Tender For Drawing Dedicated 11Kv Feeder Using Covered Conductor From Kuruvilangad Substation To Avarma Under Electrical Section Peruva
Tender Value
77.07 Lakhs
Estimated cost
Bid Submission
14 Aug 2026
6 days left
EMD
50000
Bank guarantee accepted
Document Fee
5900
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kottayam → Kerala
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Drawing Dedicated 11Kv Feeder Using Covered Conductor From Kuruvilangad Substation To Avarma Under Electrical Section Peruva
BOQ
| Sl. No. | Item Description |
| 1 | Additional rate for excavation of Pit for A type pole in Soft Rock. |
| 2 | Fitting one Additional 2.4/3m Channel cross arm (75x40x6mm), in existing 11kV DP including conveyance of materials. |
| 3 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 4 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 5 | Drilling oval shaped hole of various sizes on existing Channel/Cross Arm/GI/MS cleat etc. |
| 6 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 7 | Insertion of one HT A type pole in existing OH line including digging & backfilling pit in ordinary soil, fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 8 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. |
| 9 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock. |
| 10 | Additional rate for excavation of Pit for A type pole in Hard Laterite. |
| 11 | Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite. |
| 12 | Conveyance of one km 11kV line materials from section store/stacking place to the work site (excluding poles). |
| 13 | Additional rate for providing one HT Pin with insulator, complete on any type of HT pole. |
| 14 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 15 | Additional rate for refitting/redoing one Shackle Set, including reshacling one span, while renewing any type of LT pole. |
| 16 | Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides. |
| 17 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. |
| 18 | Fitting and erecting one HT Double Pole Structure using A type pole in position including fitting 2 No. channel cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 19 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 20 | Fitting one additional Fuse unit and giving connection from Transformer to fuse and Distribution box to LT OH line. |
| 21 | Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil. |
| 22 | Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 23 | Fitting 5 channel cross arms, AB switch, DO fuse, LA(Ord), HT & LT connections upto OH lines, etc. on existing DP structure, Fixing distribution box/provision for one set (3No.) of LT fuses, , drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing & mounting of Transformer on poles. |
| 24 | Additional rate for refitting/redoing one Disc set while renewing any type of 11kV cut pole. |
| 25 | Dismantling (without damage) one HT stay including digging pit in all classes of soil and backfilling, and bringing back to section store. |
| 26 | Fiting One No MVT on existing cross arm excluding termination work (for One phase) of any rating for 11 kV AB Cable |
| 27 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 28 | Fitting and providing one HT Fly stay for 11kV pole using A type pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 29 | Fitting and providing one Strut using A type pole, including digging and back filling pit in ordinary soil. |
| 30 | Renewal of any type of existing damaged/old 11kV Strut with new PSC strut in place including excavation & backfilling of pit, consolidating, dismantling and refitting of all items and conveyance of all materials except pole. |
| 31 | Renewal of any type of existing damaged/old 11kV Strut with new A type strut in place including excavation & backfilling of pit, consolidating, dismantling and refitting of all items and conveyance of all materials except pole. |
| 32 | Dismantling (without damage) one 11kV A type pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 33 | Dismantling (without damage) one Channel cross arm from existing DP structure and bringing back to section store. |
| 34 | Dismantling (without damage) one V cross arm/Channel cross arm from existing Pole and bringing back to section store. |
| 35 | Dismantling (without damage) one AB switch from existing structure and bringing back to section store. |
| 36 | Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing. |
| 37 | Dismantling (without damage) LT stay including digging pit in all classes of soil and backfilling. |
| 38 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 39 | Fitting one Additional V cross arm in existing single pole including conveyance of materials. |
| 40 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole including conveyance of materials. |
| 41 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 42 | Renewal of existing damaged/old 11kV Stay with new stay in place including excavation & backfilling of pit, dismantling, refitting of all items and conveyance of all materials. |
| 43 | Erection of suspension clamp for 11KV ABC of any size |
| 44 | Dismantling one suspension clamp from 11 KV ABC |
| 45 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 46 | Dismantling one Anchor clamp /dead end clamp from 11 KV ABC |
| 47 | Stringing of one km 3 PH 11kV line with XLPE Insulated ACSR Raccoon or equivalant (3 conductors) after fitting insulators, binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and removing tree branches wherever necessary excluding cut point works. |
| 48 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 49 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) after fitting insulators and giving jumper connections including cutting and removing tree branches wherever necessary excluding cut point works. |
| 50 | Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. |
| 51 | Stringing of 11 kV Aerial bunched cable of size 3 x 150 + 1 x 120 sqmm with bare/insulated Messenger through existing poles |
| 52 | Dismantling and reconnecting Sph service connection from the OH line including lowering down the WP portion. |
| 53 | Dismantling and reconnecting 3ph service connection from the OH line including lowering down the WP portion. |
| 54 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires. |
| 55 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 56 | Quoted Amount of BOQ1 in figures |
| 57 | GST Rate in percentage ('18' for GST registered and '0' for GST unregistered) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Aug 07, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 14, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysAug 15, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 7 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender