Tender For 3_Construction Of Recharge Shaft (5), Pakka Checkdem (2), Whs(2), Whs Renovation(3), Rt-Whs(3 ), Anicut Renovation (2) Anicut Construction (2) ( Total Works 19) Gram Panchyat Dovani, Nimbahera, Bamniya, Hingoriya Pandoli Block Kapasan Unde
Tender Overview
Project Description
Tender for 3_Construction Of Recharge Shaft (5), Pakka Checkdem (2), Whs(2), Whs Renovation(3), Rt-Whs(3 ), Anicut Renovation (2) Anicut Construction (2) ( Total Works 19) Gram Panchyat Dovani, Nimbahera, Bamniya, Hingoriya Pandoli Block Kapasan Under Project Yojna Mjsa 2.0 Phase 3Rd State Fund District Chittorgarh
BOQ
| Sl. No. | Item Description |
| 1 | ACTIVITY-RECHARGE SHAFT (5)Construction of Tube Well up to 100 mtr. depth in all type of rocks by DTH system & over burden to accommodate casing pipe of following sizes in all types of soils & over burden including lowering of casing pipes, (if required) excluding cost of casing pipes, as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications. The work would be completed after obtaining sand free water. The tube well should have a through out bore as per nominal dia of casing pipe. (PHED BSR,Iteam No.2.4.2) Nominal bore 200 mm dia. |
| 2 | Supply of strainer pipes made of ERW M.S. black pipe ISI mark of following sizes at the site of work including required size of slotting as per IS:8110-1985.200 mm dia NB (Thickness of pipe 5.4mm & mass of tube 28.46 Kg/m) |
| 3 | Labour charges for making slots on blank pipes made of ERW MS black pipe ISI marked of following sizes, the slotting should be as per IS:8110-1985. (PHED BSR,Iteam No2.12.3) 200 mm dia nominal bore of 5.4mm thickness |
| 4 | जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य सख्त मिट्टी (in Hard Soil) BSR item no. 196 (b) |
| 5 | सीमेंट कंक्रीट 1 सीमेंट : 4 बजरी तथा 8 गिट्टी / 1 सीमेंट, 3 बजरी तथा6 गिट्टी पत्थर की 40 मिमी नामीय माप की नींव में डालना,कूटना तथा तराई आदि सहित। BSR item no. 170a |
| 6 | एनीकट हेतु पत्थर की चिनाई सीमेंट-बजरी 1 : 6 मसाले में। BSR item no. 166a |
| 7 | सीमेन्ट प्लस्टर दीवार पर 1:4 अनुपात में सीमेन्ट - बजरी मिलाकर जोडों को कुरेदने तथा 14 दिन तक नियमित तराई सहित 25 मि.मी. मोटाई (केवल जलरोधी संरचनाओ के उपयोग हेतु) BSR item no. 76a |
| 8 | अव्वल दर्जे की पत्थर की पट्टियों की छत डालना, उपर तथा नीचे से जोड़ों में पत्थर की चाप के साथ 1:4 अनुपात में सीमेंट मसाले से भरना ABOVE 3M span item no. 45(द) bsr ps kapasan 2022 |
| 9 | सीमेंट कंक्रीट 1 सीमेंट : 2 बजरी : 4 पत्थर एग्रीगेट अनुपात में 12 मिमी नामीय माप की एग्रीगेट के साथ डालना,कूटना तथा तराई आदि सहित । item 16 |
| 10 | Stone (RR) (Material Item no. 9.1) |
| 11 | 40 मि.मी.नामीय माप की क्रेशर रोड़ी कार्य स्थल पर (xzkeh.k dk;Z funsZf'kdk 2022 dh CykWd Lrjh; nj vuqlwph iapk;r lfefr kapasan ds vuqlkj dz-la- 6-1) |
| 12 | 20 मि.मी.नामीय माप की क्रेशर रोड़ी कार्य स्थल पर (xzkeh.k dk;Z funsZf'kdk 2022 dh CykWd Lrjh; nj vuqlwph iapk;r lfefr kapasan ds vuqlkj dz-la- 6-3) |
| 13 | 12/10/6 मि.मी.नामीय माप की क्रेशर रोड़ी कार्य स्थल पर (xzkeh.k dk;Z funsZf'kdk 2022 dh CykWd Lrjh; nj vuqlwph iapk;r lfefr kapasan ds vuqlkj dz-la- 6-4) |
| 14 | Sand GKN BSR 2022 (xzkeh.k dk;Z funsZf'kdk 2022 dh CykWd Lrjh; nj vuqlwph iapk;r lfefr kapasan Material Item No. 5.2) |
| 15 | 110 मिमी व्यास के पी.वी.सी. पाईप का डालना मय अन्य आवश्यक सामग्री साहित (xzkeh.k dk;Z funsZf'kdk 2022 dh CykWd Lrjh; nj vuqlwph iapk;r lfefr kapasan ds vuqlkj dz-la- 181) |
| 16 | सफेदी का कार्य 3 तह में ताकि इकसार आभा हो जाये (To give even shade) नये कार्य पर/पुराने कार्य पर, रगड़ना, सतह बनाना आदि पूर्ण पाड़बन्दी सहित। item no 80 a |
| 17 | Accessories (Nipple,bend,mainhole cover(dhakkan),tubewell cover etc |
| 18 | [kqnh gqbZ feVVh @jsr dks uho esa rFkk dqlhZ esa 50 ehVj rd nwjh esa Mkyuk rFkk lery djuk ]ikuh Mkyuk rFkk nwjewV ls dqVukA BSR item no. 5 |
| 19 | Board /pattika |
| 20 | ACTIVITY-PAKKA CHECKDEM (2 WORK)जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. e'khujh dk;Z l[r feVVh esas ¼vkbZVe la[;k 196 c½ |
| 21 | lhesaV dadjhV 1 lhesaV 4 ctjh rFkk 8 fxVVh iRFkj dh 40 eheh ukHkh; eki uhoa es Mkyuk] dqVuk RkFkk rjkbZ vkfn lfgrA ¼vkbZVe la[;k 170 v½ |
| 22 | ,fudV gsrq iRFkj dh fpukbZ lhesasV] ctjh 1 % 6 elkysa es अधिरचना चिनाईA es ¼vkbZVe la[;k 166 v½ |
| 23 | lhesaV dadzhV 1 lhesaV 2 ctjh rFkk 4iRFkj fxVVh 12 mm vuqikr es Mkyuk] dqVuk] rjkbZ djuk ¼vkbZVe la[;k 16 ½ |
| 24 | lhesaV iykLVj fnokj ij 1%4 vuqikr es lhesaV ctjh feykdj tksMksa dks dqjsnus rFkk 14 fnu rd fu;fer rjkbZZ lfgr 25 eheh eksVkbZ ¼vkbZVe la[;k 76 v½ |
| 25 | [kqnh gqbZ feV~Vh dks uhoa es rFkk dqlhZ es 50 ehVj nqjh rd Mkyuk rFkk lery djuk] ikuh Mkyuk rFkk nqjeqV ls dqVuk ¼vkbZVe la[;k 5 ½ |
| 26 | Board |
| 27 | Activiy - WHS Renovation new westwair Benipuriyaजे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Item no. 196 b. e'khujh dk;Z l[r feVVh esas ¼vkbZVe la[;k 196 c½ |
| 28 | lhesaV dadjhV 1 lhesaV 4 ctjh rFkk 8 fxVVh iRFkj dh 40 eheh ukHkh; eki uhoa es Mkyuk] dqVuk RkFkk rjkbZ vkfn lfgrA ¼vkbZVe la[;k 170 v½ |
| 29 | ,fudV gsrq iRFkj dh fpukbZ lhesasV] ctjh 1 % 6 elkysa es अधिरचना चिनाईA es ¼vkbZVe la[;k 166 v½ |
| 30 | lhesaV dadzhV 1 lhesaV 2 ctjh rFkk 4iRFkj fxVVh 12 mm vuqikr es Mkyuk] dqVuk] rjkbZ djuk ¼vkbZVe la[;k 16 ½ |
| 31 | lhesaV iykLVj fnokj ij 1%4 vuqikr es lhesaV ctjh feykdj tksMksa dks dqjsnus rFkk 14 fnu rd fu;fer rjkbZZ lfgr 25 eheh eksVkbZ ¼vkbZVe la[;k 76 v½ |
| 32 | [kqnh gqbZ feV~Vh dks uhoa es rFkk dqlhZ es 50 ehVj nqjh rd Mkyuk rFkk lery djuk] ikuh Mkyuk rFkk nqjeqV ls dqVuk ¼vkbZVe la[;k 5 ½ |
| 33 | tsaxy dh lQkbZ ]lk/kkj.k ouLifr rFkk >kfM+;ksa dks dkVus lfgrABSR item No. 191 |
| 34 | जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य सख्त मिट्टी (in Hard Soil) BSR item no. 196 (b) |
| 35 | Compation of Earth or highly weathered strata by Manually plain roller (density 90% of Proctor) WRD BSR Chapter Vth 2023 item no.(18A) |
| 36 | Watering of Earth inculding cost of Carriage of Water When Source of Water is Beyond 1 Km. but extra per km. BSR Chapter Vth 2023 item no.(28 A) |
| 37 | Stone wall को तोड़ना तथा टूटी सामग्री को 50 मीटर दूरी तक फैंकना। Item 112 b |
| 38 | Board |
| 39 | WHS Renovation- 2 workजे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। मशीनरी कार्य सख्त मिट्टी (in Hard Soil)( Bsr item no. 196B) |
| 40 | पुराने प्लास्तर (Lime or Cement) को तोड़ना, जोड़ों को कुरेदना तथा सतह को साफ करना। Item 115 b |
| 41 | सीमेंट कंक्रीट 1 सीमेंट : 4 बजरी तथा 8 गिट्टी / गिट्टी पत्थर की 20 मिमी नामीय माप की नींव में डालना,कूटना तथा तराई आदि सहित एनीकट के लिए। 1:4:8 वाईब्रटर व मिक्सर का उपयोग नही करने पर 3 प्रतिशत की कटोती की जावेगी।( Bsr item no. 170 A) |
| 42 | Centering & Shuttering with plywood or steel sheets including strutting, propping , bracing both ways and removal of form work for foundation in basements rafts, footings, strap beams, bases of columns , etc. upto plinth level. ( PS- BSR2025Itam No. 93b) |
| 43 | Reinforced Cement Concrete work in beams, Suspended floors, Girders having slopes up to 150 ,Landings, Balconies, Shelves, Chajjas, Lintels, Bands, Plain window sills, With 1:1.5:3 (1 cement : 1.5 : coarse sand : 3 graded stone aggregate 20mm nominal size)Staircases and Spiral Staircases up to floor three level includind curing, compaction, Finishing with rendering in cement sand mortar 1:3(1 Cement : 3 Coarse Sand) and making good and joints excluding the cost of centering, Shuttering and reinforcement:( PS- BSR2025Item No. 13b) |
| 44 | Providing & fabricating steel reinforcement for R.C.C. work including cutting , bending, placing in position and binding complete including cost of binding wire in foundations, Raft footing step Beams base of columns etc. all complete up o floor three level.( PS- BSR2025Itam No. 61) 10 mm sariya weight per mtr 0.617kg |
| 45 | एनीकट हेतु पत्थर की चिनाई सीमेंट-बजरी मसाले में। uho ]sa1 : 6 में ।( Bsr item no. 166 A) |
| 46 | एनीकट हेतु पत्थर की चिनाई सीमेंट-बजरी मसाले में। vf/klajpuk esa1 : 6 में ।( Bsr item no. 166 A) |
| 47 | सीमेन्ट प्लस्टर दीवार पर 1:4 अनुपात में सीमेन्ट - बजरी मिलाकर जोडों को कुरेदने तथा 14 दिन तक नियमित तराई सहित 25 मि.मी. मोटाई (केवल जलरोधी संरचनाओ के उपयोग हेतु)( Bsr item no. 76 A) |
| 48 | सीमेंट कंक्रीट 1 सीमेंट : 2 बजरी : 4 पत्थर एग्रीगेट अनुपात में 12 मिमी नामीय माप की एग्रीगेट के साथ डालना,कूटना तथा तराई आदि सहित । Bsr item no. 16) |
| 49 | taxy dh lQkbZ ]lk/kkj.k ouLifr rFkk >kfM+;ksa dks dkVus lfgrABSR item No. 191 |
| 50 | जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य सख्त मिट्टी (in Hard Soil) BSR item no. 196 (b) |
| 51 | खुदी हुई मिट्टी/रेत को नीव में तथा कुर्सी में 50 मीटर तक दूरी (Lead) में डालना तथा समतल करना , पानी डालना तथा दूरमुट से कुटना। Bsr item no. 5) |
| 52 | board /paint work detail |
| 53 | WHS Nirman (2 Work)जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. e'khujh dk;Z l[r feVVh esas ¼vkbZVe la[;k 196 c½ |
| 54 | lhesaV dadjhV 1 lhesaV 4 ctjh rFkk 8 fxVVh iRFkj dh 40 eheh ukHkh; eki uhoa es Mkyuk] dqVuk RkFkk rjkbZ vkfn lfgrA ¼vkbZVe la[;k 170 v½ |
| 55 | ,fudV gsrq iRFkj dh fpukbZ lhesasV] ctjh 1 % 6 elkysa es चिनाईA es ¼vkbZVe la[;k 166 v½ |
| 56 | lhesaV dadzhV 1 lhesaV 2 ctjh rFkk 4iRFkj fxVVh 12 mm vuqikr es Mkyuk] dqVuk] rjkbZ djuk ¼vkbZVe la[;k 16 ½ |
| 57 | lhesaV iykLVj fnokj ij 1%4 vuqikr es lhesaV ctjh feykdj tksMksa dks dqjsnus rFkk 14 fnu rd fu;fer rjkbZZ lfgr 25 eheh eksVkbZ ¼vkbZVe la[;k 76 v½ |
| 58 | [kqnh gqbZ feV~Vh dks uhoa es rFkk dqlhZ es 50 ehVj nqjh rd Mkyuk rFkk lery djuk] ikuh Mkyuk rFkk nqjeqV ls dqVuk ¼vkbZVe la[;k 5 ½ |
| 59 | Mkxcsfyax djuk 2-5 lseh- 5 lseh xgjkbZ rd As per BSR item No. 6 a |
| 60 | taxy dh lQkbZ ]lk/kkj.k ouLifr rFkk >kfM+;ksa dks dkVus lfgrABSR item No. 191 |
| 61 | जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य सख्त मिट्टी (in Hard Soil) BSR item no. 196 (b) |
| 62 | Compation of Earth or highly weathered strata by Manually plain roller (density 90% of Proctor) WRD BSR Chapter Vth 2023 item no.(18A) |
| 63 | Watering of Earth inculding cost of Carriage of Water When Source of Water is Beyond 1 Km. but extra per km. BSR Chapter Vth 2023 item no.(28 A) |
| 64 | Board or pattika |
| 65 | RTWHS- 3 workConstruction of Tube Well up to 100 mtr. depth in all type of rocks by DTH system & over burden to accommodate casing pipe of following sizes in all types of soils & over burden including lowering of casing pipes, (if required) excluding cost of casing pipes, as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications. The work would be completed after obtaining sand free water. The tube well should have a through out bore as per nominal dia of casing pipe. (PHED BSR,Iteam No.2.4.1) |
| 66 | Supply of ERW M.S. black casing pipe ISI marked (IS: 4270/2001) or amendedup to date of following sizes (PHED BSR,Item No.2.11.1) |
| 67 | Labour charges for making slots on blank pipes made of ERW MS black pipe ISImarked of following sizes, the slotting should be as per IS:8110-1985. (PHED BSR,Iteam No2.12.2) |
| 68 | Supply of bore well cover to accommodate 200 mm MS pipe made of MS flat & MS sheet as per drawings (PWD BSR,Chp S-4-4.8.3) |
| 69 | जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य सख्त मिट्टी (in Hard Soil) {BSR -2026 P.S. Kapasan , Item No.196 (b)} |
| 70 | Cement concrete well mixed in cement mortar( 1:4:8 ) laid in position complete including curing. Aggregate size up to 20 mm. {BSR -2026 P.S. Kapasan, Item No.170 (a)} |
| 71 | नींव तथा कुर्सी प्रथम श्रेणी ईंट की चिनाई सीमेन्ट -बजरी 1:6 या 1:8 मसाले में, मय बगल की झिरी बन्द करने तथा तराई सहित। सीमेन्ट मसाला 1:6 {BSR -2026 P.S. Kapasan, Item No.20 (a)} |
| 72 | Cement plaster including smooth finishing in cement mortar ( 1:4 ) 25 mm thick{BSR -2026 P.S. Kapasan, Item No.76 (a)} |
| 73 | अव्वल दर्जे की पत्थर की पट्टियों की छत डालना, उपर तथा नीचे से जोड़ों में पत्थर की चाप के साथ 1:4 अनुपात में सीमेंट मसाले से भरना 1.5 m to 2.4 m span {BSR -2026 P.S. Kapasan, Item No.45 (c)} |
| 74 | 50 मिमी मोटाई में सीमेंट कंक्रीट 1:2:4 मिश्रण जिसमें 1 सीमेंट 2 बजरी 4 पत्थर की या ईंट की 12 मी. नामीय गिट्टी के साथ मिलाकर डालना, कूटना, दबाना तथा तराई आदि सहित। पत्थर की गिट्टी {BSR -2026 P.S. Kapasan, Item No.14 (a)} |
| 75 | Supply & lying River-gravels of following sizes in recharge shaft filter pit after screening & washing from kachha shift without deduction of voids. (PWD BSR-4.28.1,.2) Size 9 to 12 mm,1.54*1.54* 0.50 mtr |
| 76 | Size 3 to 5 mm,1.54*1.54* 0.50 mtr |
| 77 | Providing, lowering, laying and jointing in trenches, standard lengths HDPE ISI marked Pipes as per IS-4984: 1995 (amended up to date) with necessary jointing material like mechanical connectors, i.e. thread/ insert joint/ quick release coupler joint/ compression fitting joint or flanged joint and specials jointing pipe by electro fusion welding method, including all taxes , transportation and freight charges, inspection charges, loading/ unloading charges, stacking of pipes, including cost of labour and material, specials (Tee, bend etc.), satisfactory hydraulic testing, disinfection, commissioning etc. complete as per technical specifications and direction of Engineer-in-charge of following class and diameter. (excluding earth work) . Note : Providing and fixing of all requisite specials as per drawing, design and layout are inclusive in RM measurement of the item and shall not be paid separately.Supply may be in coil or straight length in 6 M/12 M.HDPE PE-80 PN-6 (PHED BSR,Iteam No.1.4.1.2,1.4.1.2)75 mm dia |
| 78 | 90 mm dia |
| 79 | सीमेंट कंक्रीट 1 सीमेंट : 2 बजरी : 4 पत्थर एग्रीगेट अनुपात में 12 मिमी नामीय माप की एग्रीगेट के साथ डालना,कूटना तथा तराई आदि सहित । For Grading/Roof Repairing RD PR BSR 2026 Item no 16 |
| 80 | Iron Cover ग्रिल/गेट आदि में लौहे का कार्य जिसमें सपाट कोनिया, टी तथा नाळीदार (चेनल), को काटना, चढ़ाना तथा लगाना आदि। RD PR BSR 2026 Item no 63 2.5 ft*2.5 ft square shape with complete angles |
| 81 | Board /pattika with paint detail |
| 82 | ACTIVITY - Anicut construction (2 Work)जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य सख्त मिट्टी (in Hard Soil) BSR item no. 196 (b) |
| 83 | सीमेंट कंक्रीट 1 सीमेंट : 4 बजरी तथा 8 गिट्टी / 1 सीमेंट, 3 बजरी तथा6 गिट्टी पत्थर की 20 मिमी नामीय माप की नींव में डालना,कूटना तथा तराई आदि सहित एनीकट के लिए। 1:4:8 वाईब्रटर व मिक्सर का उपयोग नही करने पर 3 प्रतिशत की कटोती की जावेगी। BSR item no.170 a |
| 84 | एनीकट हेतु पत्थर की चिनाई सीमेंट-बजरी मसाले में। uho ]vf/klajpuk esa1 : 6 में BSR item no.166 a |
| 85 | lhesaV dadzhV 1 lhesaV 2 ctjh rFkk 4iRFkj fxVVh 12 mm vuqikr es Mkyuk] dqVuk] rjkbZ djuk ¼vkbZVe la[;k 16 ½ |
| 86 | सीमेन्ट प्लस्टर दीवार पर 1:4 अनुपात में सीमेन्ट - बजरी मिलाकर जोडों को कुरेदने तथा 14 दिन तक नियमित तराई सहित 25 मि.मी. मोटाई (केवल जलरोधी संरचनाओ के उपयोग हेतु) BSR item no.76a |
| 87 | खुदी हुई मिट्टी/रेत को नीव में तथा कुर्सी में 50 मीटर तक दूरी (Lead) में डालना तथा समतल करना , पानी डालना तथा दूरमुट से कुटना। BSR item no.5 |
| 88 | BOARD |
| 89 | Anicut Renovation Badru ji ke khet ke passजे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। मशीनरी कार्य सख्त मिट्टी (in Hard Soil)( Bsr item no. 196B) |
| 90 | पुराने प्लास्तर (Lime or Cement) को तोड़ना, जोड़ों को कुरेदना तथा सतह को साफ करना। Item 115 b |
| 91 | सीमेंट कंक्रीट 1 सीमेंट : 4 बजरी तथा 8 गिट्टी / गिट्टी पत्थर की 20 मिमी नामीय माप की नींव में डालना,कूटना तथा तराई आदि सहित एनीकट के लिए। 1:4:8 वाईब्रटर व मिक्सर का उपयोग नही करने पर 3 प्रतिशत की कटोती की जावेगी।( Bsr item no. 170 A) |
| 92 | Centering & Shuttering with plywood or steel sheets including strutting, propping , bracing both ways and removal of form work for foundation in basements rafts, footings, strap beams, bases of columns , etc. upto plinth level. ( PS- BSR2025Itam No. 93b) |
| 93 | Reinforced Cement Concrete work in beams, Suspended floors, Girders having slopes up to 150 ,Landings, Balconies, Shelves, Chajjas, Lintels, Bands, Plain window sills, With 1:1.5:3 (1 cement : 1.5 : coarse sand : 3 graded stone aggregate 20mm nominal size)Staircases and Spiral Staircases up to floor three level includind curing, compaction, Finishing with rendering in cement sand mortar 1:3(1 Cement : 3 Coarse Sand) and making good and joints excluding the cost of centering, Shuttering and reinforcement:( PS- BSR2025Item No. 13b) |
| 94 | Providing & fabricating steel reinforcement for R.C.C. work including cutting , bending, placing in position and binding complete including cost of binding wire in foundations, Raft footing step Beams base of columns etc. all complete up o floor three level.( PS- BSR2025Itam No. 61) 10 mm sariya weight per mtr 0.617kg |
| 95 | एनीकट हेतु पत्थर की चिनाई सीमेंट-बजरी मसाले में। uho ]sa1 : 6 में ।( Bsr item no. 166 A) |
| 96 | एनीकट हेतु पत्थर की चिनाई सीमेंट-बजरी मसाले में। vf/klajpuk esa1 : 6 में ।( Bsr item no. 166 A) |
| 97 | सीमेन्ट प्लस्टर दीवार पर 1:4 अनुपात में सीमेन्ट - बजरी मिलाकर जोडों को कुरेदने तथा 14 दिन तक नियमित तराई सहित 25 मि.मी. मोटाई (केवल जलरोधी संरचनाओ के उपयोग हेतु)( Bsr item no. 76 A) |
| 98 | सीमेंट कंक्रीट 1 सीमेंट : 2 बजरी : 4 पत्थर एग्रीगेट अनुपात में 12 मिमी नामीय माप की एग्रीगेट के साथ डालना,कूटना तथा तराई आदि सहित । Bsr item no. 16) |
| 99 | खुदी हुई मिट्टी/रेत को नीव में तथा कुर्सी में 50 मीटर तक दूरी (Lead) में डालना तथा समतल करना , पानी डालना तथा दूरमुट से कुटना। Bsr item no. 5) |
| 100 | Board /paint work detail |
| 101 | Anicut Renovation Hingoriya raste parजे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। मशीनरी कार्य सख्त मिट्टी (in Hard Soil)( Bsr item no. 196B) |
| 102 | पुराने प्लास्तर (Lime or Cement) को तोड़ना, जोड़ों को कुरेदना तथा सतह को साफ करना। Item 115 b |
| 103 | Stone wall को तोड़ना तथा टूटी सामग्री को 50 मीटर दूरी तक फैंकना। Item 112 b |
| 104 | सीमेंट कंक्रीट फर्श को तोड़ना तथा टूटी सामग्री को 50 मीटर दूरी तक फैंकना। Item 116 |
| 105 | सीमेंट कंक्रीट 1 सीमेंट : 4 बजरी तथा 8 गिट्टी / गिट्टी पत्थर की 20 मिमी नामीय माप की नींव में डालना,कूटना तथा तराई आदि सहित एनीकट के लिए। 1:4:8 वाईब्रटर व मिक्सर का उपयोग नही करने पर 3 प्रतिशत की कटोती की जावेगी।( Bsr item no. 170 A) |
| 106 | Centering & Shuttering with plywood or steel sheets including strutting, propping , bracing both ways and removal of form work for foundation in basements rafts, footings, strap beams, bases of columns , etc. upto plinth level. ( PS- BSR2025Itam No. 93b) |
| 107 | Reinforced Cement Concrete work in beams, Suspended floors, Girders having slopes up to 150 ,Landings, Balconies, Shelves, Chajjas, Lintels, Bands, Plain window sills, With 1:1.5:3 (1 cement : 1.5 : coarse sand : 3 graded stone aggregate 20mm nominal size)Staircases and Spiral Staircases up to floor three level includind curing, compaction, Finishing with rendering in cement sand mortar 1:3(1 Cement : 3 Coarse Sand) and making good and joints excluding the cost of centering, Shuttering and reinforcement:( PS- BSR2025Item No. 13b) |
| 108 | Providing & fabricating steel reinforcement for R.C.C. work including cutting , bending, placing in position and binding complete including cost of binding wire in foundations, Raft footing step Beams base of columns etc. all complete up o floor three level.( PS- BSR2025Itam No. 61) 10 mm sariya weight per mtr 0.617kg |
| 109 | एनीकट हेतु पत्थर की चिनाई सीमेंट-बजरी मसाले में। uho ]sa1 : 6 में ।( Bsr item no. 166 A) |
| 110 | एनीकट हेतु पत्थर की चिनाई सीमेंट-बजरी मसाले में। vf/klajpuk esa1 : 6 में ।( Bsr item no. 166 A) |
| 111 | सीमेन्ट प्लस्टर दीवार पर 1:4 अनुपात में सीमेन्ट - बजरी मिलाकर जोडों को कुरेदने तथा 14 दिन तक नियमित तराई सहित 25 मि.मी. मोटाई (केवल जलरोधी संरचनाओ के उपयोग हेतु)( Bsr item no. 76 A) |
| 112 | सीमेंट कंक्रीट 1 सीमेंट : 2 बजरी : 4 पत्थर एग्रीगेट अनुपात में 12 मिमी नामीय माप की एग्रीगेट के साथ डालना,कूटना तथा तराई आदि सहित । Bsr item no. 16) |
| 113 | खुदी हुई मिट्टी/रेत को नीव में तथा कुर्सी में 50 मीटर तक दूरी (Lead) में डालना तथा समतल करना , पानी डालना तथा दूरमुट से कुटना। Bsr item no. 5) |
| 114 | Board /paint work detail Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender