Power Boards / Undertakings / PSU Closing in 2 days TDR #56874201

Tender For Drawing 11Kv Covered Conductor From Palipuzha Transformer To Poovathussery At Electrical Section Annamanada

Issued by Boards / Undertakings / PSU · Thrissur, Kerala
Tender Value
9.17 Lakhs
Estimated cost
Bid Submission
14 Aug 2026
2 days left
EMD
23000
Bank guarantee accepted
Document Fee
2242
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Thrissur → Kerala
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Drawing 11Kv Covered Conductor From Palipuzha Transformer To Poovathussery At Electrical Section Annamanada

BOQ

Name of Work:- Drawing 11KV Covered Conductor from Palipuzha Transformer to Poovathussery at Electrical Section Annamanada
Sl. No. Item Description
1Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges.
2Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point.
3Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole including conveyance of materials.
4Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing).
5Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle).
6Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and ACSR Weasel for Neutral & Street Main, for one km LT 3ph 5 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place.
7Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle).
8Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm),0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides.
9Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing).
10Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil.
11Stringing of one km 3 PH 11kV line with XLPE Insulated ACSR Raccoon or equivalant (3 conductors) after fitting insulators, binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and removing tree branches wherever necessary excluding cut point works.
12Dismantling one suspension clamp from 11 KV ABC
13Dismantling one Anchor clamp /dead end clamp from 11 KV ABC
14Dismantling of 11 kV Aerial bunched cable XLPE insulated of size 3 x 120+ 1 x 95 sqmm with bare insulated Messenger
15Fitting Knee bracing or suitable support on existing HT or LT post.
16Erection of Anchor clamp / dead end clamp for 11kV ABC of any size
17Additional rate for providing one HT Pin with insulator, complete on any type of HT pole.
18Fiting One No MVT on existing cross arm excluding termination work (for One phase) of any rating for 11 kV AB Cable
19Dismantling One no MVT on existing cross arm (for One phase) of any rating for 11 kV AB Cable (Half rate of Key no. 27.1)
20Dismantling of Anchor clamp / dead end clamp for LT AB cable
21Erection of Anchor clamp / dead end clamp for LT ABC of any size
22Erection of suspension clamp for LT ABC of any size
23Dismantling of suspension clamp suitable for LT AB cable
24Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil.
25Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling.
26Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at standard distance (1.5m) away from the pole/structure in ordinary soil & backfilling the pit with 15cm alternate layer of charcoal, salt and sand up to 90cm from the bottom. including the cost of 20kg salt, 25kg charcoal, excluding supply of earth pipe.
27Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling.
28Providing one Driven Earth using GI earth pipe of size38.1mm dia, 2.5m length at minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in loose soil.
29Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same.
30Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same.
31Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same.
32Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same.
33Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly.
34Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly.
35Dismantling (without damage) one km LT additional conductor line by dismantling cross arms, insulators and stacking the conductors in rolls properly.
36Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and Neutral, for one km LT single phase 2 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place.
37Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase & Neutral and ACSR Weasel for street main, for one km LT single phase 3 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place.
38Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and ACSR Weasel for Neutral, for one km LT three phase 4 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place.
39Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires.
40Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work.
41Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work.
42Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt & nut etc.
43Dismantling one section fuse from structure and bringing back to section store.
44Shifting one No. single phase service connection metering equipment with all fittings including lowering down the WP service wire, dismantling Meter Board without making damage and refitting the same at new location and redoing the WP service wire with all fittings.
45Stringing of one km 11kV line with ACSR Raccoon (3 conductors) after fitting insulators and giving jumper connections including cutting and removing tree branches wherever necessary excluding cut point works.
46Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials.
47Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle).
48Dismantling of 1.1 kV Aerial bunched cable of size 3 x 70+ 1 x 16 (Street Light) + 1 x50 Sq.mm. (Insulated Messenger)
49Stringing of 1.1 kV Aerial bunched cable of size 3 x 70+ 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles
50Dismantling (without damage) one HT PSC/RCC Strut pole including removal of clamps and stacking.
51Dismantling one damaged HT PSC/RCC Strut pole including removal of clamps and stacking.
52Dismantling one damaged LT PSC/RCC Strut pole including removal of clamps and stacking.
53Dismantling (without damage) one LT PSC/RCC Strut pole including removal of clamps and stacking.
54Dismantling (without damage) LT stay including digging pit in all classes of soil and backfilling.
55Dismantling (without damage) one HT stay including digging pit in all classes of soil and backfilling, and bringing back to section store.
56Providing additional HT stay on existing stay rod for Making “V” stay.
57Providing additional HT stay insulator in existing stay.
58Providing WP support with PSC pole including digging & back filling pit in ordinary soil. excluding transportation of poles
59Insertion of one LT PSC pole in existing single phase OH line including digging & back filling pit in ordinary soil, fitting cross arm, insulator, binding etc. excluding transportation of poles.
60Insertion of one LT PSC pole in existing three phase OH line including digging & back filling pit in ordinary soil, fitting cross arm, insulator, binding etc. excluding transportation of poles.
61Fitting and providing one Strut using A type pole, including digging and back filling pit in ordinary soil.
62Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing.
63Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials.
64Drilling hole of various sizes on existing Channel/Cross Arm.
65Dismantling (without damage) one AB switch from existing structure and bringing back to section store.
66Dismantling (without damage) one V cross arm/Channel cross arm from existing Pole and bringing back to section store.
67Dismantling (without damage) one Channel cross arm from existing DP structure and bringing back to section store.
68Fitting and erecting one HT Double Pole Structure using A type pole in position including fitting 2 No. channel cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56874201
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 9.17 Lakhs
LAST DATE 14-08-2026
Authority
Authority Name Kerala State Electricity Board
Work Description Tender for Drawing 11Kv Covered Conductor From Palipuzha Transformer To Poovathussery At Electrical Section Annamanada
Basic Detail
Tender No TENDER/2026-27/5154/81 dt.05.08.2026
Bidding Type Tender
Location
City Thrissur
State Kerala
Key Dates
Publish Date 06 Aug 2026
Submission Date 14 Aug 2026
Open Date 17 Aug 2026
Finance
Tender Value 9.17 Lakhs
Tender Fee 2242
EMD 23000
Exemption Not Available
Document List
335ca9f3-df06-4c78-8e83-dd7334a70bf4.html
Bid_Form_and_Questionnair_1.pdf
BOQ_1462704.xls
GCC.pdf
Tendernotice_1 (11).pdf
Tender_Documents_ANNAMANA_2.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 06, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 14, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 2 days
Aug 17, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 5 days

Tender Documents

Download All (ZIP) ↓
html

335ca9f3-df06-4c78-8e83-dd7334a70bf4.html

pdf

Bid_Form_and_Questionnair_1.pdf

xls

BOQ_1462704.xls

pdf

GCC.pdf

pdf

Tendernotice_1 (11).pdf

pdf

Tender_Documents_ANNAMANA_2.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders