Bids Are invited for Custom Bid For Services - For The Various Works To Give Electric Connection In Full Deposit Scheme At 11 Substations Under The Jurisdiction Of Electricity Urban Distribution Circle, Firozabad - Safety Cartage Of The Following Mat
Tender Overview
Project Description
Bids Are invited for Custom Bid For Services - For The Various Works To Give Electric Connection In Full Deposit Scheme At 11 Substations Under The Jurisdiction Of Electricity Urban Distribution Circle, Firozabad - Safety Cartage Of The Following Material From Centre Stores Asfabad, Firozabad To The Work Site In Firozabad Town Including Loading And Unloading At The Respective Ends. [Distance 00.00 Km To 25.00 Km] , 9/11/13 Mtr Long St /8.5 /9/11/13 Mtr.Pcc Pole , 16/25 Kva Transformer , 63/100 Kva Transformer , 250 Kva Transformer , 11 Kv Xlpe Cable Size 3X70/3X120 Sq.Mm. , 11 Kv Xlpe Cable Size 3X185/3X300 Sq.Mm. , Abc Lt Cable 3X50/70/95/120/2X12/2X16 Sqmm. , Line Material I.E. Conductor, G.I. Wire Tpmo Stay Rod, Disc Insulator, Cross Arm, Angle Channel And Other Required Material From Store Center At Asfabad, Firozabad To The Site Of Work Including Loading And Unloading Of Material At Both Ends. , 11 Kv Vcb , Supply Of Following Material , Nut Bolt , Cl , Danger Board And Number Plate , Barbed Wire , Belting Angle For Transformer Per Dp , Erection Of Single Pole Structure 9/11 Mtrs On St Pole By Digging Of Pits Fitting Of All Relevant Accessories As Per Respo Norms. , Erection Of Double Pole Structure 9/11 Mtrs On St Pole By Digging Of Pits Fitting Of All Relevant Accessories As Per Respo Norms. , Installation Of Stay Set With Grouting And Nuzzling Etc. As Per Respo Drawing Along With All Routine Material To Be Used For Such Works. , Earthing Of Poles By Fixing Earthing Rods And Binding With Earth Wire As Per Standard Norms Including Cost Of Labour T&P And Required Material For Such Work. , Suppy And Erection Of Lt Cl For Pcc/Stp , Laying, Stringing, Sagging, Binding And Jumpering Etc Of Following Conductor On The Erected Supports, As Per Respo Norms. , Acsr Weasel Conductor , Acsr Dog Conductor , Abc Lt Cable 3X50/70/95/120/2X12/2X16 Sqmm. , Lt Pvc Cable , Digging, Laying And Back Filling Of Various 11 Kv Xlpe Cable As Per Respo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Brick, Sand, Labour And T&P Etc. Required For Proper Completion Of The Work. , 11 Kv Xlpe Cable Size 3X70/3X120 Sq.Mm. , 11 Kv Xlpe Cable Size 3X185/3X300 Sq.Mm. , Supply & Filing Of Cable Box As Suitable Size As Per Direction Of Supervising Engineer. , 11 Kv O/D Cable Box 3X70/3X120 Sq.Mm. , 11 Kv O/D Cable Box 3X185/3X300 Sq.Mm. , Chemical Earthing Of Dt Tf (63/100/250) , Chopping Of Tree Branches For Clearance Of Line , Mounting Of 16/25 Kva Transformer On The Double Pole/Plinth Structures And Connections Thereof. , Mounting Of 63/100 Kva Transformer On The Double Pole/Plinth Structures And Connections Thereof. , Mounting Of 250 Kva Transformer On The Double Pole/Plinth Structures And Connections Thereof. , Cutting Of Cc Road For Making Depth Foundation For Erection Of Pole. , Erection Of 11 Kv Vcb Including All Fitting And Arrangements , Installation Of 33/11 Kv Ct/Pt Combined Metering Unit On Existing Double Pole Structure Of Large & Heavy, Power Consumers To Avoid Possibility Of Theft Of Energy & 33/11 Kv Feeders At 33/11 Kv Sub- Station Including The Cost Of Accessories (Nut & Bolt, Pvc Tape Etc.) Required For Proper Completion Of Work Also Provided By The Contractor. (Including Carriage Of New 11 Kv Ct/Pt Combined Metering Unit From Store Center Asfabad, Firozabad To Site Of Work.) , Fixing Of Meter Pilfer Box (Service Connection Meter Holding Capacity) Including Its Carriage From Electricity Store Centre Asfabad, Firozabad To Site Of Work Including Grouting Of Meter Pillar Box In Ratio 1:4:8 Cement, Sand And Brick Ballast As Per Standard Norms. , Grouting And Muffing Of St/Pcc Pole Including Fixing Of Ht Fittings As Per Respo Norms. The Support Shall Be Grouted In Cement, Sand, And Brick Ballast In Ratio 1:2:4. , Guarding Of 11 Kv Line As Per Respo Manual And As Per Direction Of Supervising Engineer , Dismantle Of All Old Excisting Assesories Where As It Is Required & Carriage To Centre Store Asfabad 0-20 Km
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Safety Cartage of the following material from Centre Stores Asfabad, Firozabad to the work site in Firozabad Town including loading and unloading at the respective ends. [Distance 00.00 Km to 25.00 Km] | Safety Cartage of the following material from Centre Stores Asfabad, Firozabad to the work site in Firozabad Town including loading and unloading at the respective ends. [Distance 00.00 Km to 25.00 Km] |
| 2 | 9/11/13 Mtr Long ST /8.5 /9/11/13 Mtr.PCC Pole | 9/11/13 Mtr Long ST /8.5 /9/11/13 Mtr.PCC Pole |
| 3 | 16/25 KVA Transformer | 16/25 KVA Transformer |
| 4 | 63/100 KVA Transformer | 63/100 KVA Transformer |
| 5 | 250 KVA Transformer | 250 KVA Transformer |
| 6 | 11 KV XLPE Cable size 3x70/3x120 sq.mm. | 11 KV XLPE Cable size 3x70/3x120 sq.mm. |
| 7 | 11 KV XLPE Cable size 3x185/3x300 sq.mm. | 11 KV XLPE Cable size 3x185/3x300 sq.mm. |
| 8 | ABC LT Cable 3x50/70/95/120/2x12/2x16 Sqmm. | ABC LT Cable 3x50/70/95/120/2x12/2x16 Sqmm. |
| 9 | Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at Asfabad, Firozabad to the site of work including loading and unloading of material at both ends. | Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at Asfabad, Firozabad to the site of work including loading and unloading of material at both ends. |
| 10 | 11 KV VCB | 11 KV VCB |
| 11 | Supply Of Following Material | Supply Of Following Material |
| 12 | Nut Bolt | Nut Bolt |
| 13 | Clamp | Clamp |
| 14 | Danger Board and Number Plate | Danger Board and Number Plate |
| 15 | Barbed wire | Barbed wire |
| 16 | Belting Angle for Transformer per DP | Belting Angle for Transformer per DP |
| 17 | Erection of single pole structure 9/11 Mtrs on ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms. | Erection of single pole structure 9/11 Mtrs on ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms. |
| 18 | Erection of Double pole structure 9/11 Mtrs on ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms. | Erection of Double pole structure 9/11 Mtrs on ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms. |
| 19 | Installation of stay set with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works. | Installation of stay set with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works. |
| 20 | Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work. | Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work. |
| 21 | Suppy and erection of LT Clamp for PCC/STP | Suppy and erection of LT Clamp for PCC/STP |
| 22 | Laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per RESPO norms. | Laying, stringing, sagging, binding and jumpering etc of following conductor on the erected supports, as per RESPO norms. |
| 23 | ACSR Weasel Conductor | ACSR Weasel Conductor |
| 24 | ACSR Dog Conductor | ACSR Dog Conductor |
| 25 | ABC LT Cable 3x50/70/95/120/2x12/2x16 Sqmm. | ABC LT Cable 3x50/70/95/120/2x12/2x16 Sqmm. |
| 26 | LT PVC Cable | LT PVC Cable |
| 27 | Digging, laying and back filling of Various 11 kv XLPE cable as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of brick, sand, labour and T&P etc. required for proper completion of the work. | Digging, laying and back filling of Various 11 kv XLPE cable as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of brick, sand, labour and T&P etc. required for proper completion of the work. |
| 28 | 11 KV XLPE Cable size 3x70/3x120 sq.mm. | 11 KV XLPE Cable size 3x70/3x120 sq.mm. |
| 29 | 11 KV XLPE Cable size 3x185/3x300 sq.mm. | 11 KV XLPE Cable size 3x185/3x300 sq.mm. |
| 30 | Supply & Filing of cable box as suitable size as per direction of supervising engineer. | Supply & Filing of cable box as suitable size as per direction of supervising engineer. |
| 31 | 11 KV O/D Cable Box 3x70/3x120 sq.mm. | 11 KV O/D Cable Box 3x70/3x120 sq.mm. |
| 32 | 11 KV O/D Cable Box 3x185/3x300 sq.mm. | 11 KV O/D Cable Box 3x185/3x300 sq.mm. |
| 33 | Chemical Earthing of DT TF (63/100/250) | Chemical Earthing of DT TF (63/100/250) |
| 34 | Chopping of Tree branches for clearance of line | Chopping of Tree branches for clearance of line |
| 35 | Mounting of 16/25 KVA Transformer on the Double pole/Plinth structures and connections thereof. | Mounting of 16/25 KVA Transformer on the Double pole/Plinth structures and connections thereof. |
| 36 | Mounting of 63/100 KVA Transformer on the Double pole/Plinth structures and connections thereof. | Mounting of 63/100 KVA Transformer on the Double pole/Plinth structures and connections thereof. |
| 37 | Mounting of 250 KVA Transformer on the Double pole/Plinth structures and connections thereof. | Mounting of 250 KVA Transformer on the Double pole/Plinth structures and connections thereof. |
| 38 | Cutting of CC Road for making depth foundation for erection of pole. | Cutting of CC Road for making depth foundation for erection of pole. |
| 39 | Erection of 11 KV VCB Including all fitting and arrangements | Erection of 11 KV VCB Including all fitting and arrangements |
| 40 | Installation of 33/11 KV CT/PT Combined metering unit on existing double pole structure of large & heavy, power consumers to avoid possibility of theft of energy & 33/11 KV feeders at 33/11 KV sub- station including the cost of accessories (Nut & Bolt, PVC Tape etc.) required for proper completion of work also provided by the contractor. (including carriage of New 11 KV CT/PT combined metering unit from Store Center Asfabad, Firozabad to Site of work.) | Installation of 33/11 KV CT/PT Combined metering unit on existing double pole structure of large & heavy, power consumers to avoid possibility of theft of energy & 33/11 KV feeders at 33/11 KV sub- station including the cost of accessories (Nut & Bolt, PVC Tape etc.) required for proper completion of work also provided by the contractor. (including carriage of New 11 KV CT/PT combined metering unit from Store Center Asfabad, Firozabad to Site of work.) |
| 41 | Fixing of meter pilfer box (service connection meter holding capacity) including its carriage from Electricity Store Centre Asfabad, Firozabad to site of work including grouting of meter pillar box in ratio 1:4:8 cement, sand and brick ballast as per standard norms. | Fixing of meter pilfer box (service connection meter holding capacity) including its carriage from Electricity Store Centre Asfabad, Firozabad to site of work including grouting of meter pillar box in ratio 1:4:8 cement, sand and brick ballast as per standard norms. |
| 42 | Grouting and muffing of ST/PCC Pole including fixing of HT fittings as per RESPO norms. The support shall be grouted in cement, sand, and brick ballast in ratio 1:2:4. | Grouting and muffing of ST/PCC Pole including fixing of HT fittings as per RESPO norms. The support shall be grouted in cement, sand, and brick ballast in ratio 1:2:4. |
| 43 | Guarding of 11 KV line as per RESPO manual and as per direction of supervising engineer | Guarding of 11 KV line as per RESPO manual and as per direction of supervising engineer |
| 44 | Dismantle of all old excisting assesories where as it is required & Carriage to Centre store Asfabad 0-20 km | Dismantle of all old excisting assesories where as it is required & Carriage to Centre store Asfabad 0-20 km |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender