Strainer , Replacement Of Metal Bracket For Odu Of Split Ac , Replacement Of Of Wooden Frame For Window Ac , Replacement Of Air Filter Of Split Ac/Window Ac , Necessary Electrical Spare Parts Changing With Thorough Checking And Rectification Of Electrical Circuit. , Replacement Of Condensor Coil Of Split Ac/Window Ac , Complete Gas Charging Of Inverter A.C. Unit After Cutting And Welding Of Copper Refrigerant Pipe Line With Flushing And Leak Testing By Nitrogen Gas Of The Entire Refrigeration System And Finally Vaccumizing Of The System. , Complete Repairing, Testing And Fitting Of Pcb Circuit Board Of Inverter Ac. , Replacement Of Display Pcb Circuit Board Of Inverter Ac , Complete Overhauling Of Mortuary Cooler By Chemical Solution Including Cleaning Of Cooling Coil, Condensor Coil, Housing, Runner, Fan Etc. Oiling Of Motors, Checking And Rectification Of Electrical Connection/Contact , Complete Gas Charging Of The Mortuary Cooler After Cutting And Welding Of Copper Refrigerant Pipe Line With Flushing And Leak Testing By Nitrogen Gas Of The Entire Refrigeration System And Finally Vaccumizing Of The System. , Replacement Of Compressor Of Mortuary Cooler , Complete Repairing Of Compressor Including Necessary Replacement Of Spare Parts And Fresh Oil Charging Of Cooling Unit For Blood Bank , Complete Gas Charging Of The System After Pressure Testing, Leak Testing And Vaccumizing Of The Entire Refrigerartion System Cooling Unit, Blood Bank , Replacement Of Expansion Valve (As Above) , Replacement Of Shaft Seal Assembly (As Above) , Replacement Of Fly Wheel Of Compressor (As Above) , Replacement Of V Belts Of Compressor- Motor (As Above) , Rewinding Of Compressor - Motor Including Replacement Of Bearing (As Above) , Rewinding Of Condensor/Blower Motor Including Replacement Of Bearing (As Above) , Replacement Of Condensor/Blower Motor (As Above) , Replacement Of Drier (As Above) , Replacement Of Heat Exchanger(As Above) , Replacement Of Service Valve Of Compressor , Replacement Of Metal Base Frame Of Compressor-Motor Assembly With Allied Accessories(As Above) , Replacement Of Condensor Housing With All Fittings(As Above) , Replacement Of Shaft Seal Flange Set (As Above) , Replacement Of Shaft (As Above) , Replacement Of Piston Set(As Above) , Replacement Of Valve Plate Set , Replacement Ofelectrical Control Set (As Above) , Complete Heating-Varnishing Of Compressor-Motor After Complete Dismantling Including Necessary Replacement Of Bearings And Greasing Finally Re-Assembling And Testing (As Above) , Digital Ammeter , Replacement Of Mechanical Air Filter , Replacement Of Actuator , Complete Dismantling Including Scrapping The Old Worn - Out Insulation From The Chill Water Pipe Lines And Removing It From The Site With Thorough Cleaning. Finally Smoothening Of The Surface Of The Pipe Lines , Complete Fitting, Fixing And Pasting Of Tf Quality Circular Block Thermocole By Cold Bitumen Paste On The Chill Water Pipe Lines/Nitrile Rubber Insulation By Adhesive, By Cutting Bending The Same As Per Position. Filling The Joints By The Bitumen Paste/Insulation Tape. , Complete Air Proof Covering Of Finished Thermocole Insulation With Pvc Polythene Clothes By Hooking, Clamping, Etc. , Finally, Covering Of The Surface By Aluminium Cladding/Plastering With Sand And Cement Mixture After Applying Chicken Wire Mesh. , Ducting Work By 24 Gz G.I. Sheet, Including Fabrication And Installation By G.I. Rod, M.S. Angle, G.I. Nut - Bolt, Etc. Including Allied Items. , Ducting Work By 22 Gz G.I. Sheet, Including Fabrication And Installation By G.I. Rod, M.S. Angle, G.I. Nut - Bolt, Etc. Including Allied Items. , Complete Insulation Of Ducting By 13 Mm Fire Retardant Nitrile Rubber Insulating Material With Allied Items. , Supply, Fitting And Balancing Of Powder Coated Supply Air-Grille. , Supply, Fitting And Balancing Of Powder Coated Return Air-Grille. , Supply, Fitting And Balancing Of Diffuser With Vcd , Supply, Fitting And Balancing Of Diffuser Without Vcd , Supply, Fitting And Balancing Of Vcd , Supply, Fitting And Balancing Of Fire Damper , Complete Gas Charging Of The 5.5 Tr A.C. Unit After Cutting And Welding Of Copper Refrigerant Pipe Line With Flushing And Leak Testing By Nitrogen Gas Of The Entire Refrigeration System And Finally Vaccumizing Of The System , Complete Overhauling Of 5.5 Tr A.C. Unit By Chemical Solution Including Cleaning Of Cooling Coil, Conderser Coil, Housing, Runner, Fan Etc. Oiling Of Motors, Checking And Rectification Of Electrical Connection/Contact. , Supply And Fitting Of Drier (As Above) , Electrical Cabling In Between Indoor And Outdoor Units (As Above) , Replacement Of Electrical Control Set(As Above) , Thorough Flushing-Out Of Water And Moisture From The Condensing Units And Cooling Unit By Nitrogen Gas Pressure And Heating Process, After Making The Necessary Arrangement For This Procedure Of Work. (As Above) , Inter Connected Copper Refrigerant Pipe Between Outdoor Unit And Indoor Unit With Insulation , Clamping Etc. (Both Suction And Discharge Refrigerent Pipes) (As Above) , Supply Of Split A.C. Unit , (I) 1.5 Tr , (Ii) 2.0 Tr , Installation Charges Of New Split A.C. Unit , Monthly Preventive Maintenance Charge For All A.C. Units, Etc., Including Unlimited Breakdown Call Attending. , Any Other Items Not Listed Above (The Value Will Be Treated As Percentage Only For This Row) , If Applicable Manpower For Operation On Round The Clock Wise, 365 Days Basic One Manpower Per Shift (1X3+1) As Per Current Wblc Rate.(Contractor Will Quote Service Charge Only In Percentage Above Or Below) (Service Charge Must Be As Per Govt Norms)If Applicable
BOQ
| Sl. No. | Item Description |
| 1 | Dismantling and re-installation of A.C. Machine:- |
| 2 | (i) Split A.C. |
| 3 | (ii) Window A.C. |
| 4 | Providing new copper pipe line (high side & low side) with insulation, electrical cable and PVC water drain out line including fitting & fixing complete for split A.C. unit |
| 5 | Complete Overhauling of the A.C. unit by chemical solution including cleaning of cooling coil, condenser coil, housing, runner, fan, etc. Oiling of motors, checking and rectification of electrical connection/contact. |
| 6 | Replacement of condenser fan-motor of Split AC/Window AC/Mortuary Cooler. |
| 7 | Complete Gas Charging of the A.C. unit after cutting and welding of copper refrigerant pipe line with flushing and leak testing by nitrogen gas of the entire refrigeration system and finally vaccumizing of the system. |
| 8 | Complete repairing, testing and fitting of display PCB Circuit board SplitAC/ Window AC. |
| 9 | Replacement of display PCB circuit board. |
| 10 | Replacement of Remote of Split AC/Window AC |
| 11 | Replacement of Metal (aluminium) Capacitor):- |
| 12 | (i) 4 MFD |
| 13 | (ii) 6 MFD |
| 14 | (iii) 36 MFD |
| 15 | (iv) 45 MFD |
| 16 | (v) 50 MFD |
| 17 | Replacement of Compressor (Rotary/Schroll) :- |
| 18 | (i) 1.0 TR Rotary |
| 19 | (ii) 1.5 TR Rotary |
| 20 | (iii) 2.0 TR Rotary |
| 21 | (iv) 5.5 TR Scroll |
| 22 | Replacement of Compressor (inverter) :- |
| 23 | (i) 1.0 TR Rotary |
| 24 | (ii) 1.5 TR Rotary |
| 25 | (iii) 2.0 TR Rotary |
| 26 | Repairing of Reciprocating Compressor : |
| 27 | (i) 1.0 TR Rotary |
| 28 | (ii) 1.5 TR Rotary |
| 29 | (iii) 2.0 TR Rotary |
| 30 | Replacement of Blower of Split AC/Window AC |
| 31 | Replacement of Reciprocating Compressor : |
| 32 | (i) 1.0 TR Rotary |
| 33 | (ii) 1.5 TR Rotary |
| 34 | (iii) 2.0 TR Rotary |
| 35 | Replacement of base rubber bush set of compressor |
| 36 | Replacement of terminal of compressor |
| 37 | Replacement of Condensor housing Window AC |
| 38 | Replacement of Condensor fan Split AC/Window AC/Mortuary Cooler |
| 39 | Replacement of blower housing of Window AC |
| 40 | Replacement of grill of IDU of Split AC |
| 41 | Replacement of Condensor housing Split AC |
| 42 | Replacement of base plate of Window AC |
| 43 | Replacement of copper U bend of condensor coil |
| 44 | Replacement of copper U bend of cooling coil |
| 45 | Replacement of Condensor fan |
| 46 | Replacement of blower Split AC |
| 47 | Replacement of blower Window AC |
| 48 | Repairing of condensor fan-motor |
| 49 | Repairing of blower-motor |
| 50 | Repairing of display board |
| 51 | Replacement of condensor/blower- motor shaft |
| 52 | Replacement of condensor/blower- motor bush/bearing |
| 53 | Replacement of swing motor |
| 54 | Replacement of angle valve |
| 55 | Replacement of Blower Motor Split AC/Mortuary Cooler |
| 56 | Replacement of Condensor fan -motor of Split AC / WindowAC/Mortuary Cooler |
| 57 | Replacement of Copper capllary tube and Strainer |
| 58 | Replacement of metal bracket for ODU of Split AC |
| 59 | Replacement of of wooden frame for Window AC |
| 60 | Replacement of Air filter of Split AC/Window AC |
| 61 | Necessary electrical spare parts changing with thorough checking andrectification of electrical circuit. |
| 62 | Replacement of Condensor Coil of Split AC/Window AC |
| 63 | Complete Gas Charging of Inverter A.C. unit after cutting and welding of copper refrigerant pipe line with flushing and leak testing by nitrogen gas of the entire refrigeration system and finally vaccumizingof the system. |
| 64 | Complete repairing, testing and fitting of PCB Circuit board of InverterAC. |
| 65 | Replacement of display PCB circuit board of Inverter AC |
| 66 | Complete overhauling of Mortuary Cooler by chemical solution including cleaning of cooling coil, condensor coil, housing, runner, fan etc. Oiling of motors, checking and rectification of electricalconnection/contact |
| 67 | Complete Gas Charging of the Mortuary Cooler after cutting and welding of copper refrigerant pipe line with flushing and leak testing by nitrogen gas of the entire refrigeration system and finallyvaccumizing of the system. |
| 68 | Replacement of Compressor of Mortuary Cooler |
| 69 | Complete repairing of Compressor including necessary replacement of spare parts and fresh oil charging of Cooling unit for Blood Bank |
| 70 | Complete gas charging of the system after pressure testing, leaktesting and vaccumizing of the entire refrigerartion system cooling unit, Blood Bank |
| 71 | Replacement of Expansion Valve (as above) |
| 72 | Replacement of shaft seal Assembly (as above) |
| 73 | Replacement of Fly wheel of compressor (as above) |
| 74 | Replacement of V Belts of Compressor- Motor (as above) |
| 75 | Rewinding of Compressor - Motor including replacement of bearing (asabove) |
| 76 | Rewinding of Condensor/Blower Motor including replacement ofbearing (as above) |
| 77 | Replacement of Condensor/Blower Motor (as above) |
| 78 | Replacement of Drier (as above) |
| 79 | Replacement of Heat Exchanger(as above) |
| 80 | Replacement of service valve of compressor |
| 81 | Replacement of metal base frame of compressor-motor assembly withallied accessories(as above) |
| 82 | Replacement of condensor housing with all fittings(as above) |
| 83 | Replacement of shaft seal flange set (as above) |
| 84 | Replacement of shaft (as above) |
| 85 | Replacement of piston set(as above) |
| 86 | Replacement of valve plate set |
| 87 | Replacement ofElectrical Control set (as above) |
| 88 | Complete heating-varnishing of compressor-motor after complete dismantling including necessary replacement of bearings and greasing finally re-assembling and testing (as above) |
| 89 | Digital Ammeter |
| 90 | Replacement of Mechanical Air filter |
| 91 | Replacement of Actuator |
| 92 | Complete dismantling including scrapping the old worn - out insulation from the chill water pipe lines and removing it from the site with thorough cleaning. Finally smoothening of the surface of the pipe lines |
| 93 | Complete fitting, fixing and pasting of TF quality circular block thermocole by cold bitumen paste on the chill water pipe lines/nitrile rubber insulation by adhesive, by cutting bending the same as per position. Filling the joints by the bitumen paste/insulation tape. |
| 94 | Complete air proof covering of finished thermocole insulation withPVC polythene clothes by hooking, clamping, etc. |
| 95 | Finally, covering of the surface by aluminium cladding/plastering withsand and cement mixture after applying chicken wire mesh. |
| 96 | Ducting work by 24 Gz G.I. Sheet, including fabrication and installation by G.I. rod, M.S. angle, G.I. nut - bolt, etc. including allied items. |
| 97 | Ducting work by 22 Gz G.I. Sheet, including fabrication and installation by G.I. rod, M.S. angle, G.I. nut - bolt, etc. including allied items. |
| 98 | Complete insulation of ducting by 13 mm fire retardant nitrile rubberinsulating material with allied items. |
| 99 | Supply, fitting and balancing of powder coated Supply air-grille. |
| 100 | Supply, fitting and balancing of powder coated Return air-grille. |
| 101 | Supply, fitting and balancing of Diffuser with VCD |
| 102 | Supply, fitting and balancing of Diffuser without VCD |
| 103 | Supply, fitting and balancing of VCD |
| 104 | Supply, fitting and balancing of Fire Damper |
| 105 | Complete Gas Charging of the 5.5 TR A.C. unit after cutting and welding of copper refrigerant pipe line with flushing and leak testing by nitrogen gas of the entire refrigeration system and finallyvaccumizing of the system |
| 106 | Complete overhauling of 5.5 TR A.C. unit by chemical solution including cleaning of cooling coil, conderser coil, housing, runner, fan etc. Oiling of motors, checking and rectification of electricalconnection/contact. |
| 107 | Supply and fitting of Drier (as above) |
| 108 | Electrical cabling in between indoor and outdoor units (as above) |
| 109 | Replacement of Electrical Control set(as above) |
| 110 | Thorough flushing-out of water and moisture from the condensing units and cooling unit by nitrogen gas pressure and heating process, after making the necessary arrangement for this procedure of work.(as above) |
| 111 | Inter connected copper refrigerant pipe between outdoor unit andindoor unit with insulation , clamping etc. (both suction and discharge refrigerent pipes) (as above) |
| 112 | Supply of Split A.C. Unit |
| 113 | (i) 1.5 TR |
| 114 | (ii) 2.0 TR |
| 115 | Installation charges of new Split A.C. Unit |
| 116 | Monthly Preventive Maintenance charge for all A.C. units, etc.,including unlimited breakdown call attending. |
| 117 | ANY OTHER ITEMS NOT LISTED ABOVE(The value will be treated as Percentage only for this row) |
| 118 | if applicableManpower for operation on round the clock wise, 365 days basic one manpower per shift (1x3+1) as per current WBLC rate.(Contractor will quote service charge only in percentage above or below) (Service charge must be as per Govt Norms)if applicable Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 18 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 20 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender