Tender For Extension Of Overhead Shade For Swf Pumps Unit At Joka Dps Under Grbu.
Tender Value
2.03 Lakhs
Estimated cost
Bid Submission
17 Aug 2026
1 days left
EMD
4200
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kolkata → West Bengal
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Extension Of Overhead Shade For Swf Pumps Unit At Joka Dps Under Grbu.
BOQ
| Sl. No. | Item Description |
| 1 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS,GRILLS,GATESETC. A.ORIGINAL WORKS 1 MS. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, sections conforming to IS: 226, IS: & SP 1964 connected to one another with bracket, gussets. cleats as per design. direction of Engineer-In charge complete Including cutting to requisite shape and with bolting, metal arc welding to IS, 816- & IS; 1995 of approved make and brand to IS:814- 2004. haulage. hoisting and erection a\\" complete. The rate includes the cost of rolled Steel section, as gas and hire of all tools and plants and labor required tor the work including all incident charges such as electricity charges. labour insurance etc. payment to be on the basis Of calculated Of structural members only in finished work as per IS specified weight Payment for gusset, bracket, cleat. rivets, bolts and nuts may be make by adding the actual weight of such item With weight Of finished structural members or 7% of weight for finished structural members weight not less than 22.5 Kg/ m. or 15 % of weight for finished Structural members less than 22.5 Kg / m may allow for bracket, cleat, rivet, bolts etc, no separate payment being made for these items. as per direction of Engineer In Charge , The rate are considered for a height Of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m beyond 8m. or part thereof ) For Structural members specified sections weighing less than 22.5KG/M |
| 2 | BUILDING WORKS (E) ROOFING, SHEET WALLING &WATERPROOF TREATMENT A. ROOFING & SHEETWALLING 9. iron Sheet work frame work) fitted and fixed with IO mm. dia. J or L hook-bolts, limpet and bitumen washers and putty complete with 150mm end lap and one corrugation Side lap. to be made on area of finished sheet to be supplied by contractor In Roof— c With 0.80 mm Y-thick sheet |
| 3 | SECTION 1. BUILDING WORKS (K) PAINTING, VERNISHINC ETC A ORIGINAL WORKS 1 (a) priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand pawing etc (This item is to new or Old When the surface has been exposed by removal of old paint |
| 4 | BUILDING WORKS (K) PAINTING. VERNISHING ORIGINAL Painting with best quality synthetic enamel paint Of approved make and brand including by sand paper etc. including using of approved putty etc. on the surface. if necessary On steel or other metal surface With super gloss-( iV) TWO coats with a Shade except white). |
| 5 | BUILDING WORKS ( C ) Brickworks, concrete Works etc CONCRETE WORKS 3. Making one Set Of scaffolding only for replacing glass panels. painting. uprooting plant and another repairing works of building and works for works only with 10 cm. dia bamboo post at the rate Of 1 meter Centre to Centre and 7.5 cm. dia bamboo ties @ O. 75 meter apart fitting and fixing with necessary coir, nails etc as per direction of the Engineer-in charge (This item Should be executed only after prior approval Of the Engineer-in charge). Firstly one number to be and then labor rate for shifting up to further nineteenth (19) times @ 10% each tune to be If necessary further aner twenty times total use, another one number new and labour rate for shifting to be considered accordingly b. Extra for additional 3.6 height or part thereof. |
| 6 | MATERIALS AND LABOUR Building (B) Labour Rates Per Diem : 3)Mazdoor (Male0) Note: (l)The above rates Of are Of Contractors and I % Labour welfare cess which be admissible the Contractors. but contractual percentage Will not be applicable (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages |
| 7 | MATERIALS AND LABOUR Building (B) Labour Rates Per Diem : 24) Welder.Note: (l) The above rates Of are Of Contractors and I % Labour welfare cess which be admissible the Contractors. but contractual percentage Will not be applicable (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. |
| 8 | Sub Total |
| 9 | GST 18% |
| 10 | CESS 1% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Aug 06, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 17, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayAug 20, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender