Power Government Departments Closing in 2 days TDR #56861236

Tender For Construction Of (A) New 33/11 Kv Sub Station At Netra (B) Erection Of 33 Kv O/H Line (3.0 Km) With Acsr Dog Conductor T-Off From 33 Kv Kelawa City Feeder From 132 Kv Gss Baori (C) Erection Of 11 Kv Inter Connection (3.20 Km) From 33/11 Kv

Issued by Government Departments · Jodhpur, Rajasthan
Tender Value
8.13 Lakhs
Estimated cost
Bid Submission
20 Aug 2026
2 days left
EMD
16262
Bank guarantee accepted
Document Fee
2950
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Jodhpur → Rajasthan
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Construction Of (A) New 33/11 Kv Sub Station At Netra (B) Erection Of 33 Kv O/H Line (3.0 Km) With Acsr Dog Conductor T-Off From 33 Kv Kelawa City Feeder From 132 Kv Gss Baori (C) Erection Of 11 Kv Inter Connection (3.20 Km) From 33/11 Kv Gss Netra Under O&M, Sub-Division Baori On Labour Rate Basis-2025

BOQ

Name of Work:- Construction of (A) New 33/11 KV Sub Station at Netra (B) Erection of 33 KV O/H Line (3.0 Km) with ACSR Dog conductor T-off from 33 KV Kelawa city feeder from 132 KV GSS Baori (C) Erection of 11 KV Inter Connection (3.20 Km) from 33/11 KV GSS Netra under O&M, Sub-Division Baori on Labour rate basis-2025
Sl. No. Item Description
1PART 'A\\" Construction of New 33/11 KV Sub Station at Netra under O&M, Sub-Division Baori
2Levelling of ground
3Levelling of ground up to 30 cm.to 90 CM depth. with tractor and T&P required as per condition of ground including removal of rubbish plants from ground & marking of boundary with lime powder.(Including all lead & lifting)
4Excavation of pit in ordinary rock which does not require blasting/murrad (In Jodhpur Discom) to erect various supports and stay sets including stacking of excavated muck from the edge of excavation/pit.
5(A) Height of poles/R.S.Joist/M.S. Rail Size of pit
69 Mtr/ 1.2mx0.6mx1.50 m deep
7Excavation of pit in Hard rock ( Where blasting is required) to erect various supports and stay sets including stacking of excavated muck from the edge of excavation/pit.
8(A) Height of poles/R.S.Joist/M.S. Rail Size of pit
99 Mtr/ 1.2mx0.6mx1.50 m deep
10Earth work excavation and foundation of platfrom of transformers and brakers including dressing of sides and ramming of bottoms .Liftup to 1.5 Meter including taking out the excavated soil and depositing and refilling of jhiri, watering and ramming and disposal of surplus excavated soil as directed with in a lead of 50 Meter.
11Hard soil mixed with boulders
12Providing and laying cement concrete including compaction etc, complete using stone aggregate 40 mm nominal size (hand broken ) in foundation plinth excluding the cost of shuttering using 1 cement:5 sand:10 aggregate mix.
13Plaster on new surface on walls in cement ,sand mortar 1:6 including racking of joint etc. complete fine finsh 25 mm thick.
14Cement concrete flooring grade 1:2:4 (1-cement :2- coarse sand :4-graded stone aggregate ) rounding off edges etc.but excluding cost of nosing of steps etc. complete
1575 mm thick with 20 mm thick nominal size aggregate.
16Masonry for foundation and plinth
17Randon Rubble stone masonry for foundation and plinth in cement sand mortar 1:6(1 Cement : 6 Sand) including labour charges.
18Safe carriage of PCC poles including loading / un-loading
19a) 9 Mtr. Long-400 Kg /11 Mtr. PCC pole
20With in 10 KM
21Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.
22b) 9 Mtr. Long PCC pole
23With in 10 KM
24Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.
25Safe carriage of steel( fabricated and unfabricated) i.e. M.S. Rails,R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking in Nigam store /at work site
26With in10 KM
27Safe Carriage of insulator, hardware, cable etc.including loading/unloading and stacking in Nigam.stores etc.
28With in10 KM
29Safe carriage of 11/.4 KV 3 Phase distribution transformer including loading/unloading.from store to site (These charges will be 1.5 times for both sides )
30b) 25 & 40 KVA
31With in10 KM
32Above 10 Kms. & upto 30 Kms Add for each Km.or part thereof.
33Safe carriage of breakers/kiosks etc. including loading/ unloading and stacking in Nigam stores
34With in10 KM
35Above 10 Kms. & upto 30 Kms Add for each Km.or part thereof.
36Safe loading of power/ distribution transformer.
37(A) 33/11 KV power transformer.
38Above 1.6 MVA & upto 3.15 MVA
39Safe unloading of power/distribution transformers
40a) 33/11 KV power transformer.
41Above 1.6 MVA & upto 3.15 MVA
42Fixing of 11kv B&S/T&C type disc insulator for 33kv lines (each unit consiting of 1 nos .disc.& 1set of H/W) on terminal point including fixing of hardware andstrips.
43Fixing of 33kv pin insulator with pins.
44Assembly. Installation & commissioning of gang operated isolating switch on erected structure with setting for accurate operation including fixing of allied accessories completein all respect with post insulator and jumpering on both ends for connection with the system. The nuts and bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates.
45(B)G.O. switch . without earthing blade.
4633kv G.O.switch
4711kv G.O.switch
48Assembly and installation of Horn Gap fuse set (set of 3nos)on erected structure as per design, complete in all respectwith post insulator including jumpering on both ends for connection with the system. The nuts & bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates.
4933 kv Horn Gap fuse set.
5011 kv Horn Gap fuse set.
51Installation of lightening arrestors on erected structure /support (set of 3 nos) including connection with earth by wire /strip as required and jumpering etc. The nuts & boltswill be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates,
52(A)sub-station type
5333 KV L.A. set
5411 KV L.A. set
55Installation testing as per Nigams norm & commissioning of 11/0.4KV distribution transformer on erected supports including fixing of base channels as per requirment jumpering on HV&LV side, crimping of lugs/ clamping earth connections of body and neutral of transformer with wire /strip (as already provided with earthing ) complete in all respect. The PG clamps nuts & bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates,
5625 and 40 KVA
57Laying of 1100 V, LT 3.5/4 core PVC/XLPE cable, of aluminiumconductor and fixing with cable clamps making conections/jumpers by alluminium lugs/ PG clamps of required size onLV side of distribution transformer/ LT distribution mains onone end and with MCB with /with isolater unit/ pillar box on theother end. Lugs should be crimped with crimping tool.Lugs/P.G.clamps will by provided by the contractor ,for which payment will be made as per prevalling Discom store issue rates.(outgoing feeder cable will also be considered as circuit)
58a) 25 Sq.mm
59Three nos. Earthing of each 11/0.4 KV distribution transformer /sub-station with M.S.Rod 20mm dia 3 meter long and driving them into earth by mechanical means at a distance as per approved design & drawing & specification.The work includes flattening of top ends of M.S.rod drilling a hole of 9/16\\" dia.at flattened top and tightening of M.S.flat 50x6mm/25x3mm/(having 3 hole 2ends and 1mm middle) with nuts and bolts with M.S.rods top end hole.The flat will also be welded with M.S.rod.The end will be connected to equipments as under in sequence.
60Mesh earthing for 33/11 kv sub-station as per approved map &design usingMS flat 50X6mm/MS road 20mm dia includinglaying of flat/rod at the depth of 0.65 Mtrs.,welding & jointing at joints , structures & equipments etc.asunder:
61Excavation of trench of 0.65Mtrs.depth and 0.5Mtr.width
62Ordinary rock ( where blasting is not required.)
63Laying of MS flat /MS rod in 0.65Mtr.deep excavated trench and welding of MS flat/rod continuosly with 100 mm overlaping for straight joint including coating of MS flat joints with molten bitumen and covering joint with bitumen impregnated tape to protect from rust.
64Shaping of MS flat for connecting the equipments with earthmesh .The work includes the welding of MS flat with equipments / structure and also with earth mesh.The work also includes coating of MS flat joint with molten bitumen and covering jointwith bitumen impregnated tape to protect from rust.
65Preparation of spikes made of M.S Rod of 20 mm dia and 3 Mtr.length as per design and requirment to be driven in earth by mechanical means and Providing & .fastening of suitable clampswith the M.S. Rod, connection of earth wire/stay wire/MS flat in clamp depending on type of soil:
66Where drilling is not required
67Filling of trench with available excavated muck in layers of 20cm (Max.)consolidating each deposited layer by ramming & watering with lead up to 50 Mtr, and lift up to 1.5 Mtr.
68Painting of exposed portion of MS flat/rod with two coats of red-oxide primer and two coats of green enamel paint.including material.
69Pipe Earthing for Power Transformer at 33 / 11 KV S/S:- Supply & erection of earthing electrode shall consist of G.I. Pipe 100 mm,of 3 Mtr Length. The electrode shall be buried as far as practicable 3 meters below ground level. Wherever possible, earth electrodes shall be located as near the water tap, water drain or near down take pipe. Earth electrodes shall not be installed in proximity to a metal fence. It shall be kept clear of the buildings foundations and in no case it shall be nearer than 2 meters from the outer face of the wall. The electrode shall be surrounded with layer of charcoal dust and salt mixture through out the length. The 100 mm GI pipe shall be provided with holes of 12 mm dia. drilled at 75 mm interval upto 2.5 meters length from bottom. The top of the pipe shall be provided with a G.I. threaded cap for watering the earth through a pipe. A Clamp with Pati of 12\\" of M.S. Flat of size 50X6 mm shall be fixed (Bolted) on the top edge of the pipe which in turn shall be connected to Neutral / Body of the Power Transformer through M.S. Flat size 50X6 mm. The G.I. cap over the GI pipe shall be housed in a masonry chamber, approximately 300 mm x 300 mm x 300 mm deep. The masonry chamber shall be provided with a RCC inspection cover resting over a RCC frame, embedded in masonry.
70Erection of PCC poles in excavated pit in alignment after checking the same with plumb line as per approved design & drawing of 33/11kv sub-station.The pit should be back filled with the soil with proper ramming below 30cm ground level and then muffed above 15cm average ground level with cement concrete ratio1:3:6.The charges for muffing will be paid extra as per chapter code no 5.7 The nuts & bolts will be supplied by the contractor for which payment will be made at the prevailing store issue rates.
71(B) IN RURAL AREA
72PCC Poles 9 Mtr. Long
73Laying / stringing of bus bar with ACSR Dog & jumper connection using tie rod ,33KV /11KV insulator strings,required hardware,P.G.clamps/T clamps etc.as per requirement including Yconnections at bus bar jumpering point as per the direction of engineer in-charge.
74ACSR DOG/RABBIT
75Erection of OCB/Kiosk/VCB complete with accessories including use of special tools & conducting all pre-commissioning test before energization,filling oil etc. complete in all respect with erection & grouting of structure (excluding civil works). The relays will be tested by Discom.
7611 KV VCB (Outdoor )
77PART \\"B\\" Erection of 33 KV Line for Connection new Sub Station at Netra under O&M, Sub-Division Baori
78Conducting route survey as per approved route map and pegging of route with section point/ double pole location.
79Trimming of tree branches/plants and preparing route approchases for proposed line.
80Excavation of pit in ordinary rock which does not require blasting/murrad (In Jodhpur Discom) to erect various supports and stay sets including stacking of excavated muck from the edge of excavation/pit.
81(A) Height of poles/R.S.Joist/M.S. Rail Size of pit
829 Mtr/ 1.2mx0.6mx1.50 m deep
83(B) Lattice Tower /Size of pit
8412.8/12.6 Mtr/ 1.5mx1.5m x2.10 m deep
85(C)Stay set/Depth of pit
868'x 3/4\\" -0.75x0.5x1.6 m
87Safe carriage of PCC poles including loading / un-loading
88a) 9 Mtr. Long-400 Kg /11 Mtr. PCC pole
89With in 10 KM
90Safe carriage of steel( fabricated and unfabricated) i.e. M.S. Rails,R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking in Nigam store /at work site
91With in10 KM
92Safe Carriage of insulator, hardware, cable etc.including loading/unloading and stacking in Nigam.stores etc.
93With in10 KM
94Safe carriage of fabricated lattice towers structures and sub-station structures type AB, AB beams, isolators structures etc. including loading/unloading and stacking in the Nigam. Stores / at work site.
95With in10 KM
96Erection of all type of steel supports in the excavated pit in alignment after checking the same with plumb line including fixing of cross arms and top hamper before erecting the supports. The support should be grouted and muffed in cement concrete of ratio 1:3:6 as per item No. 5.7 the remaining portion of the pit will be back filled with soil. The nuts & bolts will be provided by the contractor as per Nigam's specification for which payment will be made at the prevailing store issue rates. The cost muffing and grouting will be paid extra.
97Lattice Structure
98Erection of PCC poles in excavated pit with fixing of brackets,cross arms & top hampers as required in alignment after checking the same with plumb line. The support is to be back filled with soil with proper ramming. The nuts & bolts are to be provided by the contractor as per Nigam's specification for which the payment will be made at the prevailing Discom store issue rates.
99(B) IN RURAL AREA
100PCC Poles 9 Mtr. Long (400 Kg)
101Erection &assembly of 2 Pole structures of steel supports or PCC poles in excavated pit in alignment after checking the same with plumb line.Including fixing of complete steel structure for line D.P.The support is to be back filled with soil with proper ramming.The nuts &bolts are to be provided by the contractor as per Nigams specfication for which the payment will be made at the prevailing Discom store issue rates.
102PCC Poles 9 Mtr. Long(400 Kg.)/11Mtr.long
103Erection & fixing of G.I.Stay sets with anchor plates in excavated pit in required position and back filling with soil with proper ramming.The work includes fixing of stay clamps.Stay insulator with stay wire at both ends with proper tension.Size of stay set/stay wire.
1048'x3/4\\" with 7/8 SWG stay wire
105Providing and laying of cement concrete in ratio 1:3:6 using 43 grade cement,river sand and 12 mm to 20 mm graded blast crusher broken in pit/foundation according to the size/type of supports/stay set including compaction/curing for 21days in steel plates shuttering /farmer base.
106Fixing and assembly of disc.point channel pair with pilot plates&clamps on erected double pole structure as per design. The nuts &bolts are to be provided by the contractor as per Nigams specification for which payment will be made as per prevailing Discom store issue rates.
10733 KV line
108Fixing of 11kv B&S/T&C type disc insulator for 33kv lines (each unit consiting of 3 nos .disc.& 1set of H/W) on terminal point including fixing of hardware andstrips.
109Fixing of 33kv pin insulator with pins.
110Assembly. Installation & commissioning of gang operated isolating switch on erected structure with setting for accurate operation including fixing of allied accessories completein all respect with post insulator and jumpering on both ends for connection with the system. The nuts and bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates.
111(B)G.O. switch . without earthing blade.
11233kv G.O.switch
113Laying ,jointing , stringing, tensioning and clamping of conductor with proper sag as directed , using bolted type hardware including binding on pin insulators,jumpering on section points with binding wire / P.G.clamps.Aluminium jointing sleeves will be used for jointing the conductor.The line must stand at proper voltage on charging.The contractor will be provide P.G.clamps for which payment will be made as per prevailing Discom issue rate.
114(B) IN RURAL AREA
115ACSR DOG
116Laying , jointing,stringing,tensioning and clamping of G.I. Earthwire continuosly on single/double pole by using earth clamps /nuts & bolts with washers and earth reel etc. including proper binding at each end. The nuts and bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates.
117(B) IN RURAL AREA
118G.I.Earth wire 6 SWG
119Earthing of line for all type of supports as per REC construction standards using Stay wire/GI wire with one pcs.of M.S.rod20mm dia each 3 meter long and driving into earth by mechanical means as per approved design. Drawing &specification.All material except MS rod,MS flat & stay wirewill be supplied by the contractor.If material is supplied by the contractor ,the payment will be made as per prevailing Discomstore issue rates.(In case of PCC poles earthing must be connected with earthwire already available on PCC pole at bottom)
120Part 'C' Erection of 11 KV Inter Connection from 33/11 KV GSS Netra under O&M, Sub-Division Baori
121Conducting route survey as per approved route map and pegging of route with section point/ double pole location.
122Trimming of tree branches/plants and preparing route approchases for proposed line.
123Excavation of pit in ordinary rock which does not require blasting/murrad (In Jodhpur Discom) to erect various supports and stay sets including stacking of excavated muck from the edge of excavation/pit.
124(A) Height of poles/R.S.Joist/M.S. Rail Size of pit
1259 Mtr/ 1.2mx0.6mx1.50 m deep
126(C)Stay set/Depth of pit
1276'x 5/8\\" -0.75x0.5x1.35 m
128Safe carriage of PCC poles including loading / un-loading
129a) 9 Mtr. Long-200 Kg /11 Mtr. PCC pole
130With in 10 KM
131Safe carriage of steel( fabricated and unfabricated) i.e. M.S. Rails,R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking in Nigam store /at work site
132With in10 KM
133Safe Carriage of insulator, hardware, cable etc.including loading/unloading and stacking in Nigam.stores etc.
134With in10 KM
135Erection of PCC poles in excavated pit with fixing of brackets,cross arms & top hampers as required in alignment after checking the same with plumb line. The support is to be back filled with soil with proper ramming. The nuts & bolts are to be provided by the contractor as per Nigam's specification for which the payment will be made at the prevailing Discom store issue rates.
136(B) IN RURAL AREA
137PCC Poles 9 Mtr. Long (200 Kg)
138Erection & Assembly of 2 Pole Structures of steel supports or PCC Poles in excavated Pit in alignment after checking the same with plumb line. Including fixing of complete steel structure for line D.P. the support is to be back filled with soil with proper ramming. the nuts & Bolts are to be provided by the contractor as per Nigam specification for which the payment will be made at the prevailing Discom store issue rates
139PCC Poles 9 Mtr Long (200 Kg.)
140Erection & fixing of G.I.Stay sets with anchor plates in excavated pit in required position and back filling with soil with proper ramming.The work includes fixing of stay clamps.Stay insulator with stay wire at both ends with proper tension.Size of stay set/stay wire.
1416'x5/8\\" with 7/10 SWG stay wire
142Fixing and assembly of disc.point channel pair with pilot plates top hampers & clamps on erected single pole structure as per design. The nuts &bolts are to be provided by the contractor as per Nigams specification for which payment will be made as per prevailing Discom store issue rates,
14311 KV line
144Fixing of 11kv B&S/T&C type disc insulator of 11kv lines (each unit consiting of 1nos.disc.& 1set of H/W) on terminal point including fixing of hardware and strips.
145Fixing of 11 kv pin insulator with pins.
146Laying ,jointing , stringing, tensioning and clamping of conductor with proper sag as directed , using bolted type hardware including binding on pin insulators,jumpering on section points with binding wire / P.G.clamps.Aluminium jointing sleeves will be used for jointing the conductor.The line must stand at proper voltage on charging.The contractor will be provide P.G.clamps for which payment will be made as per prevailing Discom issue rate.
147(B) IN RURAL AREA
148ACSR RABBIT CONDUCTOR
149Laying , jointing,stringing,tensioning and clamping of G.I. Earthwire continuosly on single/double pole by using earth clamps /nuts & bolts with washers and earth reel etc. including proper binding at each end. The nuts and bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates.
150G.I.Earth wire 8 SWG
151Note-1.Dismentaling, if any: Dismentaling charges for all the items will be 60% of item rates of erection charges. However, charges for transportation of the material from works site in the Nigam/sub division store shall be paid as item rate of that material(Chapter-III, Transportation of material). The payment will be made after issuance of certificate by Engineer In Charge that all the dismentaled material has been safely received in the Nigam/sub division storeNote-2. The nut & bolts will be provided/supplied by the contractor which will confirm to relevant ISS & payment will be made as per prevailing Discom store issue rate.Note-3. The quality of material supplied by the contractor be got checked & approved by the circle SE. Note-4. In case of pole upper end of the GI wire provided for earthing shall be bolted with cross arm.Note-5. The qty mentioned for normal soil/ordinary rock. Hard soil which does not required drilling and Hard Rock/ CC road which required drilling are tentative & shall be payble as per actual site condition and due verification by Engineer In Charge.Note-6. Safe Carriage of PCC poles/other material including Loading/un-loading as per actual distance of work-site from place of lifting & shall be payble as per actual distance and due verification by Engineer In Charge. Note-7. Unit rates are inclusive of GST and shall be paid if applicable.Note-8. The work should be carried out as per specification and standard measurement of Jodhpur Discom. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56861236
AUTHORITY Government Departments
TENDER VALUE 8.13 Lakhs
LAST DATE 20-08-2026
Authority
Authority Name Jodhpur Vidyut Vitaran Nigam Limited
Work Description Tender for Construction Of (A) New 33/11 Kv Sub Station At Netra (B) Erection Of 33 Kv O/H Line (3.0 Km) With Acsr Dog Conductor T-Off From 33 Kv Kelawa City Feeder From 132 Kv Gss Baori (C) Erection Of 11 Kv Inter Connection (3.20 Km) From 33/11 Kv Gss Netra Under O&M, Sub-Division Baori On Labour Rate Basis-2025
Basic Detail
Tender No TNDC 61
Bidding Type Tender
Location
City Jodhpur
State Rajasthan
Key Dates
Publish Date 05 Aug 2026
Submission Date 20 Aug 2026
Open Date 21 Aug 2026
Finance
Tender Value 8.13 Lakhs
Tender Fee 2950
EMD 16262
Exemption Available
Document List
622fb65f-e96e-4e38-a6aa-daecbbd28331.html
BOQ_1034997.xls
NITTNDC61.pdf
SPECSTNDC61.pdf
Tendernotice_1 (30).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 05, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 20, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 2 days
Aug 21, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 3 days

Tender Documents

Download All (ZIP) ↓
html

622fb65f-e96e-4e38-a6aa-daecbbd28331.html

xls

BOQ_1034997.xls

pdf

NITTNDC61.pdf

pdf

SPECSTNDC61.pdf

pdf

Tendernotice_1 (30).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders