Bids Are invited for Repair And Overhauling Service - Substrate Treatment And Protective Coatings Application At Machinery Compartments Onboard In Ship; Any Other Suitable Brand; No; Buyer Premises - Manual Cleaning, Dewatering Using Submersible Pump
Tender Overview
Project Description
Bids Are invited for Repair And Overhauling Service - Substrate Treatment And Protective Coatings Application At Machinery Compartments Onboard In Ship; Any Other Suitable Brand; No; Buyer Premises - Manual Cleaning, Dewatering Using Submersible Pumps And Positioning Of Blowers/ Exhaust Fans..Ncd 1491 & No 53/16 , Low Pressure Fresh Water Cleaning To 5000 Psi.Ncd 1491 & No 53/16 , Moping & Degreasing.Ncd 1491 & No 53/16 , Substrate Treatment Under Machinery Foundations, Frames Coaming And Other Inaccessible Area Surface Profile Between 25-50 Microns Is Required (Lp Air To Be Supplied By Firm) And Positioning Of Blowers/ Exhaust Fans And Profile Inspection By Nace Qualified Inspector..Ncd 1491 & No 53/16 , Primer Application By Brush / Airless Spray (Dft 40-50 Microns) And Maintaining Of Environmental Conditions (Temperature & Humidity) Until Curing Of Coating Using Dehumidifiers/Heaters & Blowers And Inspection By Nace Qualified Inspector. .Ncd 1491 & No 53/16 , Epoxy / Anti-Corrosive Paint Application By Brush / Airless Spray (Dft 150 - 200 Microns) And Maintaining Of Environmental Conditions Temperature & Humidity Until Curing Of Coating Using Dehumidifiers/Heaters & Blowers And Inspection By Nace Qualified Inspector. (Personnel Shall Compulsorily Wear Airfed Hood With A Window Infront During Application Of Primer/ Painting)..Ncd 1491 & No 53/16 , Metal Scaffolding (Material And Erection By Firm).As Per User Certification , Inspection And Certification By Nace Qualified Supervisor At Every Stage (Post Surface Preparation And Every Paint Coat). Conduct Of Salt Paper Test, Dft Measurement, Surface Gauge Checks, Porosity Check And Other Checks..As Per User Certification
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Manual cleaning, dewatering using submersible pumps and positioning of blowers/ exhaust fans..NCD 1491 & NO 53/16 | Manual cleaning, dewatering using submersible pumps and positioning of blowers/ exhaust fans..NCD 1491 & NO 53/16 |
| 2 | Low pressure fresh water cleaning to 5000 psi.NCD 1491 & NO 53/16 | Low pressure fresh water cleaning to 5000 psi.NCD 1491 & NO 53/16 |
| 3 | Moping & degreasing.NCD 1491 & NO 53/16 | Moping & degreasing.NCD 1491 & NO 53/16 |
| 4 | Substrate treatment under machinery foundations, frames coaming and other inaccessible area surface profile between 25-50 microns is required (LP air to be supplied by firm) and positioning of blowers/ exhaust fans and profile inspection by NACE qualified inspector..NCD 1491 & NO 53/16 | Substrate treatment under machinery foundations, frames coaming and other inaccessible area surface profile between 25-50 microns is required (LP air to be supplied by firm) and positioning of blowers/ exhaust fans and profile inspection by NACE qualified inspector..NCD 1491 & NO 53/16 |
| 5 | Primer application by brush / airless spray (DFT 40-50 microns) and maintaining of environmental conditions (temperature & humidity) until curing of coating using dehumidifiers/heaters & blowers and inspection by NACE qualified inspector. .NCD 1491 & NO 53/16 | Primer application by brush / airless spray (DFT 40-50 microns) and maintaining of environmental conditions (temperature & humidity) until curing of coating using dehumidifiers/heaters & blowers and inspection by NACE qualified inspector. .NCD 1491 & NO 53/16 |
| 6 | Epoxy / Anti-corrosive paint application by brush / airless spray (DFT 150 - 200 microns) and maintaining of environmental conditions temperature & humidity until curing of coating using dehumidifiers/heaters & blowers and inspection by NACE qualified inspector. (Personnel shall compulsorily wear airfed hood with a window infront during application of primer/ painting)..NCD 1491 & NO 53/16 | Epoxy / Anti-corrosive paint application by brush / airless spray (DFT 150 - 200 microns) and maintaining of environmental conditions temperature & humidity until curing of coating using dehumidifiers/heaters & blowers and inspection by NACE qualified inspector. (Personnel shall compulsorily wear airfed hood with a window infront during application of primer/ painting)..NCD 1491 & NO 53/16 |
| 7 | Metal scaffolding (Material and Erection by firm).As per user certification | Metal scaffolding (Material and Erection by firm).As per user certification |
| 8 | Inspection and certification by NACE qualified supervisor at every stage (post surface preparation and every paint coat). Conduct of salt paper test, DFT measurement, surface gauge checks, porosity check and other checks..As per user certification | Inspection and certification by NACE qualified supervisor at every stage (post surface preparation and every paint coat). Conduct of salt paper test, DFT measurement, surface gauge checks, porosity check and other checks..As per user certification |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 19 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 19 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender