Tender For Overhauling Of The Pumping Machinery By Supplying Of Necessary Materials (Viz. Bearing, Carrier Bush Etc.) At Rwps Of Dongaria Aaa Surface Water Based Water Supply Project In South 24 Pgs. District, Under Smd, Phe Dte.
Tender Overview
Project Description
Tender for Overhauling Of The Pumping Machinery By Supplying Of Necessary Materials (Viz. Bearing, Carrier Bush Etc.) At Rwps Of Dongaria Aaa Surface Water Based Water Supply Project In South 24 Pgs. District, Under Smd, Phe Dte.
BOQ
| Sl. No. | Item Description |
| 1 | Raw Water Pump (Set-1) |
| 2 | Inspection and comprehensive examination of the defective noisy Centrifugal Pumping Machinery (Q-3450 m3/hr, H-17 m, Motor Rating-250kW) for detecting the actual fault associated with the same by using proper testing equipment and engaging competent technicians, having adequate knowledge pertaining to the same as per direction of EIC. |
| 3 | Dismantling the said pumping machinery with all its related mountings and accessories (viz. Motor, Shafts, Impeller, Bearings, Bushes, etc.) part by part, after disconnecting the relevant electrical/mechanical connections, adopting appropriate safety precautions by using necessary T&P and by engaging competent personnel followed by segregating the spares into serviceable and unserviceable ones. This includes the charges for machining the coupling holes to match the new bushes and bolts along with the cost for hiring additional dewatering pump for bailing out the water from the pump house whiie going on the work (for 3 days appx.). |
| 4 | Supply & delivery of the following materials as per sample at site:- |
| 5 | Bearing (No. 7220 BECBM)(Make-SKF) |
| 6 | Carrier Bush or Bearing Bush Carrier (Manufactured as per sample) |
| 7 | Reassembling the pumping machinery by using the dismantled spares (after having been serviced properly), the newly supplied ones (Item No. 3.01-3.02) as well as the departmentally supplied materials (viz. Intermediate Shafts, Neck Ring, Pump Coupling Bushes, Fasteners etc.), followed by reinstallation of the same by using necessary T&P and by engaging competent personnel. The work includes thorough cleaning, providing necessary hardware and consumables required, and carrying out the execution of the work by deploying expert technicians. The job also involves proper alignment of the pumping machinery with the existing motor in position, using a dial gauge to achieve radial alignment within 0-0.002\\" and axial alignment within 0-0.0015\\" as directed. |
| 8 | Testing and commissioning of the entire installation up to the entire satisfaction of EIC. |
| 9 | Vacuum Pump (Set-2) |
| 10 | Inspection and comprehensive examination of the defective Vacuum Pumping Machinery (10 HP) for detecting the actual fault associated with the same by using proper testing equipment and engaging competent technicians, having adequate knowledge pertaining to the same as per direction of EIC. |
| 11 | Cost for transportation of the defective P/M from site to the nearest workshop (Distance : Within 40km) and back to the site after necessary repairing by hired vehicle including loading and unloading charges at both ends. |
| 12 | Dismantling the said pumping machinery with all its related mountings and accessories (viz. Coupling, Motor, Pump, Bearings, Bushes, etc.) part by part, after disconnecting the relevant electrical/mechanical connections, adopting appropriate safety precautions by using necessary T&P and by engaging competent personnel followed by segregating the spares into serviceable and unserviceable ones. This includes the charges for machining the coupling holes to match the new bushes and bolts. |
| 13 | Supply and delivery of the following spares as per sample for the above motor set :- |
| 14 | Bearing 6307 |
| 15 | Reassembling the pumping machinery by using the dismantled spares (after having been serviced properly), and the newly supplied ones (Item No. 9.01 and bushes along with the fasteners of suitable size etc.), followed by reinstallation of the same. The work includes thorough cleaning, providing necessary hardware and consumables required, and execution to be carried out by an expert technician team, using appropriate T&P. The job also involves proper alignment of the pumping machinery with the existing motor in position, using a dial gauge to achieve the desired radial and axial alignment as directed. |
| 16 | Testing and commissioning of the entire installation up to the entire satisfaction of EIC. |
| 17 | Add GST @ 18% |
| 18 | Add Cess @ 1% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 19 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 21 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender