Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - As Per Atc; As Per Atc; As Per Atc - Excavation Of Earth With The Help Of T&P And Labour, Watering And Ramming Of Excavated Earth. , Cement Concrete
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - As Per Atc; As Per Atc; As Per Atc - Excavation Of Earth With The Help Of T&P And Labour, Watering And Ramming Of Excavated Earth. , Cement Concrete With 40 Mm Stone Blast, Coarse Sand And Cement Mortar In Ratio 1:4:8 In Foundation And Under Floor Including The Cost Of All Labour And Material Required T&P For Proper Completion Of Satisfactory Work , First Class Brick Work For Construction Of Retaining Wall In Ratio 1:4 With Cement And Fine Sand Including The Cost Of All Labour And Material Required T&P For Proper Completion Of Satisfactory Work , Cement Concrete In Plinth With 20Mm Stone Ballast , Coarse Sand And Cement Mortar In Ratio Of 1:2:4 Including The Cost Of All Labour And Material ,Required T&P For Proper Completion Of Work , 12 Mm Thick Plaster Work On Wall & Top With Cement And Sand In Ratio Of 1:4 Including The Cost Of All Labour And Material ,Required T&P For Proper Completion Of Work , Earth Filling Under The Floor In Area Between Tower Foundation And Retaining Wall In Including The Cost Of Soil To Be Obtained By The Contractor From Outside Including Watering Ramming And Dressing Of Earth Etc Complete With The Cost Of Earth Royalty, Taxes, Freight Etc With Cost Of Material Labour And T&P Etc For Proper Completion Of Work , First Class Brick Work On Edge Floor Laid Including Preparation Of Base To Proper Slope Including Supply Of All Material Labour And T&P Etc For Proper Completion Of Work , Tor Steel In Plain Work Such As Reinforced Concrete Or Reinforced Brick Work(When Not Included In All Over Rates )Wrought To Required Shape As Necessary Including Bending For Proper Completion Of Work And Including Supply Of Steel Its Wastage Bend ,Beam And Authorized Overlapping As Required For Proper Completion Of The Work. 12 Mm Midsteel Ring 8 Mm (Extra Bar)
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Excavation of earth with the help of T&P and labour, watering and ramming of excavated earth. | Excavation of earth with the help of T&P and labour, watering and ramming of excavated earth. |
| 2 | Cement concrete with 40 mm stone blast, coarse sand and cement mortar in ratio 1:4:8 in foundation and under floor including the cost of all labour and material required T&P for proper completion of satisfactory work | Cement concrete with 40 mm stone blast, coarse sand and cement mortar in ratio 1:4:8 in foundation and under floor including the cost of all labour and material required T&P for proper completion of satisfactory work |
| 3 | First class brick work for construction of retaining wall in ratio 1:4 with cement and fine sand including the cost of all labour and material required T&P for proper completion of satisfactory work | First class brick work for construction of retaining wall in ratio 1:4 with cement and fine sand including the cost of all labour and material required T&P for proper completion of satisfactory work |
| 4 | Cement concrete in plinth with 20mm stone ballast , coarse sand and cement mortar in ratio of 1:2:4 including the cost of all labour and material ,required T&P for proper completion of work | Cement concrete in plinth with 20mm stone ballast , coarse sand and cement mortar in ratio of 1:2:4 including the cost of all labour and material ,required T&P for proper completion of work |
| 5 | 12 mm thick plaster work on wall & top with cement and sand in ratio of 1:4 including the cost of all labour and material ,required T&P for proper completion of work | 12 mm thick plaster work on wall & top with cement and sand in ratio of 1:4 including the cost of all labour and material ,required T&P for proper completion of work |
| 6 | Earth filling under the floor in area between tower foundation and retaining wall in including the cost of soil to be obtained by the contractor from outside including watering ramming and dressing of earth etc complete with the cost of earth royalty, taxes, freight etc with cost of material labour and T&P etc for proper completion of work | Earth filling under the floor in area between tower foundation and retaining wall in including the cost of soil to be obtained by the contractor from outside including watering ramming and dressing of earth etc complete with the cost of earth royalty, taxes, freight etc with cost of material labour and T&P etc for proper completion of work |
| 7 | First class brick work on edge floor laid including preparation of base to proper slope including supply of all material labour and T&P etc for proper completion of work | First class brick work on edge floor laid including preparation of base to proper slope including supply of all material labour and T&P etc for proper completion of work |
| 8 | Tor steel in plain work such as reinforced concrete or reinforced brick work(when not included in all over rates )wrought to required shape as necessary including bending for proper completion of work and including supply of steel its wastage bend ,beam and authorized overlapping as required for proper completion of the work. 12 mm Midsteel ring 8 mm (Extra Bar) | Tor steel in plain work such as reinforced concrete or reinforced brick work(when not included in all over rates )wrought to required shape as necessary including bending for proper completion of work and including supply of steel its wastage bend ,beam and authorized overlapping as required for proper completion of the work. 12 mm Midsteel ring 8 mm (Extra Bar) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender