Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - As Per Atc; As Per Atc; As Per Atc - Earth Work In Excavation In Foundation In Ordinary Soil Including Lifting Etc. With Back Filling Of Excavation.
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - As Per Atc; As Per Atc; As Per Atc - Earth Work In Excavation In Foundation In Ordinary Soil Including Lifting Etc. With Back Filling Of Excavation. , C.C. In Foundation Of Ratio 1:4:8 With Cement Coarse Sand And 40 Mm Brick Blast For Proper Completion Of The Work Including All Labour, T & P , Material And Cement For Proper Completion Of The Work. , First Class Brick Work In Ratio 1:2:4 With Cement & Fine Sand Mortar Using First Class Brick Including Labour , T & P For Proper Completion Of The Work. , 12 Mm Thick Cement Plaster Outside/Inside Of Four Revetment Wall In Ratio 1:4 With Cement And Fines And Mortar Including Labour, T & P,Material And Cement For Completion Of The Work. , Filling Of Earth Under The Floor Including Cost Of Earth When Obtained From Outside The Corporation Area For Proper Completion Of The Work. , First Class Brick Work Soiling Of Flooring Which Including Laying Of Brick Flate Edges, Filling Of Sand Between The Joints Including Preparation Of Base Read For Soiling Including Cost Of Material , Labour And T & P For Proper Completion Of The Work. , Earthing And Grouting Arrangements With Pipe Type Grouting Cost Of All Material For Satisfactory Completion Of The Work.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Earth Work in excavation in foundation in ordinary soil including lifting etc. with back filling of excavation. | Earth Work in excavation in foundation in ordinary soil including lifting etc. with back filling of excavation. |
| 2 | C.C. in foundation of ratio 1:4:8 with cement coarse sand and 40 mm brick blast for proper completion of the work including all labour, T & P , material and cement for proper completion of the work. | C.C. in foundation of ratio 1:4:8 with cement coarse sand and 40 mm brick blast for proper completion of the work including all labour, T & P , material and cement for proper completion of the work. |
| 3 | First class brick work in ratio 1:2:4 with cement & fine sand mortar using first class brick including labour , T & P for proper completion of the work. | First class brick work in ratio 1:2:4 with cement & fine sand mortar using first class brick including labour , T & P for proper completion of the work. |
| 4 | 12 mm thick cement plaster outside/inside of four revetment wall in ratio 1:4 with cement and fines and mortar including labour, T & p,material and cement for completion of the work. | 12 mm thick cement plaster outside/inside of four revetment wall in ratio 1:4 with cement and fines and mortar including labour, T & p,material and cement for completion of the work. |
| 5 | Filling of earth under the floor including cost of earth when obtained from outside the corporation area for proper completion of the work. | Filling of earth under the floor including cost of earth when obtained from outside the corporation area for proper completion of the work. |
| 6 | First class brick work soiling of flooring which including laying of brick flate edges, filling of sand between the joints including preparation of base read for soiling including cost of material , labour and T & P for proper completion of the work. | First class brick work soiling of flooring which including laying of brick flate edges, filling of sand between the joints including preparation of base read for soiling including cost of material , labour and T & P for proper completion of the work. |
| 7 | Earthing and grouting arrangements with pipe type grouting cost of all material for satisfactory completion of the work. | Earthing and grouting arrangements with pipe type grouting cost of all material for satisfactory completion of the work. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender