Tender For repair maintenance electrical installation & Fans, Compound Lights, Pump Sets, Ro System & Air Conditioning Units Installed At Dseu-1 (Polytechnic & Printing Technology) Pusa, New Delhi During 2026-27. (Sh : Comprehensive Maintenance Of Ro
Tender Overview
Project Description
Tender for repair maintenance electrical installation & Fans, Compound Lights, Pump Sets, Ro System & Air Conditioning Units Installed At Dseu-1 (Polytechnic & Printing Technology) Pusa, New Delhi During 2026-27. (Sh : Comprehensive Maintenance Of Ro & Water Cooler).
BOQ
| Sl. No. | Item Description |
| 1 | Annual Comprehensive Maintenance of 9 Nos. Eureka Forbes RO System 50 LPH capacity connected with water coolers i/c three mandatory services in a month (cleaning of All Filters), repair/ replacement of all electrical and electronic spare parts and one time replacement of consumables once in a year like Particulate Filter 20”(2 x 10”), Sediment Filter 20” (2 x 10”), Pre Carbon Filter 20” and Post Carbon Filter 20” (Except TFC Membranes), attending complaints within 24 working hours with complete overhauling and servicing etc. as required. Dismantle shall retained by the contractor. Total Machines at various Locations: (9 Nos. for 12 Months) |
| 2 | Supply & Replacement of TFC RO Membrane 75 GPD i/c testing, commissioning etc. as required (Dismantle shall be retained by the contractor. |
| 3 | Supplying and Charging of Refrigerant Gas in the Water Coolers after pressure testing leak detection and rectifying the brakage (if any) testing and commissioning complete as reqd. |
| 4 | Supply and replacement of 10\\" Particulate/Sediment Filter Eureka Forbes make i/c Leak testing, commissioning etc complete as reqd. at site. Dismantle shall be retained by the contractor. |
| 5 | Supply and replacement of 20\\" or 2 x 10\\" Particulate/Sediment Filter Eureka Forbes make i/c Leak testing, commissioning etc complete as reqd. at site. Dismantle shall be retained by the contractor. |
| 6 | Supply and replacement of separately installed 20\\" Bowl for Pre filter Eureka Forbes make Leak testing, commissioning etc complete as reqd at site.dismantle shall retained by the contractor. |
| 7 | Supply & replacement of defective tap of water cooler with new pvc coated metal Tap i/c leakage testing & rectifying the same as reqd.dismantle shall retained by the contractor. |
| 8 | Supply and replacement of Pressure Generating Pump with Automated switching Device. |
| 9 | Supplying and replacement of Chases of AG Revia RO 50 LPH. |
| 10 | Supply and replacement of Automated switching on/off device for Water level monitoring of storage Water Cooler. |
| 11 | Supplying & replacement of RO Spare Mounting Tray of AG Revia RO 50 LPH. |
| 12 | Supplying & replacement of Back-Plate of AG Revia RO 50 LPH. |
| 13 | Supplying & replacement of Top cover of AG Revia RO 50 LPH |
| 14 | Supplying & fixing of Wall Mount/Floo mount Stand for 50 LPH RO system. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 1 dayTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender