Tender For Turnkey Work For Server Room For Halcyon 1&2 And True Beam At Rt Block Actrec
Tender Overview
Project Description
Tender for Turnkey Work For Server Room For Halcyon 1&2 And True Beam At Rt Block Actrec
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 20-Aug-2026 | date extension | Date | 26-Aug-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | HVAC BOQ |
| 2 | Split AC |
| 3 | Supply, Installation, Testing & Commissioning (SITC) of 3.0 TR High Wall Split Type Air Conditioner complete with Indoor Unit (IDU), Outdoor Unit (ODU), inverter rotary/scroll compressor, R-32 or any eco-friendly refrigerant, wireless remote controller,wall mounting accessories, vibration isolators, refrigerant charging, testing and commissioning complete.The unit shall be suitable for operation on 415V ±10%, 50 Hz, 3 Phase AC power supply and capable of cooling, dehumidification and air circulation. The AC shall deliver rated cooling capacity up to 42°C ambient temperature and operate safely up to 50°C outdoor ambient temperature. The equipment shall comply with IS 1391 (Part-II): 2023 and relevant BIS standards. Minimum 5 years OEM warranty on compressor and PCB. Complete as required and as per site conditions. Note:- Outdoor unit stand fabicated or L-type shall be consider in this price. |
| 4 | 3 TR (1200CFM) Split Ac |
| 5 | Supply, laying, testing and commissioning of refrigerant grade seamless copper piping comprising 3/8\\" (9.52 mm OD) liquid line and 5/8\\" (15.88 mm OD) gas line suitable or equivalant to 3.0 TR Split Air Conditioner, complete with 19 mm thick closed cell elastomeric nitrile rubber insulation with GC cloth , fittings, bends, supports, brazing, nitrogen pressure testing, vacuumization and commissioning complete as required. individual piping cannot be consider. Note- all the piping should be laid on cable tray. normal Drill should be part of the piping installation. |
| 6 | Supply, laying, testing and commissioning of 4 Core x 2.5 Sq.mm FRLS copper power cable or as require for 3.0 T split AC from electrical panel to Outdoor Unit (ODU) of 3.0 TR Split Air Conditioner, complete with glands, lugs, termination and testing as required. |
| 7 | Supply, laying, testing and commissioning of 4 Core x 1.5 Sq.mm FRLS copper interconnecting power/control cable or as require for 3.0T Split AC between Outdoor Unit (ODU) and Indoor Unit (IDU) of 3.0 TR Split Air Conditioner, complete with terminations and connections as per OEM recommendations. |
| 8 | Supply and fixing of 100 mm × 75 mm heavy-duty PVC C-Casing/Trunking with cover, bends, tees, reducers, end caps and accessories for routing insulated copper refrigerant piping, drain pipe and interconnecting cable of 3.0 TR Split Air Conditioner, complete as required. |
| 9 | SITC PVC drain pipe having pressure holding of 6kg/cm2. Drain piping complete with all accessories with 12mm Nitrile Rubber Insulation. normal Drill should be part of the piping installation. |
| 10 | 25 mm Dia. |
| 11 | 40mm Dia |
| 12 | Providing and carrying out core cutting through RCC/brick wall of suitable diameter (100 mm to 125 mm) for routing insulated copper refrigerant piping, drain piping and interconnecting cable for 3.0 TR Split Air Conditioner, including making good the damaged surface after installation, complete as required. Note:- In case Normal Drill for making hole it should not be considered. |
| 13 | Dismantling, removal, and shifting of existing GI ducts ( approximately 200 sqmtr ducting) including all branches, grills, dampers, fire dampers, diffusers, VCDs, flexible canvas connections, plenums, and related accessories from the site to the scrap yard as per engineer’s instructions, including careful handling, temporary storage, and compliance with safety standards. |
| 14 | Dismantling and safe removal of existing Window AC control wiring, All supports and accessories, complete with shifting of dismantled material to designated location and making good of dismantled area as per site conditions and instructions of Engineer-in-Charge. |
| 15 | Supply, installation, testing and commissioning of condensate drain pump suitable for 3.0 TR Split Air Conditioner indoor unit, complete with float switch, reservoir tank, non-return valve, power cable, discharge piping connections, supports, accessories and automatic operation, as per OEM recommendations and site requirements, complete as required. |
| 16 | Environmental condition assessment Test ( G1 Test) |
| 17 | Environmental condition assessment, testing and certification of Bunker, Console, Server, TPS and UPS rooms for compliance with ISA-71.04 G1 standards, including monitoring of temperature, relative humidity, air quality and corrosive contaminants, complete as required. |
| 18 | SITC of Portable type dehumidifier with capacity of 60 LPD as per instructed and as directed by OIC-ES. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 3 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender