Tender For Construction Work Of Entrance Gate At Pathar Mandi, Baraut, Distt.: Baghpat
Tender Overview
Project Description
Tender for Construction Work Of Entrance Gate At Pathar Mandi, Baraut, Distt.: Baghpat
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 07-Aug-2026 | DATE EXT | Date | 11-Aug-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Civil Work |
| 2 | Site Clearence |
| 3 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil. (DSR 2023/2.28.1) |
| 4 | Demolishing brick work manually/ by mechanical means includingstacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. |
| 5 | Earth Work |
| 6 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.All kinds of soil (D.S.R.2023/2.6.1) |
| 7 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. (D.S.R.2023/2.27) |
| 8 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (D.S.R.2023/2.25) |
| 9 | Concrete work |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement :3 coarse sand: 6 graded stone aggregate 40mm nominal size). (D.S.R.2023/4.1.6) |
| 11 | R.C.C work |
| 12 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3(1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). (D.S.R.2023/5.1.2) |
| 13 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). (D.S.R.2023/5.2.2) |
| 14 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo Mechanically Treated bars. (D.S.R.2023/5.22.6) |
| 15 | Form work |
| 16 | Centering and shuttering including strutting, propping etc. and removal of form for : |
| 17 | Foundations, footings, bases of columns, etc. for mass concrete. (D.S.R.2023/5.9.1) |
| 18 | Columns, Pillars, Piers, Abutments, Posts and Struts. (D.S.R.2023/5.9.6) |
| 19 | Lintels, beams, plinth beams, girders, bressumers and cantilevers. with water proof ply 12 mm thick. (D.S.R.2023/5.9.21) |
| 20 | Arches, domes, vaults up to 6 m span (D.S.R.2023/5.9.9) |
| 21 | Extra for shuttering in circular work (20% of respective centering and shuttering items) (D.S.R.2023/5.9.14) |
| 22 | Extra for additional height in centering, shuttering where ever required with adequate bracing, propping etc., including cost of de-shuttering and decentering at all levels, over a height of 3.5 m, for every additional height of 1 metre or part thereof (Plan area to be measured). |
| 23 | Brick work |
| 24 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. Cement mortar 1:3 (1 cement :3 coarse sand (D.S.R.2023/ 6.13.1 ) |
| 25 | Finishing work |
| 26 | Supply & Installation of Stone Gate In Gwalior Stone , with stone thickness and design as per Engineer In Charge , cladded over RCC/Brick Surface with appropriate Adhesive/Mortar finished with Polish work to achieve the desired design |
| 27 | Add Electrification work |
| 28 | Contingency Charges Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 1 dayBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender