Power Government Departments Closing in 8 days TDR #56871407

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - As Per Atc; As Per Atc; As Per Atc - Excavation Of Earth With The Help Of T&P And Labour, Watering And Ramming Of Excavated Earth. , Cement Concrete

Issued by Government Departments · Mathura, Uttar Pradesh
Tender Value
21.25 Lakhs
Estimated cost
Bid Submission
01 Sep 2026
8 days left
EMD
22000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Mathura → Uttar Pradesh
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - As Per Atc; As Per Atc; As Per Atc - Excavation Of Earth With The Help Of T&P And Labour, Watering And Ramming Of Excavated Earth. , Cement Concrete With 40 Mm Stone Blast, Coarse Sand And Cement Mortar In Ratio 1:4:8 In Foundation And Under Floor Including The Cost Of All Labour And Material Required T&P For Proper Completion Of Satisfactory Work , First Class Brick Work For Construction Of Retaining Wall In Ratio 1:4 With Cement And Fine Sand Including The Cost Of All Labour And Material Required T&P For Proper Completion Of Satisfactory Work , Cement Concrete In Plinth With 20Mm Stone Ballast , Coarse Sand And Cement Mortar In Ratio Of 1:2:4 Including The Cost Of All Labour And Material ,Required T&P For Proper Completion Of Work , 12 Mm Thick Plaster Work On Wall & Top With Cement And Sand In Ratio Of 1:4 Including The Cost Of All Labour And Material ,Required T&P For Proper Completion Of Work , Earth Filling Under The Floor In Area Between Tower Foundation And Retaining Wall In Including The Cost Of Soil To Be Obtained By The Contractor From Outside Including Waterning Ramming And Dressing Of Earth Etc Complete With The Cost Of Earth Royality, Taxes, Freight Etc With Cost Of Material Labour And T&P Etc For Proper Completion Of Work , First Class Brick Work On Edge Floor Laid Including Prepation Of Base To Proper Slope Including Supply Of All Material Labour And T&P Etc For Proper Completion Of Work , Tor Steel In Plain Work Such As Reinforced Concrete Or Reinforced Brick Work(When Not Included In All Over Rates )Wrought To Required Shape As Necessary Including Bending For Proper Completion Of Work And Including Supply Of Steel Its Wastage Bend ,Beam And Authorized Overlapping As Required For Proper Completion Of The Work. 12 Mm Midsteel Ring 8 Mm (Extra Bar)

BOQ

Sl. No. Item TitleItem Description
1Excavation of earth with the help of T&P and labour, watering and ramming of excavated earth.Excavation of earth with the help of T&P and labour, watering and ramming of excavated earth.
2Cement concrete with 40 mm stone blast, coarse sand and cement mortar in ratio 1:4:8 in foundation and under floor including the cost of all labour and material required T&P for proper completion of satisfactory workCement concrete with 40 mm stone blast, coarse sand and cement mortar in ratio 1:4:8 in foundation and under floor including the cost of all labour and material required T&P for proper completion of satisfactory work
3First class brick work for construction of retaining wall in ratio 1:4 with cement and fine sand including the cost of all labour and material required T&P for proper completion of satisfactory workFirst class brick work for construction of retaining wall in ratio 1:4 with cement and fine sand including the cost of all labour and material required T&P for proper completion of satisfactory work
4Cement concrete in plinth with 20mm stone ballast , coarse sand and cement mortar in ratio of 1:2:4 including the cost of all labour and material ,required T&P for proper completion of workCement concrete in plinth with 20mm stone ballast , coarse sand and cement mortar in ratio of 1:2:4 including the cost of all labour and material ,required T&P for proper completion of work
512 mm thick plaster work on wall & top with cement and sand in ratio of 1:4 including the cost of all labour and material ,required T&P for proper completion of work12 mm thick plaster work on wall & top with cement and sand in ratio of 1:4 including the cost of all labour and material ,required T&P for proper completion of work
6Earth filling under the floor in area between tower foundation and retaining wall in including the cost of soil to be obtained by the contractor from outside including waterning ramming and dressing of earth etc complete with the cost of earth royality, taxes, freight etc with cost of material labour and T&P etc for proper completion of workEarth filling under the floor in area between tower foundation and retaining wall in including the cost of soil to be obtained by the contractor from outside including waterning ramming and dressing of earth etc complete with the cost of earth royality, taxes, freight etc with cost of material labour and T&P etc for proper completion of work
7First class brick work on edge floor laid including prepation of base to proper slope including supply of all material labour and T&P etc for proper completion of workFirst class brick work on edge floor laid including prepation of base to proper slope including supply of all material labour and T&P etc for proper completion of work
8Tor steel in plain work such as reinforced concrete or reinforced brick work(when not included in all over rates )wrought to required shape as necessary including bending for proper completion of work and including supply of steel its wastage bend ,beam and authorized overlapping as required for proper completion of the work. 12 mm Midsteel ring 8 mm (Extra Bar)Tor steel in plain work such as reinforced concrete or reinforced brick work(when not included in all over rates )wrought to required shape as necessary including bending for proper completion of work and including supply of steel its wastage bend ,beam and authorized overlapping as required for proper completion of the work. 12 mm Midsteel ring 8 mm (Extra Bar)

AI Tender Summary

OUR REF NO 56871407
AUTHORITY Government Departments
TENDER VALUE 21.25 Lakhs
LAST DATE 01-09-2026
Authority
Authority Name Uttar Pradesh Power Corporation Limited
Work Description Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - As Per Atc; As Per Atc; As Per Atc - Excavation Of Earth With The Help Of T&P And Labour, Watering And Ramming Of Excavated Earth. , Cement Concrete With 40 Mm Stone Blast, Coarse Sand And Cement Mortar In Ratio 1:4:8 In Foundation And Under Floor Including The Cost Of All Labour And Material Required T&P For Proper Completion Of Satisfactory Work , First Class Brick Work For Construction Of Retaining Wall In Ratio 1:4 With Cement And Fine Sand Including The Cost Of All Labour And Material Required T&P For Proper Completion Of Satisfactory Work , Cement Concrete In Plinth With 20Mm Stone Ballast , Coarse Sand And Cement Mortar In Ratio Of 1:2:4 Including The Cost Of All Labour And Material ,Required T&P For Proper Completion Of Work , 12 Mm Thick Plaster Work On Wall & Top With Cement And Sand In Ratio Of 1:4 Including The Cost Of All Labour And Material ,Required T&P For Proper Completion Of Work , Earth Filling Under The Floor In Area Between Tower Foundation And Retaining Wall In Including The Cost Of Soil To Be Obtained By The Contractor From Outside Including Waterning Ramming And Dressing Of Earth Etc Complete With The Cost Of Earth Royality, Taxes, Freight Etc With Cost Of Material Labour And T&P Etc For Proper Completion Of Work , First Class Brick Work On Edge Floor Laid Including Prepation Of Base To Proper Slope Including Supply Of All Material Labour And T&P Etc For Proper Completion Of Work , Tor Steel In Plain Work Such As Reinforced Concrete Or Reinforced Brick Work(When Not Included In All Over Rates )Wrought To Required Shape As Necessary Including Bending For Proper Completion Of Work And Including Supply Of Steel Its Wastage Bend ,Beam And Authorized Overlapping As Required For Proper Completion Of The Work. 12 Mm Midsteel Ring 8 Mm (Extra Bar)
Basic Detail
Tender No GEM/2026/B/7884523
Bidding Type Tender
Location
City Mathura
State Uttar Pradesh
Key Dates
Publish Date 06 Aug 2026
Submission Date 01 Sep 2026
Open Date 01 Sep 2026
Finance
Tender Value 21.25 Lakhs
Tender Fee Ref. Documents
EMD 22000
Exemption Not Available
Document List
f850cf8f-e2b0-4079-bc25-564e89ba2d72.pdf
1786005362.xlsx
1786005401.pdf
1786005405.pdf
1786005407.pdf
1786005409.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 06, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 01, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 8 days
Sep 01, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 8 days

Tender Documents

Download All (ZIP) ↓
pdf

f850cf8f-e2b0-4079-bc25-564e89ba2d72.pdf

xlsx

1786005362.xlsx

pdf

1786005401.pdf

pdf

1786005405.pdf

pdf

1786005407.pdf

pdf

1786005409.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders