Tender For Providing Guards With Security Personnels Deployed By The Security Agency For Guarding And Protecting Govt. Property For The Office Of The Superintending Engineer, North Bengal Circle-Ii, Phe Dte. (Period For 01/09/2026 To 30/09/2027).
Tender Overview
Project Description
Tender for Providing Guards With Security Personnels Deployed By The Security Agency For Guarding And Protecting Govt. Property For The Office Of The Superintending Engineer, North Bengal Circle-Ii, Phe Dte. (Period For 01/09/2026 To 30/09/2027).
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 12-Aug-2026 | WBPHED/EE/MD/NIeT_03 of 2026-2027, SL. No. 02 | Other | 19-Aug-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Providing Guards with security personnels deployed by the security agency for guarding and protecting Govt. property for the Office of the Superintending Engineer, North Bengal Circle-II, PHE Dte.Note:-1) Contractor have to pay Rs. 487.00/head/day to the Labourers engaged as Pump Operator/ Valve Operator/ Guards excluding 8.33% Bonus.2) Bonus @ 8.33% should be given as per rules. Rate Analysis for ESIC & EPF with Ref Memo No PHE/1095/O-5/16(Pt.) Dated 22/05/2024. (Rate Analysis Attached) 3) Final Rate will be based on actual EPF & ESIC remmited.6 Nos Guards= 395 X 6 = 2370 Days |
| 2 | Reimbersement of operators/Guard payment as per EPF & ESIC rules.Note:- 1) Pump Operator/ Valve Operator/IEP /AIRP Operator/ Guards are entitled to get a weekly day of with a prior approval of the JE/AE in charge or will be paid as per the existing rules. 2) Payment will be made as per actual basis. Duly approved leave details & vouchers (if required) need to be submitted for payment.6 Nos Guards= 56 X 6 +20 = 356 Days |
| 3 | Provisional arrear payment, if labour wages gets enhanced by the competent authority for daily operation of valves & pipe line inspection/IRP maintenance (This item will be paid only on production of the paid amount to the labour by the contractor in accordance with office order). |
| 4 | Add Includng GST @18% |
| 5 | Add Includng CESS @1% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 4 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender