Power Government Departments Closing in 6 days TDR #56878063

Bids Are invited for Custom Bid For Services - For The Various Works To Give Electric Connection In Full Deposit Scheme At 11 Substations Under The Jurisdiction Of Electricity Urban Distribution Circle, Firozabad - Safety Cartage Of The Following Mat

Issued by Government Departments · Firozabad, Uttar Pradesh
Tender Value
9.50 Lakhs
Estimated cost
Bid Submission
21 Aug 2026
6 days left
EMD
9500
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Firozabad → Uttar Pradesh
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Custom Bid For Services - For The Various Works To Give Electric Connection In Full Deposit Scheme At 11 Substations Under The Jurisdiction Of Electricity Urban Distribution Circle, Firozabad - Safety Cartage Of The Following Material From Centre Stores Asfabad, Firozabad To The Work Site In Firozabad Town Including Loading And Unloading At The Respective Ends. [Distance 00.00 Km To 25.00 Km] , 9/11/13 Mtr Long St /8.5 /9/11/13 Mtr.Pcc Pole , 16/25 Kva Transformer , 63/100 Kva Transformer , 250 Kva Transformer , 11 Kv Xlpe Cable Size 3X70/3X120 Sq.Mm. , 11 Kv Xlpe Cable Size 3X185/3X300 Sq.Mm. , Abc Lt Cable 3X50/70/95/120/2X12/2X16 Sqmm. , Line Material I.E. Conductor, G.I. Wire Tpmo Stay Rod, Disc Insulator, Cross Arm, Angle Channel And Other Required Material From Store Center At Asfabad, Firozabad To The Site Of Work Including Loading And Unloading Of Material At Both Ends. , 11 Kv Vcb , Supply Of Following Material , Nut Bolt , Cl , Danger Board And Number Plate , Barbed Wire , Belting Angle For Transformer Per Dp , Erection Of Single Pole Structure 9/11 Mtrs On St Pole By Digging Of Pits Fitting Of All Relevant Accessories As Per Respo Norms. , Erection Of Double Pole Structure 9/11 Mtrs On St Pole By Digging Of Pits Fitting Of All Relevant Accessories As Per Respo Norms. , Installation Of Stay Set With Grouting And Nuzzling Etc. As Per Respo Drawing Along With All Routine Material To Be Used For Such Works. , Earthing Of Poles By Fixing Earthing Rods And Binding With Earth Wire As Per Standard Norms Including Cost Of Labour T&P And Required Material For Such Work. , Suppy And Erection Of Lt Cl For Pcc/Stp , Laying, Stringing, Sagging, Binding And Jumpering Etc Of Following Conductor On The Erected Supports, As Per Respo Norms. , Acsr Weasel Conductor , Acsr Dog Conductor , Abc Lt Cable 3X50/70/95/120/2X12/2X16 Sqmm. , Lt Pvc Cable , Digging, Laying And Back Filling Of Various 11 Kv Xlpe Cable As Per Respo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Brick, Sand, Labour And T&P Etc. Required For Proper Completion Of The Work. , 11 Kv Xlpe Cable Size 3X70/3X120 Sq.Mm. , 11 Kv Xlpe Cable Size 3X185/3X300 Sq.Mm. , Supply & Filing Of Cable Box As Suitable Size As Per Direction Of Supervising Engineer. , 11 Kv O/D Cable Box 3X70/3X120 Sq.Mm. , 11 Kv O/D Cable Box 3X185/3X300 Sq.Mm. , Chemical Earthing Of Dt Tf (63/100/250) , Chopping Of Tree Branches For Clearance Of Line , Mounting Of 16/25 Kva Transformer On The Double Pole/Plinth Structures And Connections Thereof. , Mounting Of 63/100 Kva Transformer On The Double Pole/Plinth Structures And Connections Thereof. , Mounting Of 250 Kva Transformer On The Double Pole/Plinth Structures And Connections Thereof. , Cutting Of Cc Road For Making Depth Foundation For Erection Of Pole. , Erection Of 11 Kv Vcb Including All Fitting And Arrangements , Installation Of 33/11 Kv Ct/Pt Combined Metering Unit On Existing Double Pole Structure Of Large & Heavy, Power Consumers To Avoid Possibility Of Theft Of Energy & 33/11 Kv Feeders At 33/11 Kv Sub- Station Including The Cost Of Accessories (Nut & Bolt, Pvc Tape Etc.) Required For Proper Completion Of Work Also Provided By The Contractor. (Including Carriage Of New 11 Kv Ct/Pt Combined Metering Unit From Store Center Asfabad, Firozabad To Site Of Work.) , Fixing Of Meter Pilfer Box (Service Connection Meter Holding Capacity) Including Its Carriage From Electricity Store Centre Asfabad, Firozabad To Site Of Work Including Grouting Of Meter Pillar Box In Ratio 1:4:8 Cement, Sand And Brick Ballast As Per Standard Norms. , Grouting And Muffing Of St/Pcc Pole Including Fixing Of Ht Fittings As Per Respo Norms. The Support Shall Be Grouted In Cement, Sand, And Brick Ballast In Ratio 1:2:4. , Guarding Of 11 Kv Line As Per Respo Manual And As Per Direction Of Supervising Engineer , Dismantle Of All Old Excisting Assesories Where As It Is Required & Carriage To Centre Store Asfabad 0-20 Km

BOQ

Sl. No. Item TitleItem Description
1Safety Cartage of the following material from Centre Stores Asfabad, Firozabad to the work site in Firozabad Town including loading and unloading at the respective ends. [Distance 00.00 Km to 25.00 Km]Safety Cartage of the following material from Centre Stores Asfabad, Firozabad to the work site in Firozabad Town including loading and unloading at the respective ends. [Distance 00.00 Km to 25.00 Km]
29/11/13 Mtr Long ST /8.5 /9/11/13 Mtr.PCC Pole9/11/13 Mtr Long ST /8.5 /9/11/13 Mtr.PCC Pole
316/25 KVA Transformer16/25 KVA Transformer
463/100 KVA Transformer63/100 KVA Transformer
5250 KVA Transformer250 KVA Transformer
611 KV XLPE Cable size 3x70/3x120 sq.mm.11 KV XLPE Cable size 3x70/3x120 sq.mm.
711 KV XLPE Cable size 3x185/3x300 sq.mm.11 KV XLPE Cable size 3x185/3x300 sq.mm.
8ABC LT Cable 3x50/70/95/120/2x12/2x16 Sqmm.ABC LT Cable 3x50/70/95/120/2x12/2x16 Sqmm.
9Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at Asfabad, Firozabad to the site of work including loading and unloading of material at both ends.Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at Asfabad, Firozabad to the site of work including loading and unloading of material at both ends.
1011 KV VCB11 KV VCB
11Supply Of Following MaterialSupply Of Following Material
12Nut BoltNut Bolt
13ClampClamp
14Danger Board and Number PlateDanger Board and Number Plate
15Barbed wireBarbed wire
16Belting Angle for Transformer per DPBelting Angle for Transformer per DP
17Erection of single pole structure 9/11 Mtrs on ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms.Erection of single pole structure 9/11 Mtrs on ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
18Erection of Double pole structure 9/11 Mtrs on ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms.Erection of Double pole structure 9/11 Mtrs on ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
19Installation of stay set with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works.Installation of stay set with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works.
20Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.
21Suppy and erection of LT Clamp for PCC/STPSuppy and erection of LT Clamp for PCC/STP
22Laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per RESPO norms.Laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per RESPO norms.
23ACSR Weasel ConductorACSR Weasel Conductor
24ACSR Dog ConductorACSR Dog Conductor
25ABC LT Cable 3x50/70/95/120/2x12/2x16 Sqmm.ABC LT Cable 3x50/70/95/120/2x12/2x16 Sqmm.
26LT PVC CableLT PVC Cable
27Digging, laying and back filling of Various 11 kv XLPE cable as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of brick, sand, labour and T&P etc. required for proper completion of the work.Digging, laying and back filling of Various 11 kv XLPE cable as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of brick, sand, labour and T&P etc. required for proper completion of the work.
2811 KV XLPE Cable size 3x70/3x120 sq.mm.11 KV XLPE Cable size 3x70/3x120 sq.mm.
2911 KV XLPE Cable size 3x185/3x300 sq.mm.11 KV XLPE Cable size 3x185/3x300 sq.mm.
30Supply & Filing of cable box as suitable size as per direction of supervising engineer.Supply & Filing of cable box as suitable size as per direction of supervising engineer.
3111 KV O/D Cable Box 3x70/3x120 sq.mm.11 KV O/D Cable Box 3x70/3x120 sq.mm.
3211 KV O/D Cable Box 3x185/3x300 sq.mm.11 KV O/D Cable Box 3x185/3x300 sq.mm.
33Chemical Earthing of DT TF (63/100/250)Chemical Earthing of DT TF (63/100/250)
34Chopping of Tree branches for clearance of lineChopping of Tree branches for clearance of line
35Mounting of 16/25 KVA Transformer on the Double pole/Plinth structures and connections thereof.Mounting of 16/25 KVA Transformer on the Double pole/Plinth structures and connections thereof.
36Mounting of 63/100 KVA Transformer on the Double pole/Plinth structures and connections thereof.Mounting of 63/100 KVA Transformer on the Double pole/Plinth structures and connections thereof.
37Mounting of 250 KVA Transformer on the Double pole/Plinth structures and connections thereof.Mounting of 250 KVA Transformer on the Double pole/Plinth structures and connections thereof.
38Cutting of CC Road for making depth foundation for erection of pole.Cutting of CC Road for making depth foundation for erection of pole.
39Erection of 11 KV VCB Including all fitting and arrangementsErection of 11 KV VCB Including all fitting and arrangements
40Installation of 33/11 KV CT/PT Combined metering unit on existing double pole structure of large & heavy, power consumers to avoid possibility of theft of energy & 33/11 KV feeders at 33/11 KV sub- station including the cost of accessories (Nut & Bolt, PVC Tape etc.) required for proper completion of work also provided by the contractor. (including carriage of New 11 KV CT/PT combined metering unit from Store Center Asfabad, Firozabad to Site of work.)Installation of 33/11 KV CT/PT Combined metering unit on existing double pole structure of large & heavy, power consumers to avoid possibility of theft of energy & 33/11 KV feeders at 33/11 KV sub- station including the cost of accessories (Nut & Bolt, PVC Tape etc.) required for proper completion of work also provided by the contractor. (including carriage of New 11 KV CT/PT combined metering unit from Store Center Asfabad, Firozabad to Site of work.)
41Fixing of meter pilfer box (service connection meter holding capacity) including its carriage from Electricity Store Centre Asfabad, Firozabad to site of work including grouting of meter pillar box in ratio 1:4:8 cement, sand and brick ballast as per standard norms.Fixing of meter pilfer box (service connection meter holding capacity) including its carriage from Electricity Store Centre Asfabad, Firozabad to site of work including grouting of meter pillar box in ratio 1:4:8 cement, sand and brick ballast as per standard norms.
42Grouting and muffing of ST/PCC Pole including fixing of HT fittings as per RESPO norms. The support shall be grouted in cement, sand, and brick ballast in ratio 1:2:4.Grouting and muffing of ST/PCC Pole including fixing of HT fittings as per RESPO norms. The support shall be grouted in cement, sand, and brick ballast in ratio 1:2:4.
43Guarding of 11 KV line as per RESPO manual and as per direction of supervising engineerGuarding of 11 KV line as per RESPO manual and as per direction of supervising engineer
44Dismantle of all old excisting assesories where as it is required & Carriage to Centre store Asfabad 0-20 kmDismantle of all old excisting assesories where as it is required & Carriage to Centre store Asfabad 0-20 km

AI Tender Summary

OUR REF NO 56878063
AUTHORITY Government Departments
TENDER VALUE 9.50 Lakhs
LAST DATE 21-08-2026
Authority
Authority Name Uttar Pradesh Power Corporation Limited
Work Description Bids Are invited for Custom Bid For Services - For The Various Works To Give Electric Connection In Full Deposit Scheme At 11 Substations Under The Jurisdiction Of Electricity Urban Distribution Circle, Firozabad - Safety Cartage Of The Following Material From Centre Stores Asfabad, Firozabad To The Work Site In Firozabad Town Including Loading And Unloading At The Respective Ends. [Distance 00.00 Km To 25.00 Km] , 9/11/13 Mtr Long St /8.5 /9/11/13 Mtr.Pcc Pole , 16/25 Kva Transformer , 63/100 Kva Transformer , 250 Kva Transformer , 11 Kv Xlpe Cable Size 3X70/3X120 Sq.Mm. , 11 Kv Xlpe Cable Size 3X185/3X300 Sq.Mm. , Abc Lt Cable 3X50/70/95/120/2X12/2X16 Sqmm. , Line Material I.E. Conductor, G.I. Wire Tpmo Stay Rod, Disc Insulator, Cross Arm, Angle Channel And Other Required Material From Store Center At Asfabad, Firozabad To The Site Of Work Including Loading And Unloading Of Material At Both Ends. , 11 Kv Vcb , Supply Of Following Material , Nut Bolt , Cl , Danger Board And Number Plate , Barbed Wire , Belting Angle For Transformer Per Dp , Erection Of Single Pole Structure 9/11 Mtrs On St Pole By Digging Of Pits Fitting Of All Relevant Accessories As Per Respo Norms. , Erection Of Double Pole Structure 9/11 Mtrs On St Pole By Digging Of Pits Fitting Of All Relevant Accessories As Per Respo Norms. , Installation Of Stay Set With Grouting And Nuzzling Etc. As Per Respo Drawing Along With All Routine Material To Be Used For Such Works. , Earthing Of Poles By Fixing Earthing Rods And Binding With Earth Wire As Per Standard Norms Including Cost Of Labour T&P And Required Material For Such Work. , Suppy And Erection Of Lt Cl For Pcc/Stp , Laying, Stringing, Sagging, Binding And Jumpering Etc Of Following Conductor On The Erected Supports, As Per Respo Norms. , Acsr Weasel Conductor , Acsr Dog Conductor , Abc Lt Cable 3X50/70/95/120/2X12/2X16 Sqmm. , Lt Pvc Cable , Digging, Laying And Back Filling Of Various 11 Kv Xlpe Cable As Per Respo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Brick, Sand, Labour And T&P Etc. Required For Proper Completion Of The Work. , 11 Kv Xlpe Cable Size 3X70/3X120 Sq.Mm. , 11 Kv Xlpe Cable Size 3X185/3X300 Sq.Mm. , Supply & Filing Of Cable Box As Suitable Size As Per Direction Of Supervising Engineer. , 11 Kv O/D Cable Box 3X70/3X120 Sq.Mm. , 11 Kv O/D Cable Box 3X185/3X300 Sq.Mm. , Chemical Earthing Of Dt Tf (63/100/250) , Chopping Of Tree Branches For Clearance Of Line , Mounting Of 16/25 Kva Transformer On The Double Pole/Plinth Structures And Connections Thereof. , Mounting Of 63/100 Kva Transformer On The Double Pole/Plinth Structures And Connections Thereof. , Mounting Of 250 Kva Transformer On The Double Pole/Plinth Structures And Connections Thereof. , Cutting Of Cc Road For Making Depth Foundation For Erection Of Pole. , Erection Of 11 Kv Vcb Including All Fitting And Arrangements , Installation Of 33/11 Kv Ct/Pt Combined Metering Unit On Existing Double Pole Structure Of Large & Heavy, Power Consumers To Avoid Possibility Of Theft Of Energy & 33/11 Kv Feeders At 33/11 Kv Sub- Station Including The Cost Of Accessories (Nut & Bolt, Pvc Tape Etc.) Required For Proper Completion Of Work Also Provided By The Contractor. (Including Carriage Of New 11 Kv Ct/Pt Combined Metering Unit From Store Center Asfabad, Firozabad To Site Of Work.) , Fixing Of Meter Pilfer Box (Service Connection Meter Holding Capacity) Including Its Carriage From Electricity Store Centre Asfabad, Firozabad To Site Of Work Including Grouting Of Meter Pillar Box In Ratio 1:4:8 Cement, Sand And Brick Ballast As Per Standard Norms. , Grouting And Muffing Of St/Pcc Pole Including Fixing Of Ht Fittings As Per Respo Norms. The Support Shall Be Grouted In Cement, Sand, And Brick Ballast In Ratio 1:2:4. , Guarding Of 11 Kv Line As Per Respo Manual And As Per Direction Of Supervising Engineer , Dismantle Of All Old Excisting Assesories Where As It Is Required & Carriage To Centre Store Asfabad 0-20 Km
Basic Detail
Tender No GEM/2026/B/7885434
Bidding Type Tender
Location
City Firozabad
State Uttar Pradesh
Key Dates
Publish Date 06 Aug 2026
Submission Date 21 Aug 2026
Open Date 21 Aug 2026
Finance
Tender Value 9.50 Lakhs
Tender Fee Ref. Documents
EMD 9500
Exemption Not Available
Document List
4b2e2a55-361b-476c-8546-100d087f77bb.pdf
1786012268.xlsx
1786012275.pdf
1786012277.pdf
1786012281.pdf
1786012285.pdf
1786012287.pdf
1786012358.pdf
1786012381.pdf
T15ATC_2ea9ef2d-06be-415c-95ca1786012897958_BUYEREUDCFIROZABAD.pdf
T15ATC_b45a369a-23f5-43d3-a8071786012911885_BUYEREUDCFIROZABAD.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 06, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 21, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 6 days
Aug 21, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 6 days

Tender Documents

Download All (ZIP) ↓
pdf

4b2e2a55-361b-476c-8546-100d087f77bb.pdf

xlsx

1786012268.xlsx

pdf

1786012275.pdf

pdf

1786012277.pdf

pdf

1786012281.pdf

pdf

1786012285.pdf

pdf

1786012287.pdf

pdf

1786012358.pdf

pdf

1786012381.pdf

pdf

T15ATC_2ea9ef2d-06be-415c-95ca1786012897958_BUYEREUDCFIROZABAD.pdf

pdf

T15ATC_b45a369a-23f5-43d3-a8071786012911885_BUYEREUDCFIROZABAD.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders