Public Administrative Department Government Departments Closing in 18 days TDR #56886838

Tender For annual maintenance contract Of Ac Machines (Window Ac, Split Ac, Etc.) With Similar Equipments At Esi Hospital Manicktala & Esi Hospital Budge Budge

Issued by Government Departments · Kolkata, West Bengal
Tender Value
Ref. Documents
Estimated cost
Bid Submission
27 Aug 2026
18 days left
EMD
1 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Kolkata → West Bengal
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for annual maintenance contract Of Ac Machines (Window Ac, Split Ac, Etc.) With Similar Equipments At Esi Hospital Manicktala & Esi Hospital Budge Budge , Dismantling And Re-Installation Of A.C. Machine:- , (I) Split A.C. , (Ii) Window A.C. , Providing New Copper Pipe Line (High Side & Low Side) With Insulation, Electrical Cable And Pvc Water Drain Out Line Including Fitting & Fixing Complete For Split A.C. Unit , Complete Overhauling Of The A.C. Unit By Chemical Solution Including Cleaning Of Cooling Coil, Condenser Coil, Housing, Runner, Fan, Etc. Oiling Of Motors, Checking And Rectification Of Electrical Connection/Contact. , Replacement Of Condenser Fan-Motor Of Split Ac/Window Ac/ Mortuary Cooler. , Complete Gas Charging Of The A.C. Unit After Cutting And Welding Of Copper Refrigerant Pipe Line With Flushing And Leak Testing By Nitrogen Gas Of The Entire Refrigeration System And Finally Vaccumizing Of The System. , Complete Repairing, Testing And Fitting Of Display Pcb Circuit Board Split Ac/ Window Ac. , Replacement Of Display Pcb Circuit Board. , Replacement Of Remote Of Split Ac/Window Ac , Replacement Of Metal (Aluminium) Capacitor):- , (I) 4 Mfd , (Ii) 6 Mfd , (Iii) 36 Mfd , (Iv) 45 Mfd , (V) 50 Mfd , Replacement Of Compressor (Rotary/Schroll) :- , (I) 1.0 Tr Rotary , (Ii) 1.5 Tr Rotary , (Iii) 2.0 Tr Rotary , (Iv) 5.5 Tr Scroll , Replacement Of Compressor (Inverter) :- , (I) 1.0 Tr Rotary , (Ii) 1.5 Tr Rotary , (Iii) 2.0 Tr Rotary , Repairing Of Reciprocating Compressor : , (I) 1.0 Tr Rotary , (Ii) 1.5 Tr Rotary , (Iii) 2.0 Tr Rotary , Replacement Of Blower Of Split Ac/Window Ac , Replacement Of Reciprocating Compressor : , (I) 1.0 Tr Rotary , (Ii) 1.5 Tr Rotary , (Iii) 2.0 Tr Rotary , Replacement Of Base Rubber Bush Set Of Compressor , Replacement Of Terminal Of Compressor , Replacement Of Condensor Housing Window Ac , Replacement Of Condensor Fan Split Ac/Window Ac/Mortuary Cooler , Replacement Of Blower Housing Of Window Ac , Replacement Of Grill Of Idu Of Split Ac , Replacement Of Condensor Housing Split Ac , Replacement Of Base Plate Of Window Ac , Replacement Of Copper U Bend Of Condensor Coil , Replacement Of Copper U Bend Of Cooling Coil , Replacement Of Condensor Fan , Replacement Of Blower Split Ac , Replacement Of Blower Window Ac , Repairing Of Condensor Fan-Motor , Repairing Of Blower-Motor , Repairing Of Display Board , Replacement Of Condensor/Blower- Motor Shaft , Replacement Of Condensor/Blower- Motor Bush/Bearing , Replacement Of Swing Motor , Replacement Of Angle Valve , Replacement Of Blower Motor Split Ac/Mortuary Cooler , Replacement Of Condensor Fan -Motor Of Split Ac / Window Ac/Mortuary Cooler , Replacement Of Copper Capllary Tube And Strainer , Replacement Of Metal Bracket For Odu Of Split Ac , Replacement Of Of Wooden Frame For Window Ac , Replacement Of Air Filter Of Split Ac/Window Ac , Necessary Electrical Spare Parts Changing With Thorough Checking And Rectification Of Electrical Circuit. , Replacement Of Condensor Coil Of Split Ac/Window Ac , Complete Gas Charging Of Inverter A.C. Unit After Cutting And Welding Of Copper Refrigerant Pipe Line With Flushing And Leak Testing By Nitrogen Gas Of The Entire Refrigeration System And Finally Vaccumizing Of The System. , Complete Repairing, Testing And Fitting Of Pcb Circuit Board Of Inverter Ac. , Replacement Of Display Pcb Circuit Board Of Inverter Ac , Complete Overhauling Of Mortuary Cooler By Chemical Solution Including Cleaning Of Cooling Coil, Condensor Coil, Housing, Runner, Fan Etc. Oiling Of Motors, Checking And Rectification Of Electrical Connection/Contact , Complete Gas Charging Of The Mortuary Cooler After Cutting And Welding Of Copper Refrigerant Pipe Line With Flushing And Leak Testing By Nitrogen Gas Of The Entire Refrigeration System And Finally Vaccumizing Of The System. , Replacement Of Compressor Of Mortuary Cooler , Complete Repairing Of Compressor Including Necessary Replacement Of Spare Parts And Fresh Oil Charging Of Cooling Unit For Blood Bank , Complete Gas Charging Of The System After Pressure Testing, Leak Testing And Vaccumizing Of The Entire Refrigerartion System Cooling Unit, Blood Bank , Replacement Of Expansion Valve (As Above) , Replacement Of Shaft Seal Assembly (As Above) , Replacement Of Fly Wheel Of Compressor (As Above) , Replacement Of V Belts Of Compressor- Motor (As Above) , Rewinding Of Compressor - Motor Including Replacement Of Bearing (As Above) , Rewinding Of Condensor/Blower Motor Including Replacement Of Bearing (As Above) , Replacement Of Condensor/Blower Motor (As Above) , Replacement Of Drier (As Above) , Replacement Of Heat Exchanger(As Above) , Replacement Of Service Valve Of Compressor , Replacement Of Metal Base Frame Of Compressor-Motor Assembly With Allied Accessories(As Above) , Replacement Of Condensor Housing With All Fittings(As Above) , Replacement Of Shaft Seal Flange Set (As Above) , Replacement Of Shaft (As Above) , Replacement Of Piston Set(As Above) , Replacement Of Valve Plate Set , Replacement Ofelectrical Control Set (As Above) , Complete Heating-Varnishing Of Compressor-Motor After Complete Dismantling Including Necessary Replacement Of Bearings And Greasing Finally Re-Assembling And Testing (As Above) , Digital Ammeter , Replacement Of Mechanical Air Filter , Replacement Of Actuator , Complete Dismantling Including Scrapping The Old Worn - Out Insulation From The Chill Water Pipe Lines And Removing It From The Site With Thorough Cleaning. Finally Smoothening Of The Surface Of The Pipe Lines , Complete Fitting, Fixing And Pasting Of Tf Quality Circular Block Thermocole By Cold Bitumen Paste On The Chill Water Pipe Lines/Nitrile Rubber Insulation By Adhesive, By Cutting Bending The Same As Per Position. Filling The Joints By The Bitumen Paste/Insulation Tape. , Complete Air Proof Covering Of Finished Thermocole Insulation With Pvc Polythene Clothes By Hooking, Clamping, Etc. , Finally, Covering Of The Surface By Aluminium Cladding/Plastering With Sand And Cement Mixture After Applying Chicken Wire Mesh. , Ducting Work By 24 Gz G.I. Sheet, Including Fabrication And Installation By G.I. Rod, M.S. Angle, G.I. Nut - Bolt, Etc. Including Allied Items. , Ducting Work By 22 Gz G.I. Sheet, Including Fabrication And Installation By G.I. Rod, M.S. Angle, G.I. Nut - Bolt, Etc. Including Allied Items. , Complete Insulation Of Ducting By 13 Mm Fire Retardant Nitrile Rubber Insulating Material With Allied Items. , Supply, Fitting And Balancing Of Powder Coated Supply Air-Grille. , Supply, Fitting And Balancing Of Powder Coated Return Air-Grille. , Supply, Fitting And Balancing Of Diffuser With Vcd , Supply, Fitting And Balancing Of Diffuser Without Vcd , Supply, Fitting And Balancing Of Vcd , Supply, Fitting And Balancing Of Fire Damper , Complete Gas Charging Of The 5.5 Tr A.C. Unit After Cutting And Welding Of Copper Refrigerant Pipe Line With Flushing And Leak Testing By Nitrogen Gas Of The Entire Refrigeration System And Finally Vaccumizing Of The System , Complete Overhauling Of 5.5 Tr A.C. Unit By Chemical Solution Including Cleaning Of Cooling Coil, Conderser Coil, Housing, Runner, Fan Etc. Oiling Of Motors, Checking And Rectification Of Electrical Connection/Contact. , Supply And Fitting Of Drier (As Above) , Electrical Cabling In Between Indoor And Outdoor Units (As Above) , Replacement Of Electrical Control Set(As Above) , Thorough Flushing-Out Of Water And Moisture From The Condensing Units And Cooling Unit By Nitrogen Gas Pressure And Heating Process, After Making The Necessary Arrangement For This Procedure Of Work. (As Above) , Inter Connected Copper Refrigerant Pipe Between Outdoor Unit And Indoor Unit With Insulation , Clamping Etc. (Both Suction And Discharge Refrigerent Pipes) (As Above) , Supply Of Split A.C. Unit , (I) 1.5 Tr , (Ii) 2.0 Tr , Installation Charges Of New Split A.C. Unit , Monthly Preventive Maintenance Charge For All A.C. Units, Etc., Including Unlimited Breakdown Call Attending. , Any Other Items Not Listed Above (The Value Will Be Treated As Percentage Only For This Row) , If Applicable Manpower For Operation On Round The Clock Wise, 365 Days Basic One Manpower Per Shift (1X3+1) As Per Current Wblc Rate.(Contractor Will Quote Service Charge Only In Percentage Above Or Below) (Service Charge Must Be As Per Govt Norms)If Applicable

BOQ

Name of Work:- AMC of AC Machines (Window AC, Split AC, etc.) with similar equipments at ESI Hospital Manicktala & ESI Hospital Budge Budge
Sl. No. Item Description
1Dismantling and re-installation of A.C. Machine:-
2(i) Split A.C.
3(ii) Window A.C.
4Providing new copper pipe line (high side & low side) with insulation, electrical cable and PVC water drain out line including fitting & fixing complete for split A.C. unit
5Complete Overhauling of the A.C. unit by chemical solution including cleaning of cooling coil, condenser coil, housing, runner, fan, etc. Oiling of motors, checking and rectification of electrical connection/contact.
6Replacement of condenser fan-motor of Split AC/Window AC/Mortuary Cooler.
7Complete Gas Charging of the A.C. unit after cutting and welding of copper refrigerant pipe line with flushing and leak testing by nitrogen gas of the entire refrigeration system and finally vaccumizing of the system.
8Complete repairing, testing and fitting of display PCB Circuit board SplitAC/ Window AC.
9Replacement of display PCB circuit board.
10Replacement of Remote of Split AC/Window AC
11Replacement of Metal (aluminium) Capacitor):-
12(i) 4 MFD
13(ii) 6 MFD
14(iii) 36 MFD
15(iv) 45 MFD
16(v) 50 MFD
17Replacement of Compressor (Rotary/Schroll) :-
18(i) 1.0 TR Rotary
19(ii) 1.5 TR Rotary
20(iii) 2.0 TR Rotary
21(iv) 5.5 TR Scroll
22Replacement of Compressor (inverter) :-
23(i) 1.0 TR Rotary
24(ii) 1.5 TR Rotary
25(iii) 2.0 TR Rotary
26Repairing of Reciprocating Compressor :
27(i) 1.0 TR Rotary
28(ii) 1.5 TR Rotary
29(iii) 2.0 TR Rotary
30Replacement of Blower of Split AC/Window AC
31Replacement of Reciprocating Compressor :
32(i) 1.0 TR Rotary
33(ii) 1.5 TR Rotary
34(iii) 2.0 TR Rotary
35Replacement of base rubber bush set of compressor
36Replacement of terminal of compressor
37Replacement of Condensor housing Window AC
38Replacement of Condensor fan Split AC/Window AC/Mortuary Cooler
39Replacement of blower housing of Window AC
40Replacement of grill of IDU of Split AC
41Replacement of Condensor housing Split AC
42Replacement of base plate of Window AC
43Replacement of copper U bend of condensor coil
44Replacement of copper U bend of cooling coil
45Replacement of Condensor fan
46Replacement of blower Split AC
47Replacement of blower Window AC
48Repairing of condensor fan-motor
49Repairing of blower-motor
50Repairing of display board
51Replacement of condensor/blower- motor shaft
52Replacement of condensor/blower- motor bush/bearing
53Replacement of swing motor
54Replacement of angle valve
55Replacement of Blower Motor Split AC/Mortuary Cooler
56Replacement of Condensor fan -motor of Split AC / WindowAC/Mortuary Cooler
57Replacement of Copper capllary tube and Strainer
58Replacement of metal bracket for ODU of Split AC
59Replacement of of wooden frame for Window AC
60Replacement of Air filter of Split AC/Window AC
61Necessary electrical spare parts changing with thorough checking andrectification of electrical circuit.
62Replacement of Condensor Coil of Split AC/Window AC
63Complete Gas Charging of Inverter A.C. unit after cutting and welding of copper refrigerant pipe line with flushing and leak testing by nitrogen gas of the entire refrigeration system and finally vaccumizingof the system.
64Complete repairing, testing and fitting of PCB Circuit board of InverterAC.
65Replacement of display PCB circuit board of Inverter AC
66Complete overhauling of Mortuary Cooler by chemical solution including cleaning of cooling coil, condensor coil, housing, runner, fan etc. Oiling of motors, checking and rectification of electricalconnection/contact
67Complete Gas Charging of the Mortuary Cooler after cutting and welding of copper refrigerant pipe line with flushing and leak testing by nitrogen gas of the entire refrigeration system and finallyvaccumizing of the system.
68Replacement of Compressor of Mortuary Cooler
69Complete repairing of Compressor including necessary replacement of spare parts and fresh oil charging of Cooling unit for Blood Bank
70Complete gas charging of the system after pressure testing, leaktesting and vaccumizing of the entire refrigerartion system cooling unit, Blood Bank
71Replacement of Expansion Valve (as above)
72Replacement of shaft seal Assembly (as above)
73Replacement of Fly wheel of compressor (as above)
74Replacement of V Belts of Compressor- Motor (as above)
75Rewinding of Compressor - Motor including replacement of bearing (asabove)
76Rewinding of Condensor/Blower Motor including replacement ofbearing (as above)
77Replacement of Condensor/Blower Motor (as above)
78Replacement of Drier (as above)
79Replacement of Heat Exchanger(as above)
80Replacement of service valve of compressor
81Replacement of metal base frame of compressor-motor assembly withallied accessories(as above)
82Replacement of condensor housing with all fittings(as above)
83Replacement of shaft seal flange set (as above)
84Replacement of shaft (as above)
85Replacement of piston set(as above)
86Replacement of valve plate set
87Replacement ofElectrical Control set (as above)
88Complete heating-varnishing of compressor-motor after complete dismantling including necessary replacement of bearings and greasing finally re-assembling and testing (as above)
89Digital Ammeter
90Replacement of Mechanical Air filter
91Replacement of Actuator
92Complete dismantling including scrapping the old worn - out insulation from the chill water pipe lines and removing it from the site with thorough cleaning. Finally smoothening of the surface of the pipe lines
93Complete fitting, fixing and pasting of TF quality circular block thermocole by cold bitumen paste on the chill water pipe lines/nitrile rubber insulation by adhesive, by cutting bending the same as per position. Filling the joints by the bitumen paste/insulation tape.
94Complete air proof covering of finished thermocole insulation withPVC polythene clothes by hooking, clamping, etc.
95Finally, covering of the surface by aluminium cladding/plastering withsand and cement mixture after applying chicken wire mesh.
96Ducting work by 24 Gz G.I. Sheet, including fabrication and installation by G.I. rod, M.S. angle, G.I. nut - bolt, etc. including allied items.
97Ducting work by 22 Gz G.I. Sheet, including fabrication and installation by G.I. rod, M.S. angle, G.I. nut - bolt, etc. including allied items.
98Complete insulation of ducting by 13 mm fire retardant nitrile rubberinsulating material with allied items.
99Supply, fitting and balancing of powder coated Supply air-grille.
100Supply, fitting and balancing of powder coated Return air-grille.
101Supply, fitting and balancing of Diffuser with VCD
102Supply, fitting and balancing of Diffuser without VCD
103Supply, fitting and balancing of VCD
104Supply, fitting and balancing of Fire Damper
105Complete Gas Charging of the 5.5 TR A.C. unit after cutting and welding of copper refrigerant pipe line with flushing and leak testing by nitrogen gas of the entire refrigeration system and finallyvaccumizing of the system
106Complete overhauling of 5.5 TR A.C. unit by chemical solution including cleaning of cooling coil, conderser coil, housing, runner, fan etc. Oiling of motors, checking and rectification of electricalconnection/contact.
107Supply and fitting of Drier (as above)
108Electrical cabling in between indoor and outdoor units (as above)
109Replacement of Electrical Control set(as above)
110Thorough flushing-out of water and moisture from the condensing units and cooling unit by nitrogen gas pressure and heating process, after making the necessary arrangement for this procedure of work.(as above)
111Inter connected copper refrigerant pipe between outdoor unit andindoor unit with insulation , clamping etc. (both suction and discharge refrigerent pipes) (as above)
112Supply of Split A.C. Unit
113(i) 1.5 TR
114(ii) 2.0 TR
115Installation charges of new Split A.C. Unit
116Monthly Preventive Maintenance charge for all A.C. units, etc.,including unlimited breakdown call attending.
117ANY OTHER ITEMS NOT LISTED ABOVE(The value will be treated as Percentage only for this row)
118if applicableManpower for operation on round the clock wise, 365 days basic one manpower per shift (1x3+1) as per current WBLC rate.(Contractor will quote service charge only in percentage above or below) (Service charge must be as per Govt Norms)if applicable Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56886838
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 27-08-2026
Authority
Authority Name Labour Department
Work Description Tender for annual maintenance contract Of Ac Machines (Window Ac, Split Ac, Etc.) With Similar Equipments At Esi Hospital Manicktala & Esi Hospital Budge Budge , Dismantling And Re-Installation Of A.C. Machine:- , (I) Split A.C. , (Ii) Window A.C. , Providing New Copper Pipe Line (High Side & Low Side) With Insulation, Electrical Cable And Pvc Water Drain Out Line Including Fitting & Fixing Complete For Split A.C. Unit , Complete Overhauling Of The A.C. Unit By Chemical Solution Including Cleaning Of Cooling Coil, Condenser Coil, Housing, Runner, Fan, Etc. Oiling Of Motors, Checking And Rectification Of Electrical Connection/Contact. , Replacement Of Condenser Fan-Motor Of Split Ac/Window Ac/ Mortuary Cooler. , Complete Gas Charging Of The A.C. Unit After Cutting And Welding Of Copper Refrigerant Pipe Line With Flushing And Leak Testing By Nitrogen Gas Of The Entire Refrigeration System And Finally Vaccumizing Of The System. , Complete Repairing, Testing And Fitting Of Display Pcb Circuit Board Split Ac/ Window Ac. , Replacement Of Display Pcb Circuit Board. , Replacement Of Remote Of Split Ac/Window Ac , Replacement Of Metal (Aluminium) Capacitor):- , (I) 4 Mfd , (Ii) 6 Mfd , (Iii) 36 Mfd , (Iv) 45 Mfd , (V) 50 Mfd , Replacement Of Compressor (Rotary/Schroll) :- , (I) 1.0 Tr Rotary , (Ii) 1.5 Tr Rotary , (Iii) 2.0 Tr Rotary , (Iv) 5.5 Tr Scroll , Replacement Of Compressor (Inverter) :- , (I) 1.0 Tr Rotary , (Ii) 1.5 Tr Rotary , (Iii) 2.0 Tr Rotary , Repairing Of Reciprocating Compressor : , (I) 1.0 Tr Rotary , (Ii) 1.5 Tr Rotary , (Iii) 2.0 Tr Rotary , Replacement Of Blower Of Split Ac/Window Ac , Replacement Of Reciprocating Compressor : , (I) 1.0 Tr Rotary , (Ii) 1.5 Tr Rotary , (Iii) 2.0 Tr Rotary , Replacement Of Base Rubber Bush Set Of Compressor , Replacement Of Terminal Of Compressor , Replacement Of Condensor Housing Window Ac , Replacement Of Condensor Fan Split Ac/Window Ac/Mortuary Cooler , Replacement Of Blower Housing Of Window Ac , Replacement Of Grill Of Idu Of Split Ac , Replacement Of Condensor Housing Split Ac , Replacement Of Base Plate Of Window Ac , Replacement Of Copper U Bend Of Condensor Coil , Replacement Of Copper U Bend Of Cooling Coil , Replacement Of Condensor Fan , Replacement Of Blower Split Ac , Replacement Of Blower Window Ac , Repairing Of Condensor Fan-Motor , Repairing Of Blower-Motor , Repairing Of Display Board , Replacement Of Condensor/Blower- Motor Shaft , Replacement Of Condensor/Blower- Motor Bush/Bearing , Replacement Of Swing Motor , Replacement Of Angle Valve , Replacement Of Blower Motor Split Ac/Mortuary Cooler , Replacement Of Condensor Fan -Motor Of Split Ac / Window Ac/Mortuary Cooler , Replacement Of Copper Capllary Tube And Strainer , Replacement Of Metal Bracket For Odu Of Split Ac , Replacement Of Of Wooden Frame For Window Ac , Replacement Of Air Filter Of Split Ac/Window Ac , Necessary Electrical Spare Parts Changing With Thorough Checking And Rectification Of Electrical Circuit. , Replacement Of Condensor Coil Of Split Ac/Window Ac , Complete Gas Charging Of Inverter A.C. Unit After Cutting And Welding Of Copper Refrigerant Pipe Line With Flushing And Leak Testing By Nitrogen Gas Of The Entire Refrigeration System And Finally Vaccumizing Of The System. , Complete Repairing, Testing And Fitting Of Pcb Circuit Board Of Inverter Ac. , Replacement Of Display Pcb Circuit Board Of Inverter Ac , Complete Overhauling Of Mortuary Cooler By Chemical Solution Including Cleaning Of Cooling Coil, Condensor Coil, Housing, Runner, Fan Etc. Oiling Of Motors, Checking And Rectification Of Electrical Connection/Contact , Complete Gas Charging Of The Mortuary Cooler After Cutting And Welding Of Copper Refrigerant Pipe Line With Flushing And Leak Testing By Nitrogen Gas Of The Entire Refrigeration System And Finally Vaccumizing Of The System. , Replacement Of Compressor Of Mortuary Cooler , Complete Repairing Of Compressor Including Necessary Replacement Of Spare Parts And Fresh Oil Charging Of Cooling Unit For Blood Bank , Complete Gas Charging Of The System After Pressure Testing, Leak Testing And Vaccumizing Of The Entire Refrigerartion System Cooling Unit, Blood Bank , Replacement Of Expansion Valve (As Above) , Replacement Of Shaft Seal Assembly (As Above) , Replacement Of Fly Wheel Of Compressor (As Above) , Replacement Of V Belts Of Compressor- Motor (As Above) , Rewinding Of Compressor - Motor Including Replacement Of Bearing (As Above) , Rewinding Of Condensor/Blower Motor Including Replacement Of Bearing (As Above) , Replacement Of Condensor/Blower Motor (As Above) , Replacement Of Drier (As Above) , Replacement Of Heat Exchanger(As Above) , Replacement Of Service Valve Of Compressor , Replacement Of Metal Base Frame Of Compressor-Motor Assembly With Allied Accessories(As Above) , Replacement Of Condensor Housing With All Fittings(As Above) , Replacement Of Shaft Seal Flange Set (As Above) , Replacement Of Shaft (As Above) , Replacement Of Piston Set(As Above) , Replacement Of Valve Plate Set , Replacement Ofelectrical Control Set (As Above) , Complete Heating-Varnishing Of Compressor-Motor After Complete Dismantling Including Necessary Replacement Of Bearings And Greasing Finally Re-Assembling And Testing (As Above) , Digital Ammeter , Replacement Of Mechanical Air Filter , Replacement Of Actuator , Complete Dismantling Including Scrapping The Old Worn - Out Insulation From The Chill Water Pipe Lines And Removing It From The Site With Thorough Cleaning. Finally Smoothening Of The Surface Of The Pipe Lines , Complete Fitting, Fixing And Pasting Of Tf Quality Circular Block Thermocole By Cold Bitumen Paste On The Chill Water Pipe Lines/Nitrile Rubber Insulation By Adhesive, By Cutting Bending The Same As Per Position. Filling The Joints By The Bitumen Paste/Insulation Tape. , Complete Air Proof Covering Of Finished Thermocole Insulation With Pvc Polythene Clothes By Hooking, Clamping, Etc. , Finally, Covering Of The Surface By Aluminium Cladding/Plastering With Sand And Cement Mixture After Applying Chicken Wire Mesh. , Ducting Work By 24 Gz G.I. Sheet, Including Fabrication And Installation By G.I. Rod, M.S. Angle, G.I. Nut - Bolt, Etc. Including Allied Items. , Ducting Work By 22 Gz G.I. Sheet, Including Fabrication And Installation By G.I. Rod, M.S. Angle, G.I. Nut - Bolt, Etc. Including Allied Items. , Complete Insulation Of Ducting By 13 Mm Fire Retardant Nitrile Rubber Insulating Material With Allied Items. , Supply, Fitting And Balancing Of Powder Coated Supply Air-Grille. , Supply, Fitting And Balancing Of Powder Coated Return Air-Grille. , Supply, Fitting And Balancing Of Diffuser With Vcd , Supply, Fitting And Balancing Of Diffuser Without Vcd , Supply, Fitting And Balancing Of Vcd , Supply, Fitting And Balancing Of Fire Damper , Complete Gas Charging Of The 5.5 Tr A.C. Unit After Cutting And Welding Of Copper Refrigerant Pipe Line With Flushing And Leak Testing By Nitrogen Gas Of The Entire Refrigeration System And Finally Vaccumizing Of The System , Complete Overhauling Of 5.5 Tr A.C. Unit By Chemical Solution Including Cleaning Of Cooling Coil, Conderser Coil, Housing, Runner, Fan Etc. Oiling Of Motors, Checking And Rectification Of Electrical Connection/Contact. , Supply And Fitting Of Drier (As Above) , Electrical Cabling In Between Indoor And Outdoor Units (As Above) , Replacement Of Electrical Control Set(As Above) , Thorough Flushing-Out Of Water And Moisture From The Condensing Units And Cooling Unit By Nitrogen Gas Pressure And Heating Process, After Making The Necessary Arrangement For This Procedure Of Work. (As Above) , Inter Connected Copper Refrigerant Pipe Between Outdoor Unit And Indoor Unit With Insulation , Clamping Etc. (Both Suction And Discharge Refrigerent Pipes) (As Above) , Supply Of Split A.C. Unit , (I) 1.5 Tr , (Ii) 2.0 Tr , Installation Charges Of New Split A.C. Unit , Monthly Preventive Maintenance Charge For All A.C. Units, Etc., Including Unlimited Breakdown Call Attending. , Any Other Items Not Listed Above (The Value Will Be Treated As Percentage Only For This Row) , If Applicable Manpower For Operation On Round The Clock Wise, 365 Days Basic One Manpower Per Shift (1X3+1) As Per Current Wblc Rate.(Contractor Will Quote Service Charge Only In Percentage Above Or Below) (Service Charge Must Be As Per Govt Norms)If Applicable
Basic Detail
Tender No ESIH/MNKT/401500/1/26/4228
Bidding Type Tender
Location
City Kolkata
State West Bengal
Key Dates
Publish Date 06 Aug 2026
Submission Date 27 Aug 2026
Open Date 29 Aug 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 1 Lakhs
Exemption Available
Document List
BOQ_2546557.xls
d903650c-3324-4be6-8fdc-a40c2b2c1b14.html
Tendernotice_1 (16).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 06, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 27, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 18 days
Aug 29, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 20 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_2546557.xls

html

d903650c-3324-4be6-8fdc-a40c2b2c1b14.html

pdf

Tendernotice_1 (16).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders